Back to AD

AD 70-22-06 ACTIVE

Engine Cowl Fluid Drain
Key Information
AD Number 70-22-06 Status Active
Effective Date November 03, 1970 Issue Date Not specified
Docket Number Unknown Amendment 39-1100
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) The Boeing Company
Model(s) 747-100 Series 747-100B Series 747-100B SUD Series 747-200B Series 747-200C Series 747-200F Series 747-300 Series 747-400 Series 747-400D Series 747-400F Series 747SP Series 747SR Series
Regulatory Text

70-22-06\tBOEING: Amdt 39-1100. Applies to Model 747 Series Airplanes. \n\n\tCompliance required as indicated. \n\n\tTo prevent fuel leakage and possible engine fire due to a damaged or misaligned engine cowl fluid drain bellows seal, accomplish the following: \n\n\t(a)\tWithin the next 100 hours' time in service after the effective date of this AD, unless the seal modification in accordance with (b) or (c), below, have been previously accomplished, inspect the bellows seal on the gang drain assembly each time the engine cowl doors are closed to insure proper seal installation and seating on the drain duct in accordance with the inspection instructions in Boeing Service Bulletin 71-2018, Revision 2, dated June 18, 1970, or later FAA approved revision or an equivalent method approved by the Chief, Aircraft Engineering Division, FAA Western Region. \n\n\t(b)\tWithin the next 300 hours' time in service after the effective date of this AD, unless previously accomplished, inspect the aft fueldrain duct for proper alignment with the turbine case and combustion chamber drains and modify the engine fluid drain bellows seal in accordance with Boeing Service Bulletin 71-2018, Revision 2, dated June 18, 1970, or later FAA approved revision or an equivalent method approved by the Chief, Aircraft Engineering Division, FAA Western Region. \n\n\t(c)\tWithin the next 1500 hours' time in service after the effective date of this AD, unless already accomplished, modify the engine gang drain bellows seal in accordance with Boeing Service Bulletin 71-2030, dated October 16, 1970, or later FAA approved revision or an equivalent method approved by the Chief, Aircraft Engineering Division, FAA Western Region. \n\n\t(d)\tUpon completion of the work described in (c), the inspection and modification requirements of (a) and (b) are no longer applicable. \n\n\tThis amendment becomes effective on November 3, 1970.