| AD Number | 2000-10-23 | Status | Active |
| Effective Date | June 30, 2000 | Issue Date | July 28, 2000 |
| Docket Number | 97-NM-88-AD | Amendment | 39-11748 |
| Product Type | ["Aircraft"] | Product Subtype | ["Large Airplane"] |
| CFR Part | --- - Part 39 (65 FR 34061 5/26/2000) | CFR Section | N/A |
| Citation | This information is not available. | ||
| Manufacturer(s) | The Boeing Company |
| Model(s) | 747-100 Series 747-100B Series 747-100B SUD Series 747-200B Series 747-200C Series 747-200F Series 747-300 Series 747SP Series 747SR Series |
| Supersedes | 97-26-21 |
This amendment supersedes an existing airworthiness directive (AD), applicable to certain Boeing Model 747-100, -200, -300, 747SR, and 747SP series airplanes, that currently requires a one-time inspection to detect cracking of the longeron splice fittings at stringer 11, on the left and right sides at body station 2598, and replacement of any cracked fitting with a new fitting. This amendment reduces the compliance time for accomplishment of the currently required inspection and adds a new requirement for repetitive inspections. This amendment is prompted by reports that fatigue cracking was found on longeron splice fittings. The actions specified by this AD are intended to detect and correct such fatigue cracking, which could result in reduced controllability of the horizontal stabilizer.
Final rule.
2000-10-23 BOEING: Amendment 39-11748. Docket 97-NM-88-AD. Supersedes AD 97-26-21, Amendment 39-10264.\n\n\tApplicability: Model 747-100, 747-200, 747-300, 747SR, and 747SP series airplanes; having line positions 201 through 886 inclusive; certificated in any category. \n\n\tNOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actionsto address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct fatigue cracking of the longeron splice fittings at stringer 11, which could result in reduced controllability of the horizontal stabilizer, accomplish the following: \n\nInitial Inspection\n\n\t(a)\tPerform a one-time detailed visual inspection to detect cracking of the longeron fittings at stringer 11, on the left and right sides at body station 2598, at the time specified in paragraph (a)(1) or (a)(2) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2410, Revision 2, dated October 30, 1997, including Addendum; or Boeing Service Bulletin 747-53A2410, Revision 3, dated March 12, 1998, including Addendum. After the effective date of this AD, only Revision 3 shall be used.\n\n\t\t(1)\tFor airplanes that have accumulated fewer than 17,000 total flight cycles and 63,000 total flight hours as of the effective date of this AD: Inspect at the later of the times specified in paragraph (a)(1)(i) or (a)(1)(ii) of this AD.\n\n\t\t\t(i)\tPrior to the accumulation of 17,000 total flight cycles or 63,000 total flight hours, whichever occurs first.\n\n\t\t\t(ii)\tWithin 1,800 flight cycles or 7,000 flight hours after the effective date of this AD, whichever occurs first.\n\n\t\t(2)\tFor airplanes that have accumulated 17,000 total flight cycles or more, or 63,000 total flight hours or more, as of the effective date of this AD: Inspect at the earlier of the times specified in paragraphs (a)(2)(i) and (a)(2)(ii) of this AD.\n\n\t\t\t(i)\tPrior to the accumulation of 22,000 total flight cycles or 78,000 total flight hours, whichever occurs first.\n\n\t\t\t(ii)\tWithin 1,800 flight cycles or 7,000 flight hours after the effective date of this AD, whichever occurs first.\n\n\tNOTE 2: Where there are differences between the AD and the service bulletin, the AD prevails.\n\n\tNOTE 3: For the purposes of this AD, a detailed visual inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required."\n\nRepetitive Inspections\n\n\t(b)\tIf no crack is found during the inspection required by paragraph (a) of this AD, repeat the inspection one time at the later of the times specified in paragraphs (b)(1) and (b)(2) of this AD, and thereafter at intervals not to exceed 3,000 flight cycles or 18,000 flight hours, whichever occurs first.\n\n\t\t(1)\tWithin 3,000 flight cycles or 18,000 flight hours after accomplishment of the most recent inspection, whichever occurs first.\n\n\t\t(2)\tWithin 1,800 flight cycles or 7,000 flight hours after the effective date of this AD, whichever occurs first.\n\nReplacement and Repetitive Inspections\n\n\t(c)\tIf any crack is found during any inspection required by paragraph (a) or (b) of this AD: Prior to further flight, replace the cracked fitting with a new fitting, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2410, Revision 2, dated October 30, 1997, including Addendum; or Boeing Service Bulletin 747-53A2410, Revision 3, dated March 12, 1998, including Addendum. After the effective date of this AD, only Revision 3 shall be used. Then, repeat the inspection specified in paragraph (a) of this AD at the later of the times specified in paragraphs (c)(1) and (c)(2) of this AD, and thereafter at intervals not to exceed 3,000 flight cycles or 18,000 flight hours, whichever occurs first.\n\n\t\t(1)\tWithin 17,000 flight cycles or 63,000 flight hours after replacement, whichever occurs first.\n\n\t\t(2)\tWithin 1,800 flight cycles or 7,000 flight hours after the effective date of this AD, whichever occurs first.\n\nAlternative Methods of Compliance\n\n\t(d)\tAn alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO.