A proposal to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) to include an airworthiness directive (AD) that is applicable to certain McDonnell Douglas Model DC-9-81, -82, -83, and -87 series airplanes; Model MD-88 airplanes; and Model MD-90-30 series airplanes; was published in the Federal Register on August 29, 2001 (66 FR 45657). That action proposed to require replacement of certain main landing gear (MLG) shock strut piston assemblies with new or serviceable, improved assemblies, which would constitute terminating action for the requirements of certain other ADs. \n\nComments \n\n\tInterested persons have been afforded an opportunity to participate in the making of this amendment. Due consideration has been given to the comments received. \n\nRequest To Clarify Compliance Threshold \n\n\tOne commenter requests that the FAA clarify the compliance threshold stated in paragraph (a) of the proposed AD. The commenter states that the compliance time stated in the proposed AD, "Before the accumulation of 30,000 total landings, or within 5,000 landings after the effective date of this AD, whichever occurs later," should be revised to "(Before) the accumulation of 30,000 total landings . . . on an MLG shock strut piston, or within 5,000 landings after the effective date of this AD, whichever occurs later." The commenter states that it has airplanes in its fleet with more than 40,000 total landings that are equipped with affected MLG shock strut pistons that have accumulated fewer than 1,000 landings. The commenter points out that, as written, the proposed AD would require discarding a piston with significantly fewer than 30,000 landings (i.e., the compliance threshold for the proposed replacement) because the piston is installed on an airplane with more than 30,000 total landings. The commenter requests that the compliance threshold be stated in terms of total landings on the MLG shock strut piston. \n\n\tThe FAA concurs thatthe compliance time stated in paragraph (a) of this AD needs to be clarified. As the commenter notes, the compliance threshold should be stated in terms of total accumulated landings on the MLG shock strut piston assembly, not in terms of total landings of the airplane. Paragraph (a) of this AD has been revised accordingly. Also, as a result of this change, we find it necessary to clarify what compliance time must be used if an operator cannot determine the number of landings on an MLG shock strut piston assembly. Thus, we have added the following statement to paragraph (a) of this AD: "If the MLG shock strut piston is not serialized or the number of landings on the piston cannot be conclusively determined, consider the total number of landings on the piston assembly to be equal to the total number of landings accumulated by the airplane with the highest total number of landings in the operator's fleet." \n\nRequest To Make Proposed AD Consistent With Other Related Rulemaking \n\n\tThree commenters request that we revise the proposed AD to make the AD consistent with AD 2001-09-18, amendment 39-12225 (66 FR 23840, May 10, 2001), which is one of the related rulemaking actions identified in the proposed AD. The commenters note that the compliance time in the proposed AD, the later of 30,000 total landings or 5,000 landings after the effective date, conflicts with a provision in AD 2001-09-18 that allows a 60,000-total-landing threshold for replacement of the MLG shock strut pistons, as long as repetitive inspections are performed. The commenters ask us to add the same provisions for continuing repetitive inspections into the proposed AD. One commenter suggests this could be accomplished by making the proposed AD a supersedure of AD 2001-09-18. Two commenters remark that AD 2001-09-18 gives operators more flexibility, in that it allows deferral of the replacement of the MLG shock strut piston assembly. One of these commenters also notes that allowing repetitive inspections to continue for a longer time reduces the cost impact on operators by allowing them to use spares already in their inventory. Also with regard to the cost impact, two commenters stress that the compliance times in the proposed AD would be economically burdensome for operators. The commenters state that the requirements of AD 2001-09-18 provide a level of safety that is equal to the level that would be provided by the proposed AD. \n\n\tWe do not concur. We note that AD 2001-09-18 addresses fatigue cracking only in the area of the torque link lugs of the MLG pistons. This AD addresses fatigue cracking not only in the area of the torque link lugs but also in the small radius on the base of the jackball of the MLG shock strut piston assembly. Therefore, we find that the requirements of AD 2001-09-18 are not equivalent to those of this AD. No change to the final rule is necessary in this regard. \n\nRequest To Reduce Grace Period for Compliance Time \n\n\tOne commenter, the airplane manufacturer, requests that we revise the proposed AD to reduce the compliance time from the later of 30,000 total landings or 5,000 landings after the effective date of this AD, to the later of 30,000 total landings or 2,500 landings after the effective date of this AD. The commenter states that it did not anticipate that operators would have the option to continue using affected MLG pistons beyond the compliance time recommended in the service bulletins referenced in the proposed AD, 30,000 total landings or 5,000 landings after January 31, 2000 (the date of the original issue of the service bulletin), whichever is later. The commenter notes that the proposed grace period of 5,000 landings after the effective date of this AD will apply to many airplanes, because operators with insufficient tracking information must assume