A proposal to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) to include an AD that is applicable to PW PW4000 series turbofan engines with 2nd stage HPT air seal assembly P/N 50L976 or P/N 50L960 installed was published in the Federal Register on December 27, 2000 (65 FR 81780). That action proposed to require operators to recalculate 2nd stage HPT air seal assembly cycles-in-service, based on flight hour-to-cycle ratio usage. That action also proposed to require upon recalculation, initial and repetitive on-wing borescope inspections of 2nd stage HPT air seal assemblies for cracks based on the newly calculated service life, in accordance with PW ASB No. PW4G-112-A72-233, dated August 25, 2000. Finally, that action proposed to require removal from service of any cracked seal assemblies, and the removal of seal assemblies at or before newly calculated service life limits.
Comments
Interested persons have been afforded an opportunity to participate in the making of this amendment. Due consideration has been given to the comments received.
Reference to Service Bulletin Revisions
One commenter requests that the AD reference Revision 1 of PW ASB PW4G-112-A72-233, dated January 18, 2001. That revision clarifies the procedures for mixed operation of "long mission" and "short mission" operation, and does not change the inspection requirements. The FAA agrees that Revision 1 of the ASB provides necessary clarification. However, since the publication of the NPRM, the manufacturer published several revisions to ASB PW4G-112-A72-233. The original issue of the ASB required a one-time borescope inspection for engines converted by SB PW4G-112-75-30 at the time of conversion. Revision 1, dated January 16, 2001, clarified mixed mission instructions and in-shop inspections. Revision 2, dated March 27, 2001, added a statement that if the conversion occurred before the requirement for the one-time inspection, the one-timeinspection is performed within 250 cycles of the issue date of Revision 2. Revision 3, dated August 3, 2001, removes all reference to a one-time inspection. These revisions do not change the inspection requirements referenced by the AD. Therefore, the SB reference has been changed in the AD to PW ASB PW4G-112-A72-233, Revision 3. However, inspections done in accordance with the original SB or any of the revisions are considered to be in compliance with the AD.
Mixed Cycle Operator's Instructions
Two commenters request confirmation that for the Mixed-Cycle Operator's Instructions of the SB referenced by the NPRM, the hour-to-cycle ratio does not need to be calculated prior to August 25, 2000, the original publication date of the ASB. The commenters request confirmation that the monthly hour-to-cycle ratio monitoring is required only after the initial hour-to-cycle ratio is calculated.
The FAA agrees that there appears to be some ambiguity regarding when calculations for hour-to-cycle ratio must be performed in order to determine the initial inspection threshold. The ASB states that the determination of the total number of hours and cycles a 2nd stage air seal has accumulated is done "up to this point." This means the calculation of the total number of cycles on the seals must be done in accordance with the SB for every month that the seal has been in service. Because the AD incorporates the instructions of the ASB by reference, the AD requires the calculation of equivalent cycles by the equation in paragraph 1. A. of the Mixed Cycle Operator's Instructions of the ASB on all the cycles that the seal has accumulated in service on the date that the calculation is performed. Paragraph (a) of the AD specifies that the initial inspection threshold must be determined within 30 days of the effective date of the AD. The wording of the AD does not need to be changed because the compliance is "required as indicated, unless accomplished previously." If an operator made the determination of the initial inspection threshold utilizing the August 25, 2000 date, prior to the publication of this AD, this would be in compliance with the AD. The FAA agrees that the monthly hour-to-cycle ratio monitoring is required only after the initial hour-to-cycle ratio is calculated.
Air Seal Inspection in the Shop
One commenter requests clarification as to whether the ASB requirement for air seal inspection in the shop is included in the AD. The in-shop inspection requirements are not included in the AD. The NPRM references the "On-Wing" inspection procedures of the ASB because the FAA determined by evaluation of risk assessment data that, at a minimum, the on-wing inspections are required to address the unsafe condition.
Applicable Engine Models
One commenter notes that Pratt & Whitney SB PW4G-112-A72-233, referenced in the NPRM, does not list PW4074D, and PW4090-3 as applicable engine models. However, the Boeing master change for B777 allowsinstallation of these engine models. The commenter believes this AD and the SB should reflect the PW4074D and the PW4090-3 as applicable engine models. The FAA agrees. The Applicability now reflects the PW4000 112 inch diameter series engine models: PW4074, PW4077, PW4077D, PW4084, PW4084D, PW4090, PW4090-3, PW4074D, PW4090D, PW4098.
