2001-12-05 Boeing: Amendment 39-12260. Docket 2001-NM-118-AD. \n\n\tApplicability: Model 747-100, 747-200, 747-300, and 747SR series airplanes, certificated in any category, powered by General Electric CF6-45/50 series engines, or Pratt & Whitney JT9D-70 series engines. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct heat damage to the diagonal brace, which could cause cracking or fracture of the diagonal brace, and possible loss of the diagonal brace load path and consequent separation of the strut and engine from the airplane, accomplish the following: \n\nVerification \n\n\t(a) Within 90 days after the effective date of this AD, do the actions required by paragraph (a)(1) or (a)(2) of this AD, as applicable. \n\n\t\t(1) If an operator's maintenance records verify that, during the accomplishment of AD 95-13-07, amendment 39-9287, the seal backup plates were restored and BMS 5-63 high-temperature sealant was used in that restoration, no further action is required by this AD. \n\n\t\t(2) If an operator's maintenance records do not verify that the actions specified in paragraph (a)(1) were accomplished, do the actions required by paragraph (b) of this AD. \n\nInspections and Corrective Actions \n\n\t(b) Within 90 days after the effective date of this AD, do the inspections and applicable corrective actions specified by paragraphs (b)(1) and (b)(2) of this AD per the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2208, dated March 29, 2001. Thereafter, repeat the inspections at intervals not to exceed 6 months, except as provided by paragraph (c) of this AD. \n\nOutboard Strut Diagonal Brace \n\n\t\t(1) Do a detailed visual inspection of the forward 20 inches of the outboard strut diagonal brace, including all areas of the forward clevis lugs and brace body, for signs of heat damage or cracks, per Part 1 of the Accomplishment Instructions of the service bulletin. \n\n\t\t\t(i) If no sign of heat damage or cracking is found, repeat the detailed visual inspection at intervals not to exceed 6 months per the service bulletin, until accomplishment of paragraph (c) of this AD. \n\n\t\t\t(ii) If any primer discoloration is found, before further flight, do a non-destructive test (NDT) inspection of the area to determine if the diagonal brace has heat damage per Part 1 of the Accomplishment Instructions of the service bulletin. \n\n\t\t\t\t(A) If no heat damage is found during the NDT inspection, and no cracking is found during the detailed visual inspection, repeat the detailed visual inspection specified by paragraph (b)(1) of this AD at intervals not to exceed 6 months. \n\n\t\t\t\t(B) If any heat damage is found during the NDT inspection, or any cracking is found during the detailed visual inspection, before further flight, do the action specified in paragraph (c)(2) of this AD. Thereafter, repeat the detailed visual inspection specified by paragraph (b)(1) of this AD at intervals not to exceed 6 months. \n\nFirewall Openings of the Strut Aft Bulkhead \n\n\t\t(2) Do a detailed visual inspection of the firewall openings of the strut aft bulkhead to verify installation of seal backup plates and condition of the sealant application per Part 1 of the Accomplishment Instructions of the service bulletin. \n\n\t\t\t(i) If no discrepancy (including damaged or missing seal backup plates, or damaged or missing sealant) is found, repeat the detailed visual inspection specified by paragraph (b)(1) of this AD at intervals not to exceed 6 months. \n\n\t\t\t(ii) If the seal backup plates are not installed, before further flight, install the seal backup plates and apply heat-resistant sealant, BMS 5-63, per Part 2 of the Accomplishment Instructions of the service bulletin. Accomplishment of this action terminates the repetitive inspections required by this AD. \n\n\t\t\t(iii) If the seal backup plates are installed, but the sealant application is damaged or missing, before further flight, remove any existing sealant and apply heat-resistant sealant, BMS 5-63, per Part 3 of the Accomplishment Instructions of the service bulletin. Accomplishment of this action terminates the repetitive inspections required by this AD. \n\n\tNote 2: Because it is difficult to distinguish between BMS 5-95 and BMS 5-63 sealants, removal and replacement of the existing sealant is required to ensure that the correct heat-resistant sealant, BMS 5-63, is used. \n\nOptional Terminating Action \n\n\t(c) Accomplishment of the inspections required by paragraphs (b)(1) and (b)(2) of this AD and the actions specified by paragraphs (c)(1), (c)(2), and (c)(3) of this AD, as applicable, constitutes terminating action for the requirements of this AD. \n\n\t\t(1) Before further flight following the inspections required by paragraphs (b)(1) and (b)(2) of this AD, if no cracking or heat damage is found and the seal backup plates are installed, remove any existing sealant and apply heat-resistant sealant, BMS 5-63, per Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2208, dated March 29, 2001. \n\n\t\t(2) If any sign of heat damage or cracking is found during the inspections required by paragraph (b) of this AD, before further flight, do the actions specified by either paragraph (c)(2)(i) or (c)(2)(ii) of this AD. \n\n\t\t\t(i) Replace the diagonal brace per Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2208, dated March 29, 2001; or \n\n\t\t\t(ii) Repair per a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or per data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the Manager's approval letter must specifically reference this AD. \n\n\t\t(3) If the seal back-up plates are missing, before further flight, do the actions required by paragraph (b)(2)(ii) of this AD. \n\nAlternative Methods of Compliance \n\n\t(d) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle ACO. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(e) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(f) Except as provided by paragraph (c)(2)(ii) of this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin 747-54A2208, dated March 29, 2001. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtainedfrom Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(g) This amendment becomes effective on June 27, 2001.