\n\n\tNOTE 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO.\n\nSpecial Flight Permits\n\n\t(e)\tSpecial flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n \nIncorporation by Reference\n\n\t(f)\tThe actions shall be done in accordance with Boeing Alert Service Bulletin 747-53A2410, Revision 2, including Addendum, dated October 30, 1997; or Boeing Service Bulletin 747-53A2410, Revision 3, including Addendum, dated March 12, 1998. \n\n\t\t(1)\tThe incorporation by reference of Boeing Service Bulletin 747-53A2410, Revision 3, including Addendum, dated March 12, 1998, was approved previously by the Director of the Federal Register as of June 30, 2000 (65 FR 34061, May 26, 2000). \n\n\t\t(2)\tThe incorporation by reference of Boeing Alert Service Bulletin 747-53A2410, Revision 2, including Addendum, dated October 30, 1997, was approved previously by the Director of the Federal Register as of January 13, 1998 (62 FR 67550, December 29 1997).\n\n\t\t(3)\tCopies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.\n\nEffective Date\n\n\t(g)\tThe effective date of this amendment remains June 30, 2000.
A proposal to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) by superseding AD 97-26-21, amendment 39-10264 (62 FR 67550, December 29 1997), which is applicable to certain Boeing Model 747-100, -200, -300, 747SR, and 747SP series airplanes, was published in the Federal Register on February 22, 2000 (65 FR 8667). The action proposed to continue to require a one-time inspection to detect cracking of the longeron splice fittings at stringer 11, on the left and right sides at body station 2598, and replacement of any cracked fitting with a new fitting. The action also proposed to reduce the compliance time for accomplishment of the currently required inspection and add a new requirement for repetitive inspections. \n\nComments\n\n\tInterested persons have been afforded an opportunity to participate in the making of this amendment. No comments were submitted in response to the proposal or the FAA's determination of the cost to the public.Conclusion\n\n\tThe FAA has determined that air safety and the public interest require the adoption of the rule as proposed.\n\nCost Impact\n\n\tThere are approximately 685 airplanes of the affected design in the worldwide fleet. The FAA estimates that 99 airplanes of U.S. registry will be affected by this AD.\n\n\tThe inspection that is currently required by AD 97-26-21 takes approximately 32 work hours per airplane to accomplish, at an average labor rate of $60 per work hour. Based on these figures, the cost impact of the currently required actions on U.S. operators is estimated to be $190,080, or $1,920 per airplane.\n\n\tThis AD requires the same inspection currently required by AD 97-26-21 to be accomplished repetitively. Therefore, the cost impact of the requirements of this AD on U.S. operators is estimated to be $190,080, or $1,920 per airplane, per inspection cycle. \n\n\tThe cost impact figures discussed above are based on assumptions that no operator has yet accomplished anyof the requirements of this AD action, and that no operator would accomplish those actions in the future if this AD were not adopted. \n\nRegulatory Impact\n\n\tThe regulations adopted herein will not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government. Therefore, it is determined that this final rule does not have federalism implications under Executive Order 13132.\n\n\tFor the reasons discussed above, I certify that this action (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A final evaluation has been prepared for this actionand it is contained in the Rules Docket. A copy of it may be obtained from the Rules Docket at the location provided under the caption "ADDRESSES."\n\nList of Subjects in 14 CFR Part 39\n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.\n\nAdoption of the Amendment \n\n\tAccordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows: \n\nPART 39 - AIRWORTHINESS DIRECTIVES\n\n\t1. The authority citation for part 39 continues to read as follows:\nAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n§ 39.13 (Amended)\n\n\t2. Section 39.13 is amended by removing amendment 39-10264 (62 FR 67550, December 29 1997), and by adding a new airworthiness directive (AD), amendment 39-11748, to read as follows:
The incorporation by reference of Boeing Alert Service Bulletin 747-53A2410, Revision 2, including Addendum, dated October 30, 1997, as listed in the regulations, is approved by the Director of the Federal Register as of June 30, 2000.\n\n\tThe incorporation by reference of Boeing Service Bulletin 747-53A2410, Revision 3, including Addendum, dated March 12, 1998, as listed in the regulations, was approved previously by the Director of the Federal Register as of January 13, 1998 (62 FR 67550, December 29 1997).\n\nADDRESSES: The service information referenced in this AD may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. This information may be examined at the Federal Aviation Administration (FAA), Transport Airplane Directorate, Rules Docket, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Rick Kawaguchi, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Transport Airplane Directorate, Seattle Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425) 227-1153; fax (425) 227-1181.