2001-15-15 Boeing: Amendment 39-12349. Docket 2000-NM-271-AD. Supersedes AD 2000-18-01, Amendment 39-11886. \n\n\tApplicability: Model 747 series airplanes powered by Pratt & Whitney JT9D-7 series engines, as listed in Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; certificated in any category. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (h)(1) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct bushing migration, corrosion, or cracking of the lugs on the bulkhead fitting of the rear engine mount, accomplish the following: \n\nRestatement of Requirements of AD 2000-18-01 \n\nRepetitive Detailed Visual Inspections \n\n\t(a) At the later of the times in paragraphs (a)(1) and (a)(2) of this AD, perform a detailed visual inspection for bushing migration, corrosion, or cracking; and a physical measurement inspection using feeler gages for bushing migration; of the lugs on the bulkhead fitting of the rear engine mount, in accordance with Part 2 of Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; or Revision 1, dated February 15, 2001. Thereafter, repeat the inspection at intervals not to exceed 90 days, until the inspections required by paragraphs (c) and (d) of this AD have been accomplished. \n\n\t\t(1) Prior to the accumulation of 10,000 total flight cycles, or within 15 years since the date of manufacture of the airplane, whichever occurs first. \n\n\t\t(2) Within 90 days after September 18, 2000 (the effective date of AD 2000-18-01, amendment 39-11886). \n\n\tNote 2: For the purposes of this AD, a detailed visual inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\nCorrective Actions \n\n\t(b) During any inspection accomplished in accordance with paragraph (a), (c), or (d) of this AD; if bushing migration, corrosion, or cracking is detected, accomplish paragraph (b)(1) or (b)(2) of this AD, as applicable. \n\n\t\t(1) If lightcorrosion or bushing migration is found: Prior to further flight, do interim rework in accordance with Part 4 of Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; or Revision 1, dated February 15, 2001; EXCEPT where the service bulletin specifies to contact Boeing, prior to further flight, repair in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or in accordance with data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative (DER) who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the approval letter must specifically reference this AD. \n\n\t\t(2) If moderate to severe corrosion or any cracking is found: Prior to further flight, rework the lugs on the bulkhead fitting of the rear engine mount in accordance with Part 5 of Boeing Service Bulletin 747-54A2200, Revision 1, dated February 15, 2001, except as provided by paragraph (g) of this AD; or in accordance with a method approved by the Manager, Seattle ACO; or in accordance with data meeting the type certification basis of the airplane approved by a Boeing Company DER who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the approval letter must specifically reference this AD. Such rework resets the compliance threshold for the inspections per paragraphs (c) and (d) of this AD to 15 years or 10,000 flight cycles since rework, whichever is earlier. \n\nNew Requirements of This AD \n\nUltrasonic Inspection--Initial and Repetitive Inspections \n\n\t(c) At the later of the times in paragraphs (c)(1) and (c)(2) of this AD, except as provided by paragraph (f) of this AD, perform an ultrasonic inspection to detect corrosion or cracking of the lugs on the bulkhead fitting of the rear engine mount, per Part 3 of Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; or Revision 1, dated February 15, 2001. Thereafter, repeat the ultrasonic inspection described in this paragraph at intervals not to exceed 1,400 flight cycles or 18 months, whichever occurs first. \n\n\t\t(1) Prior to the accumulation of 10,000 total flight cycles, or within 15 years since the date of manufacture of the airplane, whichever occurs first. \n\n\t\t(2) Within 9 months after the effective date of this AD. \n\nRepetitive Detailed Visual and Physical Measurement Inspections \n\n\t(d) After initial accomplishment of the inspections required by paragraph (c) of this AD, perform repetitive detailed visual inspections for bushing migration, corrosion, or cracking; and physical measurement inspections using feeler gages for bushing migration; of the lugs on the bulkhead fitting of the rear engine mount; per Part 2 of Boeing Alert Service Bulletin 747-54A2200, dated July 7,2000; or Revision 1, dated February 15, 2001. Perform the inspections at the interval stated in paragraph (d)(1) or (d)(2) of this AD, except as provided by paragraph (f) of this AD. Accomplishment of repetitive inspections per this paragraph constitutes terminating action for the inspections required by paragraph (a) of this AD. \n\n\t\t(1) If no bushing migration is found during any inspection per this AD, the repetitive interval is not to exceed 1,400 flight cycles or 18 months, whichever occurs first. \n\n\t\t(2) If any bushing migration is found during any inspection per this AD, the repetitive interval is not to exceed 180 days, until paragraph (e) of this AD has been done. \n\nOn-Condition Rework \n\n\t(e) If any bushing migration is found during any inspection per this AD, within 30 months after finding the migrated bushing, or within 18 months after the effective date of this AD, whichever occurs later, do rework of the lugs on the bulkhead fitting of the rear engine mount (including a detailed visual inspection of the aft upper engine mount for damage; a Non-Destructive Testing inspection and repair of the aft upper engine mount, as applicable; and rework of the lugs, and installation of new bushings in the lug, on the bulkhead fitting of the rear engine mount) per Part 5 of Boeing Alert Service Bulletin 747-54A2200, Revision 1, dated February 15, 2001. Such rework resets the compliance threshold for the inspections per paragraphs (c) and (d) of this AD to 15 years or 10,000 flight cycles since rework, whichever is earlier. \n\nOptional Rework \n\n\t(f) Rework of the lugs on the bulkhead fitting of the rear engine mount (including a detailed visual inspection of the aft upper engine mount for damage; a Non-Destructive Testing inspection and repair of the aft upper engine mount, as applicable; and rework of the lugs, and installation of new bushings in the lug, on the bulkhead fitting of the rear engine mount) per Part 5 of Boeing Alert Service Bulletin 747-54A2200, Revision 1, dated February 15, 2001, resets the compliance threshold for the inspections per paragraphs (c) and (d) of this AD to 15 years or 10,000 flight cycles since rework, whichever is earlier. \n\nException to Repair Requirement \n\n\t(g) Where Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; or Revision 1, dated February 15, 2001; says to contact Boeing for repair instructions: Before further flight, repair per a method approved by the Manager, Seattle ACO, or per data meeting the type certification basis of the airplane approved by a Boeing Company DER who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the approval letter must specifically reference this AD. \n\nAlternative Methods of Compliance \n\n\t(h)\t(1) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle ACO. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\t\t(2) Alternative methods of compliance, approved previously in accordance with AD 2000-18-01, amendment 39-11886, are approved as alternative methods of compliance for corresponding actions in this AD. \n\n\tNote 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(i) Special flight permits may be issued in accordance with Secs. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(j) Except as provided by paragraphs (b) and (g) of this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000; or Boeing Service Bulletin 747-54A2200, Revision 1, dated February 15, 2001; as applicable. \n\n\t\t(1) The incorporation by reference of Boeing Service Bulletin 747-54A2200, Revision 1, dated February 15, 2001, is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n \n\t\t(2) The incorporation by reference of Boeing Alert Service Bulletin 747-54A2200, dated July 7, 2000, was approved previously by the Director of the Federal Register as of September 18, 2000 (65 FR 53161, September 1, 2000). \n\n\t\t(3) Copies of these service bulletins may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(k) This amendment becomes effective on September 4, 2001.