AD Requirements for Converted Engines
One commenter requests clarification of the AD requirements for engines that have been converted from Population 3 to Population 4 or from 90K-A to 90K-B prior to the initial inspection threshold. The AD does not require the one-time post-conversion inspection for engines that were converted per SB PW4G-112-75-30 or Special Instruction 134F-98 to population 4 or population 90K-B prior to the installed air seal accruing 1,500 cycles for "long mission" operators or 3,300 cycles for "short mission" operators.
Alternative Inspection Procedure
One commenter notes that the On-Wing inspection procedure described in the Accomplishment Instructions of PW ASB PW4G-112-A72-233 allows operators to follow Boeing AMM Chapter/Section 72-52-00 as an alternative. The commenter believes the AD should also allow operators to use the procedure in the Boeing AMM Chapter/Section 72-52-00. The FAA does not agree. The FAA has not reviewed and approved the Boeing AMM Chapter/Section 72-52-00 that is cross-referenced in the ASB. Therefore, the Boeing AMM is not incorporated by reference in this AD.
250 Flight Cycle Inspection Frequency
One commenter requests that the exception provided by PW ASB PW4G-112-A72-233 that allows operators to inspect every 250 cycles rather than track hour-to-cycle ratio be permitted in the AD. The commenter asks if the monthly hour-to-cycle ratio should be calculated from the first day to the last day of each month, or twelve nearly equally spaced increments in a given year. The FAA agrees. The 250 flight cycle inspection frequency, and a cycle limit of 8,000 cycles isa more conservative approach. The FAA agrees that this option should be allowed in the AD. In addition, the FAA agrees that twelve nearly equally spaced increments in a given year satisfies the intent of the term "monthly."
Complicated Control Mechanism
One commenter expresses concern that the control mechanism established in the ASB and AD is too complicated for an operator to manage. The commenter believes that this kind of complication can cause human error, which can result in non-compliance to the ASB. The FAA disagrees that this AD establishes a control mechanism that is too complicated for an operator to manage and is prone to human error. While human error can be introduced into any process, this is unlikely to occur when diligence in process management is afforded to issues that are subject to regulatory action.
Clarification of Discussion Statements Requested
One commenter requests a clarification of statements made in the Discussion section of the NPRM. The first sentence in the Discussion states, "This proposal is prompted by reports that thirteen 2nd stage HPT air seal assemblies have been cracked in the rim area." The commenter requests that for clarification the following be added: "These thirteen air seals were operating in the hottest configuration design, which is no longer in service." The subsequent sentence would then say: "However, the current design 2nd stage HPT air seal assemblies are still operating in a temperature environment that is hotter than the manufacturer anticipated." The FAA agrees and this clarification has been added to the summary section of this amendment.
Replacement Cost Inaccuracy
One commenter notes an inaccuracy in the replacement cost used in the Economic Analysis. The cost of a new 2nd stage HPT air seal noted in the ASB is $213,990, whereas the cost stated in the NPRM is $235,950. The FAA agrees. Utilizing the $213,990 figure would decrease the overall estimated cost impact from $10,659,312 to $8,551,152, a reduction of $2,108,160.
After careful review of the available data, including the comments noted above, the FAA has determined that air safety and the public interest require the adoption of the rule with the changes described previously. The FAA has determined that these changes will neither increase the economic burden on any operator nor increase the scope of the AD.
Economic Analysis
There are approximately 233 Pratt & Whitney (PW) PW4000 series turbofan engines with 2nd stage high pressure turbine (HPT) air seal assembly part number (P/N) 50L976 or P/N 50L960 installed in the worldwide fleet. The FAA estimates that 96 engines installed on airplanes of U.S. registry will be affected by this AD. The FAA also estimates that it would take approximately 2.3 work hours per engine to accomplish the proposed on-wing borescope inspection, and that the average labor rate is $60 per work hour. The FAA estimates that approximately 47% of the certified life ofthe affected parts will be lost. Required parts would cost $213,990 per engine. Based on these figures, the total cost impact of the proposed AD on U.S. operators is estimated to be $8,551,152.
Regulatory Impact
This final rule does not have federalism implications, as defined in Executive Order 13132, because it would not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. Accordingly, the FAA has not consulted with state authorities prior to publication of this final rule.
For the reasons discussed above, I certify that this action (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under the DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) if promulgated, will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A final evaluation has been prepared for this action and it is contained in the Rules Docket. A copy of it may be obtained by contacting the Rules Docket at the location provided under the caption ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.
Adoption of the Amendment
Accordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended adding a new airworthiness directive to read as follows: