96-13-11 AIRBUS INDUSTRIE: Amendment 39-9679. Docket 94-NM-102-AD. Supersedes AD 93-01-24, Amendment 39-8478.
Applicability: All Model A300 B2-1A, B2-1C, B2K-3C, and B2-203 series airplanes, and Model A300 B4-2C, B4-103, and B4-203 series airplanes; certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been otherwise modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (m) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent reduced structural integrity of these airplanes due to fatigue cracking, accomplish the following:
(a) Within one year after March 9, 1993 (the effective date of AD 93-01-24, amendment 39-8478), incorporate a revision into the FAA-approved maintenance inspection program that provides for supplemental maintenance inspections, modifications, repair, or replacement of the significant structural details (SSD) and significant structural items (SSI) specified in "Airbus Industrie A300 Supplemental Structural Inspection Document" (SSID), dated September 1989 (hereafter referred to as "the SSID").
(b) Within one year after the effective date of this AD, replace the revision of the FAA-approved maintenance program required by paragraph (a) of this AD with the inspections, inspection intervals, repairs, and replacements defined in "Airbus Industrie A300 Supplemental Structural Inspection Document" (SSID), Revision 2, dated June 1994 (hereafter referred to as "Revision 2 of the SSID"). Accomplish the actions specified in the service bulletins identified in Section 6, "SB Reference List," Revision 2 of the SSID, at the times specified in those service bulletins. The actions are to be accomplished in accordance with those service bulletins.
(1) For airplanes that have exceeded the threshold specified in any of the service bulletins identified in Section 6, "SB Reference List," Revision 2 of the SSID: Accomplish the actions specified in those service bulletins within the grace period specified in that service bulletin. The grace period is to be measured from the effective date of this AD.
(2) For airplanes that have exceeded the threshold specified in any of the service bulletins identified in Section 6, "SB Reference List," Revision 2 of the SSID, and a grace period is not specified in that service bulletin: Accomplish the actions specified in that service bulletins within 1,500 flight cycles after the effective date of this AD.
(c) If any cracked structure is detected during the inspections required by either paragraph (a) or (b) of this AD, prior to further flight, permanently repair the cracked structure in accordance with either paragraph (c)(1), (c)(2), or (c)(3) of this AD.
NOTE 2: A permanent repair is defined as a repair that meets the certification basis of the airplane, and does not require additional modification at a later date.
(1) The service bulletins listed in Section 6, "SB Reference List," of the SSID [for airplanes that are currently being inspected in accordance with paragraph (a) of this AD]; or in accordance with a method approved by the Manager, Standardization Branch, ANM- 113, FAA, Transport Airplane Directorate, if a permanent repair is not specified in any of these service bulletins. Or
(2) The service bulletins listed in Section 6, "SB Reference List," of Revision 2 of the SSID [for airplanes that are currently being inspected in accordance with paragraph (b) of this AD]; or in accordance with a method approved by the Manager, Standardization Branch, ANM-113, if a permanent repair is not specified in any of these service bulletins. Or
(3) Other permanent repair data meeting the certification basis of the airplane which is approved by the Manager, Standardization Branch, ANM-113, or by the Direction G n rale de l'Aviation Civile (DGAC) of France.
(d) For airplanes identified as Fleet Leader Program (FLP) in Section 5, "Fleet Leader Program," of the SSID or Revision 2 of the SSID: Inspect according to the instructions and intervals specified in paragraph 4.4, "Adjustment of Inspection Requirements and DSG," of Section 4, or Section 9, as applicable, of the SSID [for airplanes inspected in accordance with paragraph (a) of this AD], or Revision 2 of the SSID [for airplanes inspected in accordance with paragraph (b) of this AD], for each SSD.(e) For the purpose of accomplishing paragraphs (d), (f), (g), and (i) of this AD, operators shall not use paragraph 6.2, "Complete RR Method," of Section 9 of the SSID to calculate inspection thresholds and intervals.
(f) For Model A300-B2 and B2K-3C series airplanes: For any SSD that has exceeded the values of the threshold specified in paragraph 6, "Inspection Threshold and Intervals," Section 9 of the SSID, inspect at the time specified in either paragraph (f)(1) or (f)(2) of this AD, as applicable.
(1) For airplanes inspected in accordance with paragraph (a) of this AD: Inspect within 2,000 landings after March 9, 1993, in accordance with the SSID. Or
(2) For airplanes inspected in accordance with paragraph (b) of this AD: Inspect within 2,000 landings after the effective date of this AD, in accordance with Revision 2 of the SSID.
