Back to AD

AD 80-02-04 ACTIVE

Aft Pressure Bulkhead Door
Key Information
AD Number 80-02-04 Status Active
Effective Date January 21, 1980 Issue Date Not specified
Docket Number Unknown Amendment 39-3663
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) The Boeing Company
Model(s) DC-9-11 DC-9-12 DC-9-13 DC-9-14 DC-9-15 DC-9-15F DC-9-21 DC-9-31 DC-9-32 DC-9-32 (VC-9C) DC-9-32F DC-9-32F (C-9A) DC-9-32F (C-9B) DC-9-33F DC-9-34 DC-9-34F DC-9-41 DC-9-51 DC-9-81 (MD-81) DC-9-82 (MD-82) DC-9-83 (MD-83) DC-9-87 (MD-87)
Regulatory Text

80-02-04 MCDONNELL DOUGLAS: Amendment 39-3663. Applicable to all Model DC-9 series aircraft equipped with non-ventral aft pressure bulkhead door, P/N 5910367, certificated in all categories. \n\n\tCompliance required as indicated. \n\n\tTo detect cracks in the aft pressure bulkhead door, accomplish the following: \n\n\tWithin the next 25 landings, but not later than 72 elapsed hours, after the effective date of this AD, unless already accomplished in accordance with telegraphic AD T79WE-20 dated December 1, 1979, inspect the aft pressure bulkhead door as follows: \n\n\t(a)\tRemove the door from the bulkhead. \n\n\t(b)\tRemove all liner and insulation from the forward and aft sides of the door. \n\n\t(c)\tConduct a close visual inspection to detect cracks in the entire door structure including the web and doublers, paying particular attention to the areas adjacent to the inboard ends of the guide pin fittings (P/N 3913926). \n\n\t(d)\tIf cracks are found: \n\n\t\t(1)\tRepair per FAA approved data and replace the insulation and liner removed in paragraph (b), or; \n\n\t\t(2)\tThe aircraft may be operated without cabin pressurization with a placard installed in the cockpit, in full view of the pilots stating: "Pressurized flight is prohibited." \n\n\t(e)\tIf no cracks are found, replace the insulation and liner removed in paragraph (b). \n\n\t(f)\tReinstall the door in the bulkhead. \n\n\t(g)\tSpecial flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate the airplanes unpressurized to a base where the inspections or crack repair can be performed. \n\n\t(h)\tWithin five working days after the inspection required by paragraph (c) of this AD, report the results of the inspection to the Chief, Aircraft Engineering Division, FAA Western Region. (Reporting approved by the Office of Management and Budget under OMB No. 04-R0174.) \n\n\tThis amendment becomes effective January 21, 1980.