Back to AD

AD 97-23-12 ACTIVE

MLG Upper Torque Link Fusible Pin
Key Information
AD Number 97-23-12 Status Active
Effective Date December 17, 1997 Issue Date Not specified
Docket Number 97-NM-165-AD Amendment 39-10200
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 [62 FR 60644 NO. 218 11/12/97] CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) Not specified
Model(s) F.28 Mark 0070 F.28 Mark 0100
Summary

This amendment adopts a new airworthiness directive (AD), applicable to certain Fokker Model F28 Mark 0100 and 0070 series airplanes, that requires replacement of the fusible pin in the upper torque link of the main landing gear with an improved pin. This amendment is prompted by issuance of mandatory continuing airworthiness information by a foreign civil airworthiness authority. The actions specified by this AD are intended to prevent reduced structural integrity and potential collapse of the main landing gear.

Action Required

Final rule

Regulatory Text

97-23-12 FOKKER: Amendment 39-10200. Docket 97-NM-165-AD.
Applicability: Model F28 Mark 0100 and 0070 series airplanes, equipped with Menasco Aerospace Ltd. main landing gears having part number (P/N) 41050, including the fusible upper torque link pin having P/N 41223-1; certificated in any category.

NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been otherwise modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance: Required as indicated, unless accomplished previously.

To prevent reduced structural integrity and potential collapse of the main landing gear, accomplish the following:

(a) Within 12 months after the effective date of this AD, replace any main landing gear upper torque link fusible pin having P/N 41223-1 with a pin having P/N 41223-3, in accordance with Fokker Service Bulletin SBF100-32-099, dated June 14, 1996.

(b) As of the effective date of this AD, no person shall install a main landing gear upper torque link fusible pin having P/N 41223-1 on any airplane.

(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, International Branch, ANM-116, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, International Branch, ANM-116.

NOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the International Branch, ANM-116.

(d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.

(e) The replacement shall be done in accordance with Fokker Service Bulletin SBF100-32- 099, dated June 14, 1996. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Officeof the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

NOTE 3: The subject of this AD is addressed in Dutch airworthiness directive BLA 1996-074 (A), dated June 28, 1996.

(f) This amendment becomes effective on December 17, 1997.

Supplementary Information

A proposal to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) to include an airworthiness directive (AD) that is applicable to certain Fokker Model F28 Mark 0100 and 0070 series airplanes was published in the Federal Register on August 11, 1997 (62 FR 42951). That action proposed to require replacement of the fusible pin in the upper torque link of the main landing gear with an improved pin.

Comments
Interested persons have been afforded an opportunity to participate in the making of this amendment. Due consideration has been given to the two comments received.

The commenters state that the proposed AD does not affect their fleet of airplanes.

Conclusion
After careful review of the available data, including the comments noted above, the FAA has determined that air safety and the public interest require the adoption of the rule as proposed.

Cost Impact
The FAA estimates that 10 Fokker Model F28 Mark 0100 and 0070 seriesairplanes of U.S. registry will be affected by this AD, that it will take approximately 14 work hours per airplane to accomplish the required actions, and that the average labor rate is $60 per work hour. Required parts will be supplied by the manufacturer at no cost to the operators. Based on these figures, the cost impact of the AD on U.S. operators is estimated to be $8,400, or $840 per airplane.

The cost impact figure discussed above is based on assumptions that no operator has yet accomplished any of the requirements of this AD action, and that no operator would accomplish those actions in the future if this AD were not adopted.

Regulatory Impact
The regulations adopted herein will not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. Therefore, in accordance with Executive Order 12612, it is determined that this final rule does not have sufficient federalism implications to warrant the preparation of a Federalism Assessment.

For the reasons discussed above, I certify that this action (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A final evaluation has been prepared for this action and it is contained in the Rules Docket. A copy of it may be obtained from the Rules Docket at the location provided under the caption "ADDRESSES."

List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39 - AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.

39.13 [Amended]
2. Section 39.13 is amended by adding the following new airworthiness directive:

Addresses

The service information referenced in this AD may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. This information may be examined at the Federal Aviation Administration (FAA), Transport Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

For Further Information Contact

International Branch, ANM-116, FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425) 227-2110; fax (425) 227-1149