(g) For Model A300-B4 series airplanes: For any SSD that has exceeded the values of the threshold specified in paragraph 6, "Inspection Threshold and Intervals," Section 9 of the SSID, inspect at the time specified in either paragraph (g)(1) or (g)(2) of this AD, as applicable.
(1) For airplanes inspected in accordance with paragraph (a) of this AD: Inspect within 1,500 landings after March 9, 1993 [the effective date of AD 93-01-24, amendment 39-8478]. Or
(2) For airplanes inspected in accordance with paragraph (b) of this AD: Inspect within 1,500 landings after the effective date of this AD.
(h) For airplanes identified as FLP in Section 5, "Fleet Leader Program," of the SSID or Revision 2 of the SSID: Within one year after the effective date of this AD, apply the basic requirements given in Revision 2 of the SSID.
(i) For airplanes that are subject to the requirements of paragraph (b) of this AD, and have exceeded the initial inspection threshold specified in paragraph 4.4, "Adjustment of Inspection Requirements and DSG," of Section 4, or paragraph 6, "Inspection Threshold and Intervals," of Section 9, for each SSD: Perform the initial inspection prior to the accumulation of the number of flight cycles specified in paragraph 7, "Additional Information," Section 9, of Revision 2 of the SSID.
NOTE 3: Fatigue ratings are not applicable to these allowances; therefore, no adjustment is required.
NOTE 4: Paragraph (i) of this AD provides the "grace" periods for those airplanes that are new to the FLP or that have newly added or revised SSID requirements in accordance with paragraph (b) of this AD.
(j) The grace period provided by paragraph (i) of this AD is also applicable to the thresholds and/or repeat intervals for each SSD for which the inspection interval or threshold was reduced in accordance with the requirements of paragraph (b) of this AD.
(k) For FLP airplanes identified in Section 5, "Fleet Leader Program," of the SSID or Revision 2 of the SSID that are listed in Section 7, "SSI Limitation List," of the SSID [for airplanes that are currently being inspected in accordance with paragraph (a) of this AD], or Revision 2 of the SSID [for airplanes that are currently being inspected in accordance with paragraph (b) of this AD]: Inspect at intervals not to exceed the interval specified for each SSI, in accordance with the values given in Section 7, "SSI Limitation List," of the SSID or Revision 2 of the SSID, as applicable.
(l) For all airplanes: All inspection results, positive or negative, must be reported to Airbus Industrie in accordance with either paragraph (l)(1) or (l)(2) of this AD, as applicable. Information collection requirements contained in this regulation have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056.
(1) For FLP airplanes, identified in Section 5, "Fleet Leader Program," of the SSID or Revision 2 of the SSID: Submit reports in accordance with the instructionsin paragraph 5.2, "SSIP Inspection Reporting," of Section 5, and paragraph 7.1, "General," of Section 7 of the SSID [for airplanes that are currently being inspected in accordance with paragraph (a) of this AD]; or Revision 2 of the SSID [for airplanes inspected in accordance with paragraph (b) of this AD].
(2) For all airplanes that are subject to Section 6, "SB Reference List," of the SSID: Submit reports in accordance with the instructions in the applicable service bulletins identified in Section 6 of the SSID [for airplanes that are currently being inspected in accordance with paragraph (a) of this AD]; or Revision 2 of the SSID [for airplanes that are currently being inspected in accordance with paragraph (b) of this AD].
(m) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submittheir requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.
NOTE 5: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.
NOTE 6: Alternative methods of compliance previously granted for AD 93-01-24, amendment 39-8478, continue to be considered as acceptable alternative methods of compliance with this amendment.
