Back to AD

AD 67-32-01 ACTIVE

Fuel Pump Movement And Leakage
Key Information
AD Number 67-32-01 Status Active
Effective Date May 02, 1968 Issue Date Not specified
Docket Number Unknown Amendment 39-573
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) Airbus SAS
Model(s) BAC 1-11 200 Series BAC 1-11 400 Series
Regulatory Text

67-32-01 BRITISH AIRCRAFT CORP: Amendment 39-573. Applies to BAC 1-11 Airplanes Model/Type 212AR, 401AK, 410AQ, which have a center fuel tank fitted with Thompson Ramo fuel pumps P/N 248800/4, P/N 248800/5 or pumps manufactured under license by Plessey which include additional part number 570/1/21221/004.

Amendment 39-522 (32 F.R. 17515), AD 67-32-1, is amended.

Compliance required as indicated.

To prevent fuel pump movement and consequent fuel leakage, accomplish the following:

(a) Within the next 200 hours' time in service after the effective date of this AD, unless already accomplished, inspect the center tank fuel pump installation in accordance with BAC 1-11 Alert Service Bulletin 28-A-PM 2701, Issue 2, or later ARB-approved issue, or FAA- approved equivalent.

(b) If leaks are found when conducting the inspection required by paragraph (a), before further flight stop the leaks by repositioning the fuel booster pump and, if necessary, replacing the seals between the pump and canister.

(c) Within the next 1,000 hours' time in service after the effective date of this AD, modify the center tank fuel booster pumps in accordance with British Aircraft Corporation Service Bulletin No. 28-PM 2701 or later ARB-approved issue, or an equivalent approved by the Chief, Aircraft Certification Staff, European Region.

This amendment becomes effective May 2, 1968.