AD 2002-08-09

Active

Alternating Current (AC) Cross-tie Relay

Key Information
2002-08-09
Active
May 08, 2002
April 12, 2002
2002-NM-37-AD
39-12717
Applicability
["Aircraft"]
["Large Airplane"]
The Boeing Company
DC-9-31
Summary

This amendment adopts a new airworthiness directive (AD) that is applicable to one McDonnell Douglas Model DC-9-31 airplane. This action requires an inspection to determine if a certain alternating current (AC) cross-tie relay is installed; replacement of a certain AC cross-tie relay with a new AC cross-tie relay; and repetitive cleaning, inspection, repair, and testing of a certain AC cross-tie relay. This action is necessary to prevent AC cross-tie relay failures, which could result in internal arcing of the relay and smoke and/or fire in the cockpit and cabin. This action is intended to address the identified unsafe condition.

Action Required

Final rule; request for comments.

Regulatory Text

2002-08-09 McDonnell Douglas: Amendment 39-12717. Docket 2002-NM-37-AD. \n\n\tApplicability: Model DC-9-31 airplane, fuselage number 0705, certificated in any category. \n\n\tNote 1: The requirements of this AD are identical to those in AD 2001-20-15, amendment 39-12463, which applies to Model DC-9 series airplanes and MD-88 airplanes listed in Boeing Alert Service Bulletin DC9-24A193, dated July 31, 2001. \n\n\tNote 2: This AD applies to the airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For an airplane that has been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo prevent internal arcing of the alternating current (AC) relay and smoke and/or fire in the cockpit and cabin, accomplish the following: \n\nInspection \n\n\t(a) Within 90 days after the effective date of this AD, perform a one-time inspection to determine if an AC cross-tie relay, part number (P/N) 914F567-3, or Sundstrand (Westinghouse) AC cross-tie relay, P/N 914F567-4, is installed, per Boeing Alert Service Bulletin DC9-24A193, Revision 01, dated January 15, 2002. \n\n\tNote 3: Inspections and replacements done before the effective date of this AD per Boeing Alert Service Bulletin DC9-24A193, dated July 31, 2001, are acceptable for compliance with the corresponding actions required by paragraphs (a) and (b) of this AD. \n\nReplacement of Any AC Cross-Tie Relay,P/N 914F567-3 \n\n\t(b) If any AC cross-tie relay, P/N 914F567-3, is found installed during the inspection required by paragraph (a) of this AD, within 90 days after the effective date of this AD, replace AC cross-tie relay, P/N 914F567-3, with a Sundstrand (Westinghouse) cross-tie relay, P/N 9008D09 series or 914F567-4, per the Accomplishment Instructions of Boeing Alert Service Bulletin DC9-24A193, Revision 01, dated January 15, 2002. \n\nMaintenance of Sundstrand (Westinghouse) AC Cross-Tie Relay, P/N 914F567-4 \n\n\t(c) If any Sundstrand (Westinghouse) AC cross-tie relay, P/N 914F567-4, is found installed during the inspection required by paragraph (a) of this AD, clean, inspect, repair, and test the relay, per Sundstrand (Westinghouse) Overhaul Manual 24-20-46, Revision 8, dated August 15, 1983, at the later of the times specified in paragraph (c)(1) and (c)(2) of this AD, except as provided by paragraph (d) of this AD. \n\n\t\t(1) Within 90 days after the effective date of this AD.(2) Within 7,000 flight hours after installation of the Sundstrand (Westinghouse) AC cross-tie relay, P/N 914F567-4. \n\n\t(d) For airplanes on which the flight hours since installation of any Sundstrand (Westinghouse) AC cross-tie relay, P/N 914F567-4, cannot be determined: Clean, inspect, repair, and test within 90 days after the effective date of this AD. \n\nRepetitive Maintenance of Sundstrand (Westinghouse) AC Cross-Tie Relay, P/N 914F567-4 \n\n\t(e) Repeat the cleaning, inspection, repair, and test required by paragraphs (c) and (d) of this AD on all Sundstrand (Westinghouse) AC cross-tie relays, P/N 914F567-4, installed per paragraphs (b) and (c) of this AD at intervals not to exceed 7,000 flight hours. \n\nAlternative Methods of Compliance \n\n\t(f) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Los Angeles ACO. \n\n\tNote 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Los Angeles ACO. \n\nSpecial Flight Permits \n\n\t(g) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(h) The actions shall be done in accordance with Boeing Alert Service Bulletin DC9-24A193, Revision 01, dated January 15, 2002; and Sundstrand (Westinghouse) Overhaul Manual 24-20-46, Revision 8, dated August 15, 1983; as applicable. \n\n\t\t(1) The incorporation by reference of Boeing Alert Service Bulletin DC9-24A193, Revision 01, dated January 15, 2002 is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. \n\n\t\t(2) The incorporation by reference of Sundstrand (Westinghouse) Overhaul Manual 24-20-46, Revision 8, dated August 15, 1983, was approved previously by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51, as of October 26, 2001 (66 FR 51857, October 11, 2001). \n\n\t\t(3) Copies may be obtained from Boeing Commercial Aircraft Group, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024); and Hamilton Sundstrand, 4747 Harrison Avenue, P.O. Box 7002, Rockford, IL 61125-7002; as applicable. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite700, Washington, DC. \n\nEffective Date \n\n\t(i) This amendment becomes effective on May 8, 2002.

