| AD Number | 68-20-01 | Status | Active |
| Effective Date | October 28, 1968 | Issue Date | Not specified |
| Docket Number | Unknown | Amendment | 39-658 |
| Product Type | ["Aircraft"] | Product Subtype | ["Large Airplane"] |
| CFR Part | --- - Part 39 | CFR Section | N/A |
| Citation | This information is not available. | ||
| Manufacturer(s) | Sabreliner Corporation |
| Model(s) | NA-265 NA-265-20 NA-265-30 NA-265-40 NA-265-60 |
68-20-01 NORTH AMERICAN ROCKWELL: Amendment 39-658. Applies to Models NA-265 (serial Nos. 265-1 through 265-88 and 276-1 through 276-55), NA-265-20 (Serial Nos. 270-1 through 270-6), NA-265-30 (Serial Nos. 277-1 through 277-10 and 285-1 through 285-32), NA-265-40 (Serial Nos. 282-1 through 282-95 and 287-1), and NA-265-60 (Serial Nos. 306-1 through 306-17) airplanes.
Compliance required as indicated within the next 100 hours time in service after the effective date of this AD, unless already accomplished.
Small cracks have been discovered in the area near the attachment bolt holes of the horizontal stabilizer support fitting. To prevent failure of the horizontal stabilizer support fittings, accomplish the following:
(a) Inspect the horizontal stabilizer support fittings P/N 265-313459 and 265- 313463-11 for evidence of cracking in accordance with information contained in North American Rockwell Sabreliner Field Service Bulletin No. 68-4, dated January 25, 1968, or later FAA approved revision.
(b) Cracked horizontal stabilizer support fittings must be removed before further flight, marked conspicuously to avoid inadvertent return to service, and replaced with new or serviceable fittings.
(c) Check clearance between horizontal stabilizer support fittings P/N 265-313459 or 265-313463-11 and the canted bulkhead at fuselage station 457 and shim as necessary in accordance with information contained in North American Rockwell Sabreliner Field Service Bulletin No. 68-4, dated January 25, 1968, or later FAA approved revision.
This amendment becomes effective on October 28, 1968.