Back to AD

AD 2011-15-03 ACTIVE

Fuel
Key Information
AD Number 2011-15-03 Status Active
Effective Date August 19, 2011 Issue Date July 01, 2011
Docket Number FAA-2010-1158 Amendment 39-16750
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation (Federal Register Volume 76, Number 136 (Friday, July 15, 2011))
Applicability
Manufacturer(s) The Boeing Company
Model(s) 747-100 Series 747-100B Series 747-100B SUD Series 747-200B Series 747-200C Series 747-200F Series 747-300 Series 747-400 Series 747-400D Series 747-400F Series 747SP Series 747SR Series
Related Airworthiness Directives
Supersedes 97-26-07
Summary

We are superseding an existing airworthiness directive (AD) that applies to the products listed above. That AD currently requires repetitive inspections to detect damage of the sleeving and wire bundles of the boost pumps of the numbers 1 and 4 main fuel tanks, and of the auxiliary tank jettison pumps (if installed); replacement of any damaged sleeving with new sleeving; and repair or replacement of any damaged wires with new wires. For airplanes on which any burned wires are found, that AD also requires an inspection to detect damage of the conduit, and replacement of any damaged conduit with a serviceable conduit. This new AD reduces the initial compliance time and repetitive inspection interval in the existing AD. This AD was prompted by fleet information indicating that the repetitive inspection interval in the existing AD is too long because excessive chafing of the sleeving continues to occur much earlier than expected between scheduled inspections. We are issuing this AD to detect and correct abrasion of the Teflon sleeving and wires in the bundles of the fuel boost pumps for the numbers 1 and 4 main fuel tanks and of the auxiliary tank jettison pumps (if installed), which could result in electrical arcing between the wires and aluminum conduit and consequent fire or explosion of the fuel tank.

Action Required

Final rule.

