2000-08-21 BOEING: Amendment 39-11707. Docket 99-NM-231-AD. \n\n\tApplicability: All Model 747 series airplanes, certificated in any category. \n\n\tNOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (e) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct cracking of the forward and aft inner chords and the splice fitting of the forward inner chord of the station 2598 bulkhead, which could result in reduced structural capability of the bulkhead and the inability of the structure to carry horizontal stabilizer flight loads, accomplish the following: \n\nInitial Inspection \n\t(a)\tPrior to the accumulation of 13,000 total flight cycles, or within 1,000 flight cycles after the effective date of this AD, whichever occurs later: Accomplish the requirements specified in paragraphs (a)(1) and (a)(2) of this AD. \n\n\t\t(1)\tPerform a high frequency eddy current inspection (HFEC) to detect cracking of the forward and aft inner chords of the station 2598 bulkhead, in accordance with Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998; or in accordance with Figure 2, Steps 1 and 2, of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999. \n\n\t\t(2)\tPerform an HFEC inspection to detect cracking of the splice fitting along the upper and lower attachment to the forward inner chord of the station 2598 bulkhead, as shown in Figure 2, Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998; or in accordance with Figure 2, Step 3, of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999. \n\n\tNOTE 2: Operators should note that although the splice fitting is NOT highlighted in Figure 2, Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998, as it is in Figure 2 of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999, the inspection required by paragraph (a)(2) of this AD must still be accomplished. \n\nRepetitive Inspections \n\t(b)\tWithin 3,000 flight cycles after accomplishment of the inspections required by paragraph (a) of this AD: Accomplish the inspections specified in paragraphs (b)(1) and (b)(2) of this AD. Repeat the inspection thereafter at intervals not to exceed 3,000 flight cycles. \n\n\t\t(1)\tPerform adetailed visual inspection to detect cracking of the forward and aft inner chords of the station 2598 bulkhead, in accordance with Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998; or in accordance with Figure 3, Steps 1 and 2, of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999. \n\n\tNOTE 3: For the purposes of this AD, a detailed visual inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\n\t\t(2)\tPerform a detailed visual inspection to detect cracking of the splice fitting along the upper and lower attachment to the forward inner chord of the station 2598 bulkhead, as shown in Figure 3, Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998; or in accordance with Figure 3, Step 3, of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999. \n\n\tNOTE 4: Operators should note that although the splice fitting is NOT highlighted in Figure 3, Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998, as it is in Figure 3 of Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999, the inspections required by paragraph (b)(2) of this AD must still be accomplished. \n\nRepair \n\t(c)\tIf any cracking is detected during the inspections required by paragraph (a)(1) or (b)(1) of this AD, prior to further flight, repair in accordance with Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998, or Revision 1, dated October 28, 1999; except as provided by paragraph (d) of this AD. \n\n\t(d)\tIf any cracking is detected during the inspections requiredby paragraph (a)(2) or (b)(2) of this AD, or where the alert service bulletin specifies that the manufacturer may be contacted for disposition of certain repair conditions, prior to further flight, repair in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate; or in accordance with data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative (DER) who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, or a Boeing DER, as required by this paragraph, the approval letter must specifically reference this AD. \n\nAlternative Methods of Compliance \n\t(e)\tAn alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle ACO. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNOTE 5: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\t(f)\tSpecial flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\t(g)\tExcept as provided by paragraph (d) of this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin 747-53A2427, dated December 17, 1998, or Boeing Alert Service Bulletin 747-53A2427, Revision 1, dated October 28, 1999. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained fromBoeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\n\t(h)\tThis amendment becomes effective on June 5, 2000.