| AD Number | 61-26-02 | Status | Active |
| Effective Date | December 21, 1961 | Issue Date | Not specified |
| Docket Number | Unknown | Amendment | N/A |
| Product Type | ["Aircraft"] | Product Subtype | ["Large Airplane"] |
| CFR Part | --- - Part 39 | CFR Section | N/A |
| Citation | This information is not available. | ||
| Manufacturer(s) | Bombardier Inc. |
| Model(s) | CL-44D4 |
61-26-02 CANADAIR: Amdt. 379 Part 507 Federal Register December 21, 1961. Applies to all CL-44D4 aircraft.
Compliance required as indicated.
As a result of a fuel leak found in the line to the upper heater, the following inspection must be accomplished within the next 25 hours' time in service after the effective date of this AD unless already accomplished within the last 40 hours' time in service and at intervals of 65 hours' time in service thereafter.
With full fuel pressure in the tail heater fuel lines, inspect all fuel lines and fittings in the tail heater compartment for leaks and security of attachment. Loose lines shall be properly secured, and defective lines and fittings replaced prior to further flight.
The special inspections required by this airworthiness directive may be discontinued after incorporation of the Canadian Department of Transport and FAA approved modification.
Upon request of the operator an FAA maintenance inspector subject to priorapproval of the Chief, Engineering and Manufacturing Branch, International Division, Washington 25, D.C., may adjust the repetitive inspection intervals specified in this AD to permit compliance at an established inspection period of the operator if the request contains substantiating data to justify the increase for such operator.
This directive effective December 21, 1961.