Back to AD

AD 89-23-14 ACTIVE

Main Rotor Collective Tubes
Key Information
AD Number 89-23-14 Status Active
Effective Date December 04, 1989 Issue Date Not specified
Docket Number 89-ASW-26 Amendment 39-6392
Product Type ["Aircraft"] Product Subtype ["Rotorcraft"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) MD Helicopters, Inc.
Model(s) 369 369A 369D 369E 369F 369FF 369H 369HE 369HM 369HS
Regulatory Text

89-23-14 MCDONNELL DOUGLAS HELICOPTER COMPANY (MDHC): Amendment 39-6392. Docket No. 89-ASW-26.

Applicability: Model 369 series helicopters, certificated in any category, with main rotor collective tube, P/N 369A7009-BSC; longitudinal control tube, P/N 369A7011-BSC; lateral control tube, P/N 369A7012-BSC; and tail rotor control tube, P/N 369A7007-BSC.

Compliance: Required as indicated, unless already accomplished.

To prevent fatigue failure of the control tubes which could result in loss of control of the helicopter, accomplish the following:

(a) Within 25 hours' time in service after the effective date of this AD, and at intervals of 100 hours' time in service until the requirements of paragraph (c) are accomplished, remove and inspect for cracks the swaged ends of each main rotor collective control tube (P/N 369A7009-BSC), longitudinal control tube (P/N 369A7011-BSC), lateral control tube (P/N 369A7012-BSC), and each tail rotor control tube (P/N 369A7007-BSC)installed on a helicopter. If external cracks are observed as a result of this inspection, replace the control tube with a serviceable unit prior to further flight.

NOTE: PART I of MDHC Service Information Notice DN-158.1, EN-48.1, FN-36.1, and HN-217.1 pertains to this AD.

(b) Prior to installation, inspect for cracks the swaged ends of each main rotor collective control tube (P/N 369A7009-BSC), longitudinal control tube (P/N 369A7011-BSC), lateral control tube (P/N 369A7012-BSC), and tail rotor control tube (P/N 369A7007-BSC) from spares inventory. Reject control tubes found to be cracked as a result of this inspection.

(c) Within 600 hours' time in service after the effective date of this AD remove and inspect each main rotor collective control tube (P/N 369A7009-BSC), longitudinal control tube (P/N 369A7011-BSC), lateral control tube (P/N 369A7012-BSC), and tail rotor control tube (P/N 369A7007-BSC) in accordance with the requirements of paragraph (a). Replace cracked tubes with BASIC (BSC) part numbers with the corresponding FAA-approved -5 configuration. Modify remaining BASIC (BSC) tubes to the corresponding FAA-approved -5 configuration before reinstallation.

NOTE: PART II of MDHC Service Information Notice DN-158, EN-48, FN-36 or HN- 217 pertains to rework and reinstallation procedures.

(d) In accordance with FAR Sections 21.197 and 21.199, the helicopter may be flown to a base where compliance with the AD may be accomplished.

(e) An alternate method of compliance with this AD which provides an equivalent level of safety may be used if approved by the Manager, Los Angeles Aircraft Certification Office, FAA, 3229 E. Spring Street, Long Beach, California.

This amendment (39-6392, AD 89-23-14) becomes effective on December 4, 1989.