2002-02-04 Boeing: Amendment 39-12632. Docket 2001-NM-07-AD. \n\n\tApplicability: Model 757 series airplanes, certificated in any category, as listed in Boeing Service Bulletins 757-29-0058 and 757- 29-0059, both dated November 9, 2000. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Requiredas indicated, unless accomplished previously. \n\n\tTo prevent chafing between the wire bundle and the left wing front spar, which could result in electrical arcing and subsequent ignition of flammable vapors and possible uncontrollable fire, accomplish the following: \n\nCompliance Time \n\n\t(a) Within 6 months from the effective date of this AD, perform the actions specified in paragraphs (a)(1), (a)(2), and (a)(3) of this AD, in accordance with Boeing Service Bulletin 757-29-0058, dated November 9, 2000 (for Model 757-200 series airplanes); or Boeing Service Bulletin 757-29-0059, also dated November 9, 2000 (for Model 757-300 series airplanes); as applicable. \n\n\tNote 2: Inspections, repairs, and installations accomplished before the effective date of this AD in accordance with Boeing Service Letter 757-SL-29-024-B, dated November 3, 1995, or 757-SL- 29-024-C, dated June 13, 2000, are acceptable for compliance with the applicable action specified in this AD. \n\nInspection and Corrective Action \n\n\t(1) Perform a detailed visual inspection of the wire bundle, part number (P/N) W5100, adjacent to front spar station 318.99 in the left wing leading edge, to detect chafing. If any damage is found, before further flight, repair the wire bundle. \n\n\tNote 3: For the purposes of this AD, a detailed visual inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\nModification \n\n\t(2) Install a caterpillar grommet to the edge of the spar lower chord in the left wing leading edge. \n\nInspection and Corrective Action \n\n\t(3) Perform a general visual inspection for proper installation of perforated Teflon sleeving on the wire bundle, P/N W5100. If sleeving does not exist or is not covering the area from 1.0 inch beyond the clamp point to 3.0 inches below the spar flange edge, before further flight, install or repair the Teflon sleeving. \n\n\tNote 4: For the purposes of this AD, a general visual inspection is defined as: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or drop-light, and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked." \n\n\tNote 5: An optional 0.5-inch spacer may be used in accordance with the applicable service bulletin above, Section 3, Accomplishment Instructions, Work Instructions, to prevent the wire bundle from contacting the lower chord of the frontspar on the left wing. \n\nReporting \n\n\t(b) If the Teflon sleeving is found missing or improperly installed during the inspection required in paragraph (a)(3) of this AD, submit a report of inspection findings to the Manager, Seattle Aircraft Certification Office (ACO), FAA, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; fax (425) 227-1181; at the applicable time specified in paragraph (b)(1) or (b)(2) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane serial number, and the number of landings and flight hours on the airplane. Information collection requirements contained in this AD have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\n\t(1) For airplanes on which the inspection is accomplished after the effective date of this AD: Submit the report within 30 days after performing the inspection required by paragraph (a)(3) of this AD. \n\n\t(2) For airplanes on which the inspection specified in paragraph (a)(3) has been accomplished prior to the effective date of this AD: Submit the report within 30 days after the effective date of this AD. \n\nAlternative Methods of Compliance \n\n\t(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 6: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(d) Special flight permits may be issued in accordance with Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(e) The actions shall be done in accordance with Boeing Service Bulletin 757-29-0058, dated November 9, 2000; or Boeing Service Bulletin 757-29-0059, dated November 9, 2000; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(f) This amendment becomes effective on March 19, 2002.