Regulatory Text

Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by removing airworthiness directive (AD) 97-26-07, Amendment 39-10250 (62 FR 65352, December 12, 1997), and adding the following new AD: \n\n2011-15-03 The Boeing Company: Amendment 39-16750; Docket No. FAA- 2010-1158; Directorate Identifier 2010-NM-125-AD. \n\nEffective Date \n\n\n\t(a) This AD is effective August 19, 2011. \n\nAffected ADs \n\n\n\t(b) This AD supersedes AD 97-26-07, Amendment 39-10250. \n\nApplicability \n\n\n\t(c) This AD applies to all The Boeing Company Model 747-100, - 100B, -100B SUD, -200B, -200C, -200F, -300, -400, -400D, -400F, 747SR, and 747SP series airplanes, certificated in any category.Subject \n\n\n\t(d) Air Transport Association (ATA) of America Code 28: Fuel. \n\nUnsafe Condition \n\n\n\t(e) This AD was prompted by fleet information indicating that the repetitive inspection interval in the existing AD is too long because excessive chafing of the sleeving continues to occur much earlier than expected between scheduled inspections. The Federal Aviation Administration is issuing this AD to detect and correct abrasion of the Teflon sleeving and wires in the bundles of the fuel boost pumps for the numbers 1 and 4 main fuel tanks and of the auxiliary tank jettison pumps (if installed), which could result in electrical arcing between the wires and aluminum conduit and consequent fire or explosion of the fuel tank. \n\nCompliance \n\n\n\t(f) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\nRestatement of Requirements of AD 97-26-07, Amendment 39-10250 \n\nInspections/Repair or Replace if Necessary \n\n\n\t(g) Perform an initial inspection to detect damage of the sleeving and wire bundles of the forward and aft boost pumps of the numbers 1 and 4 main fuel tanks, and of the wire bundles of the auxiliary tank jettison pumps (if installed), in accordance with Boeing Alert Service Bulletin 747-28A2204, dated December 19, 1996; Boeing Service Bulletin 747-28A2204, Revision 1, dated October 30, 1997; or Boeing Alert Service Bulletin 747-28A2204, Revision 3, dated March 11, 2010; at the time specified in paragraph (g)(1) or (g)(2) of this AD, as applicable. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-28A2204 may be used. \n\t(1) For airplanes having line numbers 001 through 432 inclusive: Inspect within 120 days after January 21, 1997 (the effective date of AD 96-26-06, amendment 39-9870, which was superseded by AD 97-26- 07). \n\t(2) For airplanes having line numbers 433 and subsequent: Inspect at the later ofthe times specified in paragraphs (g)(2)(i) or (g)(2)(ii) of this AD. \n\t(i) Prior to the accumulation of 20,000 flight cycles or 60,000 flight hours, whichever occurs first; or \n\t(ii) Within 120 days after December 29, 1997 (the effective date of AD 97-26-07). \n\t(h) Repeat the inspection required by paragraph (g) of this AD at intervals not to exceed 20,000 flight cycles or 60,000 flight hours since the last inspection, whichever occurs first, until the first inspection required by paragraph (n) of this AD has been accomplished. \n\t(i) If any damaged sleeving is found, prior to further flight, replace the sleeving with new sleeving, in accordance with Boeing Alert Service Bulletin 747-28A2204, dated December 19, 1996; Boeing Service Bulletin 747-28A2204, Revision 1, dated October 30, 1997; or Boeing Alert Service Bulletin 747-28A2204, Revision 3, dated March 11, 2010. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-28A2204 may be used. \n\t(j) If any damaged wire is found, prior to further flight, repair or replace the wire with a new wire, in accordance with Boeing Alert Service Bulletin 747-28A2204, dated December 19, 1996, Boeing Service Bulletin 747-28A2204, Revision 1, dated October 30, 1997; or Boeing Alert Service Bulletin 747-28A2204, Revision 3, dated March 11, 2010. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747-28A2204 may be used. \n\t(k) If any burned wire is found, prior to further flight, perform an inspection to detect damage of the conduit, in accordance with Boeing Alert Service Bulletin 747-28A2204, dated December 19, 1996; Boeing Service Bulletin 747-28A2204, Revision 1, dated October 30, 1997; or Boeing Alert Service Bulletin 747-28A2204, Revision 3, dated March 11, 2010. If any damage is found, prior to further flight, replace the conduit with a serviceable conduit, in accordance with Boeing Alert Service Bulletin 747-28A2204, dated December 19, 1996; BoeingService Bulletin 747-28A2204, Revision 1, dated October 30, 1997; or Boeing Alert Service Bulletin 747- 28A2204, Revision 3, dated March 11, 2010. After the effective date of this AD, only Revision 3 of Boeing Alert Service Bulletin 747- 28A2204 may be used. \n\t(l) For airplanes having line numbers 433 and subsequent: Within 14 days after accomplishing the initial inspection required by paragraph (g) of this AD, submit a report of any damaged sleeving (i.e., holes, breaks, cuts, splits), damaged wire (i.e., worn or cracked insulation, exposed conductor, indication of arcing/ burning), or damaged conduit to the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, WA 98057-3356; fax (425) 227-1181. The report shall include the information specified in paragraphs (l)(1), (l)(2), (l)(3), (l)(4), and (l)(5) of this AD. Information collection requirements contained in this regulation have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\t(1) The airplane serial number. \n\t(2) The total hours' time-in-service accumulated on the airplane. \n\t(3) The total number of flight cycles accumulated on the airplane. \n\t(4) A description of any damage found. \n\t(5) The location of where the damaged part was installed. \n\t(m) For airplanes having line numbers 433 and subsequent: Within 14 days after accomplishing the initial inspection required by paragraph (g) of this AD, submit any damaged part to the Manager, Seattle ACO. The damaged part shall be tagged to include the information specified in paragraphs (l)(1), (l)(2), (l)(3), (l)(4), and (l)(5) of this AD. Additionally, operators shall align the inner sleeving, outer sleeving, and wire as installed in the airplane, and secure the sleeving and wiring in place by taping or other means when submitting the damaged partto the Manager, Seattle ACO. Information collection requirements contained in this regulation have been approved by the OMB under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\nNew Reduced Inspection Intervals \n\nRepetitive Inspections \n\n\n\t(n) Do the next inspection required by paragraph (h) of this AD at the time specified in paragraph (n)(1) or (n)(2) of this AD, as applicable, in accordance with Boeing Alert Service Bulletin 747- 28A2204, Revision 3, dated March 11, 2010. Repeat the inspection thereafter at intervals not to exceed 15,000 flight hours. Accomplishing the initial inspection in this paragraph ends the repetitive inspection requirements of paragraph (h) of this AD. \n\t(1) For airplanes on which the inspection required by paragraph (g) of this AD has been done as of the effective date of this AD: Do the inspection at the earlier of the times specified in paragraph (n)(1)(i) and (n)(1)(ii) of this AD. \n\t(i) Within 15,000 flight hours after the most recent inspection, or within 6,000 flight \n\n((Page 41662)) \n\nhours after the effective date of this AD, whichever occurs later. \n\t(ii) Within 20,000 flight cycles or 60,000 flight hours after the most recent inspection required by paragraph (g) or (h) of this AD, whichever occurs first. \n\t(2) For airplanes on which the inspection required by paragraph (g) of this AD has not been done as of the effective date of this AD: Do the inspection before the accumulation of 15,000 total flight hours, or within 6,000 flight hours after the effective date of this AD, whichever occurs later. \n\nPaperwork Reduction Act Burden Statement \n\n\n\t(o) A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid OMB Control Number. The OMB Control Number for this information collection is 2120-0056. Public reporting for this collection of information is estimated to be approximately 5 minutes per response, including the time for reviewing instructions, completing and reviewing the collection of information. All responses to this collection of information are mandatory. Comments concerning the accuracy of this burden and suggestions for reducing the burden should be directed to the FAA at: 800 Independence Ave., SW., Washington, DC 20591, Attn: Information Collection Clearance Officer, AES-200. \n\nCredit for Actions Accomplished in Accordance With Previous Service Information \n\n\n\t(p) Actions done before the effective date of this AD in accordance with Boeing Alert Service Bulletin 747-28A2204, Revision 2, dated September 1, 2005, are acceptable for compliance with the corresponding requirements of this AD. \n\nAlternative Methods of Compliance (AMOCs) \n\n\n\t(q)(1) The Manager, Seattle ACO, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to ATTN: Tung Tran, Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 917-6505; fax (425) 917-6590. Information may be e- mailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your Principal Maintenance Inspector or Principal Avionics Inspector, as appropriate, or lacking a principal inspector, your local Flight Standards District Office. \n\t(3) AMOCs approved previously in accordance with AD 97-26-07, Amendment 39-10250, are approved as alternative methods of compliance with the correspondingrequirements of this AD. Compliance time extensions approved previously in accordance with AD 97-26-07, are not approved as alternative methods of compliance for the compliance times required by paragraph (n) of this AD. \n\nMaterial Incorporated by Reference \n\n\n\t(r) You must use Boeing Alert Service Bulletin 747-28A2204, Revision 3, dated March 11, 2010, to do the actions required by this AD, unless the AD specifies otherwise. \n\t(1) The Director of the Federal Register approved the incorporation by reference of Boeing Alert Service Bulletin 747- 28A2204, Revision 3, dated March 11, 2010, under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; e-mail me.boecom@boeing.com; Internet https://www.myboeingfleet.com. \n\t(3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at an NARA facility, call 202-741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

