97-11-05 AlliedSignal Inc.: Amendment 39-10034. Docket 96-ANE-26.
Applicability: AlliedSignal Inc. (formerly Textron Lycoming) ALF502 and LF507 series turbofan engines with fuel manifold assemblies having Part Numbers (P/Ns) listed in paragraph 1(A) of AlliedSignal Service Bulletin (SB) No. ALF/LF 73-1002, dated December 22, 1995, installed on but not limited, British Aerospace Models BAe 146-100A, -200A, and -300A series; Avro International Models 146-RJ70A, -RJ85A, and -RJ100A series; and Canadair Model CL-600-1A11 series aircraft.
Note 1: This airworthiness directive (AD) applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent cracking of the fuel manifold assembly, which could result in an engine fire, accomplish the following:
(a) Perform initial and repetitive on-wing eddy current inspection (ECI) or in-shop fluorescent penetrant inspection (FPI) of fuel manifold assemblies having P/Ns listed in the paragraph 1.A of AlliedSignal Aerospace SB No. ALF/LF 73-1002, dated December 22, 1995, for cracks, and replace, if necessary, with serviceable parts, in accordance with accomplishment instructions of this SB as follows:
(1) For ALF502L series engines:
(i) For fuel manifold assemblies with 3,250 or more cycles sincenew (CSN), or unknown CSN, on the effective date of this AD, inspect at the next hot section inspection (HSI), or 2,000 cycles in service (CIS) after the effective date of this AD, whichever occurs first.
(ii) For fuel manifold assemblies with less than 3,250 CSN on the effective date of this AD, inspect at the next HSI, or prior to accumulating 5,250 CSN, whichever occurs first.
(iii) Thereafter, inspect at HSI intervals not to exceed 2,000 CIS since last inspection.
(iv) If a fuel manifold assembly is found cracked, prior to further flight, replace with a serviceable assembly.
(2) For ALF502R and LF507 series engines:
(i) For fuel manifold assemblies with 3,250 or more CSN, or unknown CSN, on the effective date of this AD, inspect within 1,250 CIS after the effective date of this AD.
(ii) For fuel manifold assemblies with less than 3,250 CSN on the effective date of this AD, inspect prior to accumulating 4,500 CSN.
(iii) Thereafter, inspect at intervals not to exceed 1,250 CIS since last inspection.
(iv) If a fuel manifold assembly is found cracked, prior to further flight, replace with a serviceable assembly.
(b) Installation of a new, improved design fuel manifold assembly, P/N 2-163-620-37 or -38, constitutes terminating action to the inspection requirements of paragraph (a) of this AD.
(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Los Angeles Aircraft Certification Office. Operators shall forward their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Los Angeles Aircraft Certification Office.
Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the Los Angeles Aircraft Certification Office.
(d) Special flight permits maybe issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the aircraft to a location where the requirements of this AD can be accomplished.
(e) The actions required by this AD shall be done in accordance with the following AlliedSignal Aerospace SB:
Document No
Pages
Revision
Date
ALF/LF 73-1002
1-8
Original
December 22, 1995
Total Pages: 8.
This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from AlliedSignal Aerospace, Attn: Data Distribution, M/S 64-3/2101-201, P.O. Box 29003, Phoenix, AZ 85038-9003; telephone (602) 365-2493, fax (602) 365-5577. Copies may be inspected at the FAA, New England Region, Office of the Assistant Chief Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the Federal Register, 800 North Capitol Street NW., suite 700, Washington, DC.
(f) This amendment becomes effective on July 28, 1997.