98-04-14 Pratt & Whitney: Amendment 39-10326. Docket 97-ANE-44-AD.
Applicability: Pratt & Whitney PW4164 and PW4168 series turbofan engines, with front pylon mount bolts, Part Number (P/N) 54T670, installed. These engines are installed on but not limited to Airbus Industrie A330 series aircraft.
Note 1: This airworthiness directive (AD) applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, therequest should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent front pylon mount bolt failure, which could result in engine separation from the aircraft, accomplish the following:
(a) Perform initial and repetitive torque checks of front pylon mount bolts, and replace, if necessary, with new bolts, in accordance with the Accomplishment Instructions of Pratt & Whitney Service Bulletin (SB) No. PW4G-100-A71-9, Revision 1, dated November 24, 1997, as follows:
(1) For front pylon mount bolts with more than 1,000 cycles since new (CSN) but less than 5,750 CSN on the effective date of this AD, accomplish the following in accordance with Part (A) of the Accomplishment Instructions of the SB:
(i) Perform an initial torque check within 250 cycles in service (CIS) after the effective date of this AD, or prior to the next engine removal for any cause, whichever occurs first.
(ii) Thereafter, perform torque checks at intervals not less than 750 or greater than 1,250 CIS since last torque check, not to exceed 11,000 CSN.
(2) For front pylon mount bolts with 5,750 or more CSN but less than 8,000 CSN on the effective date of this AD, accomplish the following in accordance with Part (B) of the Accomplishment Instructions of the SB:
(i) Perform an initial torque check within 250 CIS after the effective date of this AD, or prior to the next engine removal for any cause, whichever occurs first.
(ii) Thereafter, perform torque checks at intervals not less than 750 or greater than 1,250 CIS since last torque check, not to exceed 11,000 CSN.
(3) For front pylon mount bolts with 8,000 or more CSN but less than 11,000 CSN on the effective date of this AD, perform an inspection in accordance with the schedule and procedures of the Appendix to the SB.
(4) Prior to further flight, replace all four bolts in accordance with Part (A), Paragraph 1(D) of the Accomplishment Instructions of the SB, if any are found loose or broken.
(b) This AD establishes a new life limit of 11,000 CSN for front pylon mount bolts, P/N 54T670. Except as provided in paragraph (c) of this AD, no front pylon mount bolts may exceed this new life limit after the effective date of this AD.
(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office. Operators shall submit their request through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Engine Certification Office.
Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the Engine Certification Office.
(d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the aircraft to a location where the inspection requirements of this AD can be accomplished.
(e) The actions required by this AD shall be done in accordance with the following PW SB:
Document No.
Revision
Pages
Date
PW4G-100-A71-9
1
1
November 24, 1997
2
Original
July 31, 1997
3
1
November 24, 1997
4-7
Original
July 31, 1997
8,9
1
November 24, 1997
10,11
Original
July 31, 1997
Total pages: 11.
This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Pratt & Whitney, 400 Main St., East Hartford, CT 06108; telephone (860) 565-6600, fax (860) 565-4503. Copies may be inspected at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(f) This amendment becomes effective on March 13, 1998.