Back to AD

AD 67-22-03 ACTIVE

Main Gear Downlock Rod
Key Information
AD Number 67-22-03 Status Active
Effective Date July 24, 1967 Issue Date Not specified
Docket Number Unknown Amendment 39-445
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) The Boeing Company
Model(s) 727-100 Series 727-100C Series 727-200 Series 727-200F Series 727 Series 727C Series
Regulatory Text

67-22-03 BOEING: Amdt. No. 39-445, Part 39, Federal Register July 22, 1967. Applies to Model 727 Series Airplanes Listed in Boeing Service Bulletin No. 32-123(R-1 dated June 5, 1967). \n\n\tCompliance required as indicated. \n\n\tTo detect visible wear and deformation of the main gear downlock rod and its attach bolts, to prevent wear and failure of the attach bolts caused by bolt rotation, and to prevent out-of- sequence operation of the door sequence valve following either rod failure or bolt failure, accomplish the following: \n\n\t(a)\tFor those airplanes having a main gear downlock rod assembly with 800 or more hours' time in service on the effective date of this AD, within the next 50 hours time in service, unless already accomplished within the previous 750 hours time in service, inspect each main gear downlock rod assembly for wear and deformation in accordance with Boeing telegraphic Service Bulletin No. 32-123 dated April 14, 1967, which is also repeated in the section entitled "I. PLANNING INFORMATION . . . C. DESCRIPTION . . . PART I . . ." of Boeing Service Bulletin 32-123(R-1 dated June 5, 1967). \n\n\t(b)\tIf wear or deformation is detected during the inspection conducted in accordance with Paragraph (a), unless already accomplished in accordance with Subparagraphs (1) or (2) of this Paragraph, replace the affected part(s) before further flight (except that the airplane may be flown with the gear down in accordance with FAR 21.197 to a base where the replacement or modification can be performed) by accomplishing (1) or (2) below: \n\n\t\t(1)\tReplace the affected part(s) with a new part(s) of the same part number and comply with Subparagraph (2) of this Paragraph within 750 hours' time in service after this replacement; or \n\n\t\t(2)\tExcept as provided in this Subparagraph, modify the main gear downlock rod assembly(ies) incorporating the replacement part(s) in accordance with the section entitled "II. ACCOMPLISHMENT INSTRUCTIONS . . . PART II . . ." ofBoeing Service Bulletin No. 32- 123(R-1 dated June 5, 1967) or later FAA-approved revision or by an equivalent method approved by the Chief, Aircraft Engineering Division, FAA Western Region. Replacement of the downlock rod must be accomplished by installing downlock rod P/N 69-33654-2 with metal-cal BAC27DLG14 installed or P/N 69-33654-3 with metal-cal BAC27DLG14 installed. Provisions of the Boeing Service Bulletin referenced herein applicable to modification of the downlock pushrod are not incorporated by reference in this AD and the modification of this assembly need not be accomplished hereunder. \n\n\t(c)\tFor all airplanes, within the next 800 hours' time in service after the effective date of this AD, unless already accomplished, modify each main gear downlock rod assembly in accordance with that section entitled "II. ACCOMPLISHMENT INSTRUCTIONS . . . PART II . . . " of Boeing Service Bulletin No. 32-123(R-1 dated June 5, 1967) and the main gear uplock assembly in accordance with that section entitled "II . ACCOMPLISHMENT INSTRUCTIONS . . . PART III . . ." of that Service Bulletin or later FAA-approved revision or by an equivalent method approved by the Chief, Aircraft Engineering Division, FAA Western Region. Replacement of the downlock rod must be accomplished by installing downlock rod P/N 69- 33654-2 with metal-cal BAC27DLG14 installed, or P/N 69-33654-3 with metal-cal BAC27DLG14 installed. Provisions of the Boeing Service Bulletin referenced herein applicable to a modification of the downlock pushrod are not incorporated by reference in this AD and the modification of this assembly need not be accomplished hereunder. \n\n\tNOTE. - The absence of a requirement in Paragraphs (b) and (c) of this AD to modify the downlock pushrod assembly is not intended to discourage operators from incorporating this modification. It merely indicates that the FAA does not deem this modification necessary to correct the unsafe condition described in this AD. \n\n\t(d)\tOperators who have not kept records of hours' time in service of individual main gear downlock rod assemblies shall substitute hours' time in service of the airplane in lieu thereof. \n\n\t(e)\tUpon request of the operator, an FAA Maintenance Inspector, subject to prior approval of the Regional Director, FAA Western Region, may adjust the compliance times herein if the request contains substantiating data to justify the increase for the operator. \n\n\tThis amendment effective July 24, 1967.