that all MLG pistons in the affected fleet have accumulated landings equivalent to the airplane in their fleet with the most landings, and many of these "fleet leader"airplanes have already accumulated more than 30,000 total landings. The commenter asserts that its analysis suggests that the probability of cracking of the jackball of the piston increases with continued usage of the piston beyond 30,000 total landings. Consistent with this analysis, the commenter notes that certain relevant service bulletins that describe procedures for inspections of the jackball of the MLG piston currently specify reduced inspection intervals for MLG pistons with more than 35,000 total landings. The commenter states that the FAA's proposed compliance time for the replacement that would be required by the proposed AD will make it necessary for the airplane manufacturer to revise these relevant inspection service bulletins to specify significantly shorter repetitive inspection intervals for pistons with even more than 35,000 total landings, to ensure the continued safety of these airplanes until the replacement in this AD is accomplished. \n\n\tWe do not concur with the commenter's request to reduce the grace period for the replacement required by this AD. In developing an appropriate compliance time for the replacement required by this AD, we considered not only the degree of urgency associated with addressing the subject unsafe condition, but also the average utilization of the affected fleet and the availability of required parts. At the average usage rate for the affected airplanes, the grace period of 2,500 landings recommended by the commenter would allow about 500 days for the airplane to be modified according to the requirements of this AD. We find that this may not allow operators sufficient time to get required parts and accomplish this AD on all affected airplanes in their fleets. We have determined that the grace period of 5,000 landings, as proposed, represents an appropriate interval of time wherein an ample number of required parts will be available and affected operators may comply with this AD. Considering the nature of the MLG piston failures at the jackball that have been reported, the FAA finds that such a compliance time will not adversely affect the safety of the affected airplanes. No change to the final rule is necessary in this regard. \n\nRequest To Specify Affected Part Numbers in Applicability Statement \n\n\tOne commenter requests that we revise the applicability statement of the proposed AD to identify the specific part numbers for the MLG shock strut piston assemblies affected by this AD. While the commenter provides no specific reason for its request, we infer that the commenter is requesting this change for clarity. We do not concur that such a change is necessary. The applicability statement of this AD refers to the McDonnell Douglas Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), MD-88, and MD-90-30 airplanes listed in the two service bulletins referenced in this AD. Because no more affected airplanes will be produced, these service bulletins clearly identify all affected airplanes and all affected part numbers for the MLG shock strut piston assembly. No change to the final rule is necessary in this regard. \n\nComments on Cost Impact \n\n\tThree commenters request that we revise the Cost Impact section of the proposed AD to more accurately state the costs associated with the proposed AD. The Cost Impact section of the proposed AD states, "The manufacturer has committed previously to its customers that it will bear the cost of replacement parts, subject to the conditions in the warranty. As a result, the cost of those parts is not attributable to this proposed AD." All three commenters disagree with this statement and ask the FAA to revise the proposed AD to include the potential cost of replacement parts. The commenters point out that, while Model MD-90-30 airplanes are covered for the cost of replacement parts associated with Boeing Service Bulletin MD-90-32-031, Revision 01, dated April 25, 2001, the other airplane models subject to the proposed ADwill be covered for the full cost of replacement parts associated with Boeing Service Bulletin MD-80-32-309, Revision 01, dated April 25, 2001, only if the airplane was in warranty as of June 1991. The commenters explain that, for airplanes not covered by the warranty provisions, the cost of the replacement MLG pistons will be up to $255,438, plus, according to one commenter, $8,000 for necessary replacement bearings, seals, etc., for a total cost of up to $263,438. One of the commenters states that a review of the records of U.S.-registered airplanes subject to the proposed AD shows that approximately 320 airplanes are not covered by warranty, and the operators of these airplanes will have to purchase the replacement parts at this price. \n\n\tWe partially concur with the request to include the cost of replacement parts. As we stated in the proposed AD, the provision of required parts is "subject to the conditions in the warranty." We do not have access to, and it is not feasible to consider, the individual warranty contracts between the airplane manufacturer and the operators of affected airplanes. \n\n\tFor the benefit of affected operators, however, we will acknowledge the cost of replacement parts for airplanes that are not fully covered by warranty provisions in this AD. Also, based on the current price of replacement parts, we have also revised our cost impact estimate for the approximately 320 U.S.