Back to AD

AD 46-06-04 ACTIVE

Propeller Spinner Attaching Lugs
Key Information
AD Number 46-06-04 Status Active
Effective Date Not specified Issue Date Not specified
Docket Number Unknown Amendment N/A
Product Type ["Aircraft"] Product Subtype ["Small Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) Consolidated Vultee Aircraft Corporation, Stinson Division
Model(s) BT-13 BT-13A (Army SNV-1) BT-13B (Navy SNV-2)
Regulatory Text

46-06-04 CONVAIR: (Was Service Note 3 of AD-2-571-2.) Applies Only to BT-13 Series Airplanes Equipped With a Propeller Spinner.

Inspect the propeller spinner attaching lugs after each 25 hours of operation for cracks or signs of impending failure. If cracks are found, the lugs should be reinforced or the spinner should be removed entirely.