Supplementary Information

The FAA has previously received reports of an incident on a McDonnell Douglas Model DC-9 series airplane involving smoke in the cockpit and cabin. Investigation of the incident revealed that the smoke was caused by an internal phase-to-phase short circuit of the alternating current (AC) cross-tie relay resulting from migration of metallic dust from electrical contact wear and accumulation of this dust. Operators have reported other instances of AC cross-tie relay failure causing arcing in the electrical panel area. An internal phase-to-phase short circuit of the AC cross-tie relay caused by migration and accumulation of metallic dust, if not corrected, could result in internal arcing of the relay and smoke and/or fire in the cockpit and cabin. \n\nOther Relevant Rulemaking \n\n\tThe FAA previously has issued AD 2001-20-15, amendment 39-12463 (66 FR 51857, October 11, 2001). That AD applies to certain Model DC-9 series airplanes and MD-88 airplanes, and requires an inspection to determine if a certain AC cross-tie relay is installed; replacement of a certain AC cross-tie relay with a new AC cross-tie relay; and repetitive cleaning, inspection, repair, and testing of a certain AC cross-tie relay. That AD refers to Boeing Alert Service Bulletin DC9-24A193, dated July 31, 2001, as an appropriate source of service information for accomplishment of certain required actions. \n\nExplanation of Relevant Service Information \n\n\tSince the issuance of AD 2001-20-15, the FAA has reviewed and approved Boeing Alert Service Bulletin DC9-24A193, Revision 01, dated January 15, 2002. The procedures described in Revision 01 of the service bulletin are identical to those in the original issue of the service bulletin. However, the effectivity listing of Revision 01 of the service bulletin includes one additional Model DC-9-31 airplane, fuselage number (F/N) 0705, which is not listed in the original issue of the service bulletin. Because the airplane with F/N 0705 may be subject to the same unsafe condition as the airplanes identified in AD 2001-20-15, the FAA has determined that it is necessary to issue a new AD to require accomplishment of the actions described in Boeing Alert Service Bulletin DC9-24A193, Revision 01, on that airplane. \n\nExplanation of the Requirements of the Rule \n\n\tSince an unsafe condition has been identified that is likely to exist or develop on other airplanes of the same type design, this AD is being issued to prevent AC cross-tie relay failures, which could result in internal arcing of the relay and smoke and/or fire in the cockpit and cabin. This AD requires accomplishment of the actions specified in Revision 01 of the service bulletin described previously, except as discussed below. If a certain AC cross-tie relay is installed, this AD also requires cleaning, inspecting, repairing, and testing the relay, per Sundstrand (Westinghouse) Overhaul Manual 24-20-46, Revision 8, dated August 15, 1983. \n\nDifferencesBetween This Rule and Service Bulletin \n\n\tOperators should note that, although the procedures described in Boeing Alert Service Bulletin DC9-24A193, Revision 01, specify maintenance of P/N 9008D09 series when it is beyond service interval limits, this AD does not require repetitive maintenance of AC cross-tie relays with that P/N because the unsafe condition has not been found on AC cross-tie relays with that P/N. \n\nDetermination of Rule's Effective Date \n\n\tSince a situation exists that requires the immediate adoption of this regulation, it is found that notice and opportunity for prior public comment hereon are impracticable, and that good cause exists for making this amendment effective in less than 30 days. \n\nComments Invited \n\n\tAlthough this action is in the form of a final rule that involves requirements affecting flight safety and, thus, was not preceded by notice and an opportunity for public comment, comments are invited on this rule. Interested persons are invited tocomment on this rule by submitting such written data, views, or arguments as they may desire. Communications shall identify the Rules Docket number and be submitted in triplicate to the address specified under the caption ADDRESSES. All communications received on or before the closing date for comments will be considered, and this rule may be amended in light of the comments received. Factual information that supports the commenter's ideas and suggestions is extremely helpful in evaluating the effectiveness of the AD action and determining whether additional rulemaking action would be needed. \n\n\tSubmit comments using the following format: \n\nOrganize comments issue-by-issue. For example, discuss a request to change the compliance time and a request to change the service bulletin reference as two separate issues. \n\nFor each issue, state what specific change to the AD is being requested. \n\nInclude justification (e.g., reasons or data) for each request. \n\n\tComments are specifically invited on the overall regulatory, economic, environmental, and energy aspects of the rule that might suggest a need to modify the rule. All comments submitted will be available, both before and after the closing date for comments, in the Rules Docket for examination by interested persons. A report that summarizes each FAA-public contact concerned with the substance of this AD will be filed in the Rules Docket. \n\n\tCommenters wishing the FAA to acknowledge receipt of their comments submitted in response to this rule must submit a self-addressed, stamped postcard on which the following statement is made: "Comments to Docket Number 2002-NM-37-AD." The postcard will be date stamped and returned to the commenter. \n\nRegulatory Impact \n\n\tThe regulations adopted herein will not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government.Therefore, it is determined that this final rule does not have federalism implications under Executive Order 13132. \n\n\tThe FAA has determined that this regulation is an emergency regulation that must be issued immediately to correct an unsafe condition in aircraft, and that it is not a "significant regulatory action" under Executive Order 12866. It has been determined further that this action involves an emergency regulation under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979). If it is determined that this emergency regulation otherwise would be significant under DOT Regulatory Policies and Procedures, a final regulatory evaluation will be prepared and placed in the Rules Docket. A copy of it, if filed, may be obtained from the Rules Docket at the location provided under the caption ADDRESSES. \n\nList of Subjects in 14 CFR Part 39 \n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. \n\nAdoption of the Amendment \n\n\tAccordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n\t1. The authority citation for part 39 continues to read as follows: \n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\nSec. 39.13 (Amended) \n\n\t2. Section 39.13 is amended by adding the following new airworthiness directive:

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
Contact Information

Elvin Wheeler, Aerospace Engineer, Systems and Equipment Branch, ANM-130L, FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California 90712-4137; telephone (562) 627-5344; fax (562) 627-5210.

References
(Federal Register: April 23, 2002 (Volume 67, Number 78))
--- - Part 39
(Page 19637-19640)
FAA Documents