96-19-03 MCDONNELL DOUGLAS: Amendment 39-9751. Docket 95-NM-212-AD. \n\n\tApplicability: All Model DC-10 and MD-11 series airplanes, and KC-10A (military) airplanes, certificated in any category. \n\n\tNOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplishedpreviously. \n\n\tTo prevent stress corrosion cracking in the fasteners in the inboard flap inboard track, which could result in binding of the flap and inability of the flap to extend or retract, accomplish the following: \n\n\t(a)\tFor Model DC-10 series airplanes and KC-10A (military) airplanes: Within 18 months after the effective date of this AD, perform a visual inspection to detect corrosion or failure of the steel Hi-Lok fasteners at the inboard flap inboard track in accordance with McDonnell Douglas Service Bulletin DC-10-57-134, dated August 15, 1995. \n\n\t\t(1)\tIf no corrosion or failure is detected, accomplish either paragraph (a)(1)(i) or (a)(1)(ii) of this AD. \n\n\t\t\t(i)\tRepeat the inspection required by paragraph (a) of this AD thereafter at intervals not to exceed 18 months until paragraph (a)(1)(ii) of this AD is accomplished. \n\n\t\t\t(ii)\tReplace all steel Hi-Lok fasteners with inconel Hi-Lok fasteners in accordance with McDonnell Douglas Service Bulletin DC-10-57-134, dated August 15, 1995. Accomplishment of this replacement constitutes terminating action for the repetitive inspection requirements of paragraph (a)(1)(i) of this AD. \n\n\t\t(2)\tIf any corrosion or failure is detected, prior to further flight, accomplish either paragraph (a)(2)(i) or (a)(2)(ii) of this AD, in accordance with McDonnell Douglas Service Bulletin DC-10-57-134, dated August 15, 1995. \n\n\t\t\t(i)\tReplace all corroded/failed steel Hi-Lok fasteners with either like steel Hi-Lok fasteners or inconel Hi-Lok fasteners, in accordance with the service bulletin. Thereafter, repeat the visual inspection required by paragraph (a) of this AD at intervals not to exceed 18 months until paragraph (a)(2)(ii) of this AD is accomplished. \n\n\t\t\t(ii)\tReplace all steel Hi-Lok fasteners with inconel Hi-Lok fasteners, in accordance with McDonnell Douglas Service Bulletin DC-10-57-134, dated August 15, 1995. Accomplishment of this replacement constitutes terminating action for the repetitive inspection requirements of paragraph (a)(2)(i) of this AD. \n\n\t(b)\tFor Model MD-11 series airplanes: Within 18 months after the effective date of this AD, perform a visual inspection to detect corrosion or failures of the steel Hi-Lok fasteners at the inboard flap inboard track in accordance with McDonnell Douglas Service Bulletin MD11-57-031, dated August 15, 1995. \n\n\t\t(1)\tIf no corrosion or failures are detected, accomplish either paragraph (b)(1)(i) or (b)(2)(ii) of this AD. \n\n\t\t\t(i)\tRepeat the inspection required by paragraph (b) of this AD thereafter at intervals not to exceed 18 months until paragraph (b)(1)(ii) of this AD is accomplished. \n\n\t\t\t(ii)\tReplace all steel Hi-Lok fasteners with inconel Hi-Lok fasteners in accordance with McDonnell Douglas Service Bulletin MD11-57-031, dated August 15, 1995. Accomplishment of this replacement constitutes terminating action for the repetitive inspection requirements of paragraph (b)(1)(i) of this AD. \n\n\t\t(2)\tIf any corrosion or failure is detected during the inspection required by paragraph (b) of this AD, prior to further flight, accomplish either paragraph (b)(2)(i) or (b)(2)(ii) of this AD, in accordance with McDonnell Douglas Service Bulletin MD11-57-031, dated August 15, 1995. \n\n\t\t\t(i)\tReplace all corroded/failed steel Hi-Lok fasteners with either like steel Hi-Lok fasteners or inconel Hi-Lok fasteners, in accordance with the service bulletin. Thereafter, repeat the visual inspection required by paragraph (b) of this AD at intervals not to exceed 18 months until paragraph (b)(2)(ii) of this AD is accomplished. \n\n\t\t\t(ii)\tReplace all steel Hi-Lok fasteners with inconel Hi-Lok fasteners in accordance with McDonnell Douglas Service Bulletin MD11-57-031, dated August 15, 1995. Accomplishment of this replacement constitutes terminating action for the repetitive inspection requirements of paragraph (b)(2)(i) of this AD. \n\n\t(c)\tAn alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Los Angeles ACO. \n\n\tNOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Los Angeles ACO. \n\n\t(d)\tSpecial flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\n\t(e)\tThe inspections and replacement shall be done in accordance with McDonnell Douglas Service Bulletin DC-10-57-134, dated August 15, 1995 (for Model DC-10 series airplanes); and McDonnell Douglas Service Bulletin MD11-57-031, dated August 15, 1995 (for Model MD-11 series airplanes). This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from McDonnell Douglas Corporation, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Technical Publications Business Administration, Department C1-L51 (2-60). Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Los Angeles Aircraft Certification Office, Transport Airplane Directorate, 3960 Paramount Boulevard, Lakewood, California; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\n\t(f)\tThis amendment becomes effective on October 16, 1996.