AD 85-03-07

Active

Feeder Fuel Lines

Key Information
85-03-07
Active
March 11, 1985
Not specified
Unknown
39-4999
Applicability
["Aircraft"]
["Large Airplane"]
Airbus
A300 B2-1A A300 B2-1C A300 B2-203 A300 B2K-3C A300 B4-103 A300 B4-203 A300 B4-2C
Regulatory Text

85-03-07 AIRBUS INDUSTRIE: Amendment 39-4999. Applies to Model A300 B2 and B4 series airplanes, serial numbers as listed in the Airbus Industrie Service Bulletin A300-28-039, Revision 2, dated December 17, 1981, certificated in all categories. To prevent rupture of the feeder fuel lines located inside the engine pylons, accomplish the following, unless previously accomplished:

A. Prior to the accumulation of 4,000 hours total time in service or within the next 120 days after the effective date of this AD, whichever occurs later, install an additional clamp on the feeder fuel line located inside each engine pylon in accordance with the accomplishment instructions of the service bulletin.

B. Alternate means of compliance which provide an acceptable level of safety may be used when approved by the Manager, Seattle Aircraft Certification Office, FAA, Northwest Mountain Region.

C. Special flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes to a base for the accomplishment of inspections and/or modifications required by this AD.

This amendment becomes effective March 11, 1985.

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
This information is not available.
--- - Part 39
FAA Documents