Back to AD

AD 85-03-07 ACTIVE

Feeder Fuel Lines
Key Information
AD Number 85-03-07 Status Active
Effective Date March 11, 1985 Issue Date Not specified
Docket Number Unknown Amendment 39-4999
Product Type ["Aircraft"] Product Subtype ["Large Airplane"]
CFR Part --- - Part 39 CFR Section N/A
Citation This information is not available.
Applicability
Manufacturer(s) Airbus
Model(s) A300 B2-1A A300 B2-1C A300 B2-203 A300 B2K-3C A300 B4-103 A300 B4-203 A300 B4-2C
Regulatory Text

85-03-07 AIRBUS INDUSTRIE: Amendment 39-4999. Applies to Model A300 B2 and B4 series airplanes, serial numbers as listed in the Airbus Industrie Service Bulletin A300-28-039, Revision 2, dated December 17, 1981, certificated in all categories. To prevent rupture of the feeder fuel lines located inside the engine pylons, accomplish the following, unless previously accomplished:

A. Prior to the accumulation of 4,000 hours total time in service or within the next 120 days after the effective date of this AD, whichever occurs later, install an additional clamp on the feeder fuel line located inside each engine pylon in accordance with the accomplishment instructions of the service bulletin.

B. Alternate means of compliance which provide an acceptable level of safety may be used when approved by the Manager, Seattle Aircraft Certification Office, FAA, Northwest Mountain Region.

C. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of inspections and/or modifications required by this AD.

This amendment becomes effective March 11, 1985.