97-03-07 RAYTHEON AIRCRAFT COMPANY (Formerly Beech, Raytheon Corporate Jets, British Aerospace, Hawker Siddley, et al.): Amendment 39-9913. Docket 95-NM-258-AD. Supersedes AD 94-26-12, Amendment 39-9107.
Applicability: Model Hawker 800 and 1000 and Model DH/BH/HS/BAe 125 series airplanes (including major variants C29A, U125, and U125A series airplanes); equipped with main landing gear (MLG) sidestay assemblies on which Post-Mod 252091 steel jack pivots have been installed; certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
NOTE 2: Raytheon Model BAe 125 series 800B and BAe 125-1000B airplanes are similar in design to the airplanes that are subject to the requirements of this AD and, therefore, also may be subject to the unsafe condition addressed by this AD. However, as of the effective date of this AD, those models are not type certificated for operation in the United States. Airworthiness authorities of countries in which the Model BAe 125 series 800B and BAe 125-1000B airplanes are approved for operation should consider adopting corrective action, applicable to those models, that is similar to the corrective action required by this AD.
Compliance: Required as indicated, unless accomplished previously.
To prevent the inability ofthe MLG to deploy and a consequent wheels-up landing, accomplish the following:
NOTE 3: Paragraph (a) of this AD restates the requirements of AD 94-26-12. As allowed by the phrase, "unless accomplished previously," if the initial inspection required by that AD has been accomplished previously, paragraph (a) of this AD does not require that initial inspection to be repeated.
(a) For Raytheon Model Hawker 800 and 1000 and Model DH/BH/HS/BAe 125-1A through -1000A series airplanes equipped with MLG sidestay assemblies on which Post-Mod 252091 steel jack pivots have been installed, except for airplanes as specified in paragraph (d) of this AD: Perform a detailed visual inspection, using a 10X magnifier, to detect cracking of the sidestay assembly jack pivot of the left and right MLG, in accordance with Raytheon Corporate Jets Service Bulletin SB 32-233, dated June 24, 1994; Revision 1, dated July 8, 1994; or Revision 2, dated July 28, 1995; at the latest of the times specifiedin paragraph (a)(1), (a)(2), or (a)(3) of this AD.
(1) Within 28 days after February 3, 1995 (the effective date of AD 94-26-12, Amendment 39-9107); or
(2) Prior to the accumulation of 3,000 total landings on the sidestay assembly since new; or
(3) Prior to the accumulation of 1,000 total landings since overhaul of the sidestay assembly.
(b) For Raytheon Model Hawker 800 and 1000 and Model DH/BH/HS/BAe 125-1A through -1000A series airplanes equipped with MLG sidestay assemblies on which Post-Mod 252091 steel jack pivots (part numbers 25UM1199A, 25UM1229A, and 258UM87-1A) have been installed prior to June 24, 1994, except for airplanes as specified in paragraph (d) of this AD:
(1) If no cracks are found during the inspection required by paragraph (a) of this AD, and the sidestay assembly has been overhauled prior to the accomplishment of the inspection, accomplish the requirements of paragraphs (b)(1) and (b)(2) of this AD at the times specified.
(i)Repeat the inspection specified in paragraph (a) of this AD within 1,000 landings after accomplishing the initial inspection, and thereafter at intervals not to exceed 1,000 landings, in accordance with Raytheon Corporate Jets Service Bulletin SB 32-233, dated June 24, 1994; Revision 1, dated July 8, 1994; or Revision 2, dated July 28, 1995.
(ii) Prior to the accumulation of 4,000 total landings on the jack pivot assembly since the sidestay assembly was new or last overhauled, or within 300 landings after the effective date of this AD, whichever occurs later: Replace the jack pivot assembly with a new, improved assembly, in accordance with Raytheon Corporate Jets Service Bulletin SB.32-233-3597A, dated July 28, 1995. Accomplishment of this replacement constitutes terminating action for the inspection requirements of this AD.
(2) If no cracks are found during the inspection required by paragraph (a) of this AD, and the sidestay assembly has not been overhauled prior to accomplishment of that inspection: Prior to the accumulation of 4,000 total landings on the jack pivot assembly, or within 300 landings after the effective date of this AD, whichever occurs later, replace the jack pivot assembly with a new, improved assembly, in accordance with Raytheon Corporate Jets Service Bulletin SB 32-233, Revision 2, dated July 28, 1995. Accomplishment of this replacement constitutes terminating action for the inspection requirements of this AD.
(c) For Raytheon Model Hawker 800 and 1000 and Model DH/BH/HS/BAe 125-1A through -1000A series airplanes equipped with MLG sidestay assemblies on which Post-Mod 252091 steel jack pivots (part numbers 25UM1199A, 25UM1229A, and 258UM87-1A) have been installed on June 24, 1994, or later, except for airplanes as specified in paragraph (d) of this AD: Replace the jack pivot assembly with a new, improved assembly in accordance with Raytheon Corporate Jets Service Bulletin SB.32-233-3597A, dated July 28, 1995, at the laterof the times specified in paragraph (c)(1) or (c)(2) of this AD. Accomplishment of this replacement constitutes terminating action for the inspection requirements of this AD.
(1) Prior to the accumulation of 2,000 total landings since installation of Post Mod 252091 steel jack pivots. Or
(2) Within 1,000 landings after the effective date of this AD.
(d) For all Raytheon Model BAe 125 Series 800A C29A, U125, and Hawker 800 U125A airplanes on which Post Mod 252091 steel jack pivots (part numbers 25UM1199A, 25UM1229A, and 258UM87-1A) have been installed: Accomplish paragraphs (d)(1) and (d)(2) of this AD at the times specified in those paragraphs.
(1) Perform a detailed visual inspection, using a 10X magnifier, to detect cracking of the sidestay assembly jack pivot of the left- and right-hand MLG, in accordance with Raytheon Corporate Jets Service Bulletin SB 32-233, Revision 2, dated July 28, 1995, at the later of the times specified in paragraph (d)(1)(i) or (d)(1)(ii) of this AD. Thereafter, repeat this inspection at intervals not to exceed 200 landings, until the requirements of paragraph (d)(2) of this AD are accomplished.
(i) Prior to the accumulation of 1,200 total landings since the installation of a steel jack pivot (Post Mod 252091). Or
(ii) Within 56 days or within 200 landings after the effective date of this AD, whichever occurs first.
(2) Prior to the accumulation of 2,000 total landings on the jack pivot, or within 300 landings after the effective date of this AD, whichever occurs later: Replace the sidestay jack pivot assembly with a new, improved assembly (part numbers 25UM1335-1A and 25-8UM173-1A) in accordance with Raytheon Corporate Jets Service Bulletin SB.32-233-3597A, dated July 28, 1995. Accomplishment of this replacement constitutes terminating action for the inspection requirements of this AD.
(e) If any crack is detected during any inspection required by this AD, replace the sidestay jackpivot assembly with a new, improved assembly (part numbers 25UM1335-1A and 25- 8UM173-1A) in accordance with Raytheon Corporate Jets Service Bulletin SB.32-233-3597A, dated July 28, 1995, at the time specified in paragraph (e)(1) or (e)(2) of this AD, as applicable. Accomplishment of this replacement constitutes terminating action for the inspection requirements of this AD.
(1) For airplanes on which a crack is detected that does not exceed the limits specified in the service bulletin, replace the assembly at the later of the times specified in paragraph (e)(1)(i) or (e)(1)(ii) of this AD.
(i) Within 100 landings after the effective date of this AD. Or
(ii) Within 100 landings after the initial detection of the cracking.
(2) For airplanes on which a crack is detected that exceeds the limits specified in the service bulletin, prior to further flight, replace the assembly in accordance with the service bulletin.
(f) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.
NOTE 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.
(g) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
(h) The actions shall be done in accordance with the following Raytheon Corporate Jets service bulletins, which contain the specified list of effective pages:
Service Bulletin
Referenced andDate
Page Number
Revision Level
Shown on Page
Date
Shown on Page
SB 32-233
June 24, 1994
1-10
Original
June 24, 1994
SB 32-233
Revision 1
July 8, 1994
1, 2, 5
3, 4, 6-10
1
Original
July 8, 1994
June 24, 1994
SB 32-233
Revision 2
July 28, 1995
1-4, 6, 7, 9
5
8, 10
2
1
Original
July 28, 1995
July 8, 1994
June 24, 1994
SB.32-233-3597A
July 28, 1995
1-8
Original
July 28, 1995
The incorporation by reference of Raytheon Corporate Jets Service Bulletin SB 32-233, dated June 24, 1994, was approved previously by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as of February 3, 1995 (60 FR 330, January 4, 1995). The incorporation by reference of the remainder of the service documents listed above is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Raytheon Aircraft Company, Manager Service Engineering, Hawker Customer Support Department, P.O. Box 85, Wichita, Kansas 67201-0085. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(i) This amendment becomes effective on March 11, 1997.