-registered airplanes not covered by warranty provisions. \n\n\tIn addition to the comments on the cost of parts, one of the commenters also contends that its experience shows that the proposed replacement will take 56 work hours, rather than the 28 estimated in the proposed AD. The commenter provides no data to substantiate its estimate. We are not revising the work-hour estimate in this AD. The estimate that 28 work hours will be needed for the required replacement is based on the best information currently available from the airplane manufacturer. We note that this figure is consistent with the estimate provided in the service bulletin. No change to the final rule is necessary in this regard. \n\n\tAlso, another commenter takes issue with the boilerplate statement, "The cost impact figures discussed above are based on assumptions that no operator has yet accomplished any of the requirements of this AD action, and that no operator would accomplish those actions in the future if this AD were not adopted." The commenter asserts that this statement "has the potential to mislead operators to the true cost of the proposed rule." The commenter states that it has already done the intent of the proposed AD on many airplanes in its \nfleet. \n\n\tWe infer that the commenter is requesting that we remove this statement from the AD. We do not concur. The statement to which the commenter refers is included in nearly all ADs and declares what assumptions we have made in estimating the cost of the requirements of the AD on the U.S.-registered fleet of airplanes.We use these assumptions because it is not feasible for the FAA to determine how many airplanes are already in compliance with a particular service bulletin, or whether an operator would accomplish a particular service bulletin if we didn't issue an AD to require it. Therefore, we calculate the cost impact estimate based on the assumption that the action has not been done on any U.S.-registered airplanes before the effective date of the AD, and that no operator would do the action if the FAA did not issue an AD to require it. We recognize that, in nearly all cases, some operators will have already done the AD requirements before the effective date of the AD, so the future economic impact of that AD on U.S. operators may be less than the estimated cost stated in the AD. No change to the final rule is necessary in this regard. \n\nExplanation of Change to Applicability \n\n\tThe FAA has revised the applicability statement in this final rule to identify model designations as published inthe most recent type certificate data sheet for the affected models. We have also revised related model designations in the preamble. \n\nConclusion \n\n\tAfter careful review of the available data, including the comments noted above, the FAA has determined that air safety and the public interest require the adoption of the rule with the changes previously described. The FAA has determined that these changes will neither increase the economic burden on any operator nor increase the scope of the AD. \n\nCost Impact \n\n\tThere are approximately 1,380 Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), MD-88, and MD-90-30 airplanes of the affected design in the worldwide fleet. The FAA estimates that 820 airplanes of U.S. registry will be affected by this AD, that it will take approximately 28 work hours per airplane to accomplish the required actions, and that the average labor rate is $60 per work hour. \n\n\tThe manufacturer has committed previously to its customersthat it may bear the cost of replacement parts, subject to the conditions in the warranty. For the approximately 500 U.S.-registered airplanes covered by the manufacturer's warranty provisions, the cost of required parts is not attributable to this AD. Therefore, based on the figures stated above, the cost impact of the AD on U.S. operators of these airplanes is estimated to be $840,000, or $1,680 per airplane. \n\n\tBased on information received from the airplane manufacturer, up to 320 U.S.-registered airplanes subject to this AD may NOT be covered by the manufacturer's warranty provisions. For these airplanes, required parts will cost approximately $263,438 per airplane. Based on these figures, the cost impact of the AD on U.S. operators of these airplanes is estimated to be $84,837,760, or $265,118 per airplane. \n\n\tThe cost impact figures discussed above are based on assumptions that no operator has yet accomplished any of the requirements of this AD action, and that no operatorwould accomplish those actions in the future if this AD were not adopted. The cost impact figures discussed in AD rulemaking actions represent only the time necessary to perform the specific actions actually required by the AD. These figures typically do not include incidental costs, such as the time required to gain access and close up, planning time, or time necessitated by other administrative actions. \n\nRegulatory Impact \n\n\tThe regulations adopted herein will not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government. Therefore, it is determined that this final rule does not have federalism implications under Executive Order 13132. \n\n\tFor the reasons discussed above, I certify that this action (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A final evaluation has been prepared for this action and it is contained in the Rules Docket. A copy of it may be obtained from the Rules Docket at the location provided under the caption ADDRESSES. \n\nList of Subjects in 14 CFR Part 39 \n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. \n\nAdoption of the Amendment \n\n\tAccordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows: \n\nPART 39-AIRWORTHINESS DIRECTIVES \n\n\t1. The authority citation for part 39 continues to read as follows: \n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\nSec. 39.13 (Amended) \n\n\t2. Section 39.13 is amended by adding the following new airworthiness directive: