Back to AD

AD 74-18-03 ACTIVE

Main Landing Gear Axle Elbow
Key Information
AD Number 74-18-03 Status Active
Effective Date August 30, 1974 Issue Date Not specified
Docket Number Unknown Amendment 39-1937
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) Airlift International, Inc. Curtiss-Wright Corporation Flying Tiger Line, Inc. L. B. Smith Aircraft Corporation Skyways International Trading and Transport Co. Tempo Design Corporation
Model(s) C-46A C-46D C-46F C-46R C-46E C-46A C-46D C-46E C-46F C-46A C-46D C-46F C-46F C-46/CW20-T Super C-46/CW20-T
Regulatory Text

74-18-03 CURTISS-WRIGHT: Amendment 39-1937. Applies to all Model C-46 Series airplanes certificated in all categories.

To prevent failures of the main landing gear axle elbows, Part Number 8107-63L and 8107-63R, accomplish the following, unless already accomplished:

(a) For aircraft having main landing gear axle elbows with less than 7800 hours' time in service on the effective date of this AD, at 8,000 hours' time in service and thereafter, at intervals not to exceed 500 hours' time in service, inspect the part numbers 8107-63L and -63R elbows for cracks visually with a ten power or higher glass or in an equivalent FAA approved manner.

(b) For aircraft having main landing gear axle elbows with more than 7800 hours' time in service on the effective date of this AD, within 200 hours' time in service after the effective date of this AD, and thereafter at intervals not to exceed 500 hours' time in service, inspect the Part Numbers 8107-63L and -63R elbows for cracks visually with a ten power or higher glass or in an equivalent FAA approved manner.

(c) Replace cracked elbows with serviceable parts before further flight.

(d) Upon request of the operator, an FAA maintenance inspector, subject to prior approval of the Chief, Engineering and Manufacturing Branch, FAA Southern Region, may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for such operator.

This amendment becomes effective August 30, 1974.