Supplementary Information

Discussion \n\n\n\tWe issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede an airworthiness directive (AD) 97-26-07, Amendment 39-10250 (62 FR 65352, December 12, 1997). That AD applies to the specified products. The NPRM published in the Federal Register on December 14, 2010 (75 FR 77793). That NPRM proposed to continue to require repetitive inspections to detect damage of the sleeving and wire bundles of the boost pumps of the numbers 1 and 4 main fuel tanks, and of the auxiliary tank jettison pumps (if installed); replacement of any damaged sleeving with new sleeving; and repair or replacement of any damaged wires with new wires. For airplanes on which any burned wires are found, that NPRM also proposed to continue to require an inspection to detect damage of the conduit, and replacement of any damaged conduit with a serviceable conduit. That NPRM proposed to reduce the initial compliance time and repetitive inspection interval in the existing AD. \n\nComments \n\n\n\tWe gave the public the opportunity to participate in developing this AD. The following presents the comments received on the proposal and the FAA's response to each comment. \n\nRequest To Change Heading for Restated Requirements \n\n\n\tUnited Airlines (UA) asked that we change the heading titled ''Restatement of Requirements of AD 96-26-06, Amendment 39-9870,'' which precedes paragraph (g) of the NPRM, to ''Restatement of Requirements of AD 97-26-07, Amendment 39-10250. UA pointed out that AD 97-26-07 superseded AD 96-26-06. \n\tWe agree with UA for the reason provided. Although certain requirements in AD 96-26-06 are carried over in AD 97-26-07--and in this AD--those requirements are identified by the AD number within the applicable paragraphs. We have changed the heading preceding paragraph (g) of this AD accordingly. \n\nRequest To Add Approved Alternate Method of Compliance \n\n\n\tUA asked that Boeing Alert Service Bulletin 747-28A2204,Revision 2, dated September 1, 2005, be included in paragraphs (g), (i), (j), and (k) of the NPRM. UA stated that Boeing Alert Service Bulletin 747- 28A2204, Revision 2, dated September 1, 2005, was approved as an alternative method of compliance (AMOC) to the requirements of paragraph (a) of AD 97-26-07. \n\tWe partially agree with UA. We agree that Revision 2, dated September 1, 2005, of Boeing Alert Service Bulletin 747-28A2204, was reviewed by the FAA, and approved as an AMOC to the requirements of paragraph (a) of AD 97-26-07. We do not agree that Boeing Alert Service Bulletin 747-28A2204, Revision 2, dated September 1, 2005, should be added to the requested paragraphs because those paragraphs are part of the restatement of the requirements of AD 97-26-07. However, we have added a new paragraph (p) to this AD (and reidentified subsequent paragraphs) to give operators credit for using Boeing Alert Service Bulletin 747-28A2204, Revision 2, dated September 1, 2005, to accomplish the specified actions. \n\nRequest To Include Terminating Action \n\n\n\tUA asked that terminating action be included in the NPRM. UA stated that it believes Boeing is developing a solution that would terminate the inspections required by the NPRM. \n\tWe acknowledge the comment from UA. However, Boeing has not submitted a revised service bulletin with terminating action for the repetitive inspections. We are aware that Boeing is developing a solution to the wire chafing issue, but until a modification is approved and available we are unable to reference it in the AD. However, under the provisions of paragraph (q) of this AD, we will consider requests for accomplishing a terminating modification if data are submitted to substantiate that it would provide an acceptable level of safety. We have made no change to the AD in this regard. \n\nConclusion \n\n\n\tWe reviewed the relevant data, considered the comments received, and determined that air safety and the public interest require adopting theAD with the changes described previously. We have determined that these changes will neither increase the economic burden on any operator nor increase the scope of the AD. \n\nCosts of Compliance \n\n\n\tWe estimate that this AD affects 215 airplanes of U.S. registry. The new requirements of this AD add no additional economic burden. The current costs for this AD are repeated below for the convenience of affected operators. \n\tThe actions that are required by AD 97-26-07 and retained in this AD take about 4 work-hours per airplane, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the currently required actions is $73,100, or $340 per airplane, per inspection cycle. \n\nAuthority for This Rulemaking \n\n\n\tTitle 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority. \n\tWe are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: ''General requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action. \n\nRegulatory Findings \n\n\n\tThis AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. \n\tFor the reasons discussed above, I certify that this AD: \n\t(1) Is not a ''significant regulatory action'' under Executive Order 12866, \n\t(2) Is not a ''significant rule'' under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979), \n\t(3) Will not affect intrastate aviation in Alaska, and \n\t(4) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. \n\n((Page 41661)) \n\nList of Subjects in 14 CFR Part 39 \n\n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

Addresses

For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206- 544-5000, extension 1, fax 206-766-5680; e-mail me.boecom@boeing.com; Internet https://www.myboeingfleet.com. You may review copies of the referenced service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington 98057-3356. For information on the availability of this material at the FAA, call 425- 227-1221. \n\nExamining the AD Docket \n\n\n\tYou may examine the AD docket on the Internet at http://www.regulations.gov; or in person at the Docket Management Facility between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this AD, the regulatory evaluation, any comments received, and other information. The address for the Docket Office (phone: 800-647-5527) is Document Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 \n\n((Page 41660)) \n\nNew Jersey Avenue, SE., Washington, DC 20590.

For Further Information Contact

Tung Tran, Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 917-6505; fax (425) 917-6590.