(n) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
(o) The actions shall be done in accordance with Airbus Industrie Supplemental Structural Inspection Document (SSID), dated September 1989; or Airbus Industrie A300 SSID, Revision 2, dated June 1994, as applicable. Airbus Industrie SSID, Revision 2, dated June 1994, contains the following list of effective pages:
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Record of Revision
2
JUN94
Section 0
O-LEP 1
2
JUN94
O-TOC 1
2
JUN94
Section 1
1-LEP 1
2
JUN94
1-TOC 1
1
MAR93
1
1
MAR93
2, 3
2
JUN94
Section 2
2-LEP 1
2
JUN94
2-TOC 1
1
MAR93
1, 2
1
MAR93
3
2
JUN94
Section 3
3-LEP 1
2
JUN94
3-TOC 1
2
JUN94
1, 2
2
JUN94
Section 4
4-LEP 1
1
MAR93
4-TOC 1
1
MAR93
1-3, 7-9, 11-16, 19,
1
MAR93
24-38, 40-46
4-6, 10, 17, 18, 20-23
0
SEP89
39
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 5
5-LEP 1
2
JUN94
5-TOC 1
2
JUN94
1-48
2
JUN94
Section 6
6-LEP 1
2
JUN94
6-TOC 1
1
MAR93
1
1
MAR93
2-4
2
JUN94
Section 7
7-LEP 1
1
MAR93
7-TOC 1
1
MAR93
1-10
1
MAR93
Section 8
8-LEP 1
1
MAR93
8-TOC 1
1
MAR93
1-5
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
9-LEP 1-6
2
JUN94
9-LEP 7-9
2
JUN94
9-TOC 1
1
MAR93
1-3
1
MAR93
4
2
JUN94
526305/1-4
0
SEP89
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
526305/5
1
MAR93
526305/6
2
JUN94
536101/1
0
SEP89
536101/2
1
MAR93
536101/3
2
JUN94
536101/4
0
SEP89
536110/1, 2
0
SEP89
536110/3
1
MAR93
536110/4
2
JUN94
536110/5
0
SEP89
536202/1
0
SEP89
536202/2, 3
1
MAR93
536202/4
2
JUN94
536202/5-7
0
SEP89
536204/1, 2
0
SEP89
536204/3, 4
1
MAR93
536204/5
2
JUN94
536204/6, 7
0
SEP89
536205/1, 2
0
SEP89
536205/3
2
JUN94
536205/4
1
MAR93
536205/5
2
JUN94
536205/6, 7
0
SEP89
536206/1
0
SEP89
536206/2, 3
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
536206/4
2
JUN94
536206/5, 6
0
SEP89
536207/1
0
SEP89
536207/2
1
MAR93
536207/3
2
JUN94
536207/4-7
0
SEP89
536225/1
0
SEP89
536225/2
1
MAR93
536225/3
2
JUN94
536225/4-6
0
SEP89
536301/1-3
0
SEP89
536301/4
1
MAR93
536301/5
0
SEP89
536301/6
1
MAR93
536301/7-9
2
JUN94
536301/10
2
JUN94
536311/1-3
0
SEP89
536311/4
1
MAR93
536311/5, 6
2
JUN94
536311/7
2
JUN94
536355/1-4
0
SEP89
536355/5
1
MAR93
536355/6
2
JUN94
536359/1
0
SEP89
536359/2
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
536359/3
2
JUN94
536365/1
0
SEP89
536365/2
1
MAR93
536365/3
2
JUN94
536365/4
1
MAR93
536367/1
0
SEP89
536367/2
1
MAR93
536367/3
2
JUN94
536403/1
0
SEP89
536403/2
1
MAR93
536403/3
2
JUN94
536403/4
0
SEP89
536405/1-3
0
SEP89
536405/4-5
1
MAR93
536405/6
2
JUN94
536405/7
0
SEP89
536407/1-3
0
SEP89
536407/4, 5
1
MAR93
536407/6
2
JUN94
536407/7
0
SEP89
536415/1, 2
1
MAR93
536415/3
2
JUN94
536415/4
0
SEP89
536502/1-4
0
SEP89
536502/5, 6
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
536502/7-9
2
JUN94
536502/10
2
JUN94
536503/1, 2
0
SEP89
536503/3, 4
1
MAR93
536503/5
2
JUN94
536503/6-10
0
SEP89
536506/1, 2
0
SEP89
536506/3, 4
1
MAR93
536506/5
2
JUN94
536506/6-11
0
SEP89
536509/1, 2
0
SEP89
536509/3
1
MAR93
536509/4
2
JUN94
536509/5
0
SEP89
536510/1, 2
0
SEP89
536510/3
1
MAR93
536510/4
2
JUN94
536510/5, 6
0
SEP89
536521/1, 2
0
SEP89
536521/3, 4
1
MAR93
536521/5
2
JUN94
536523/1
0
SEP89
536523/2, 3
1
MAR93
536523/4
2
JUN94
536523/5, 6
0
SEP89
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
536541/1
0
SEP89
536541/2, 3
2
JUN94
536541/4
2
JUN94
536546/1
0
SEP89
536546/2
1
MAR93
536546/3
2
JUN94
536546/4-6
0
SEP89
536547/1
0
SEP89
536547/2
1
MAR93
536547/3
2
JUN94
536547/4
0
SEP89
536548/1, 2
0
SEP89
536548/3, 4
1
MAR93
536548/5
2
JUN94
536548/6-8
1
MAR93
536596/1, 2
0
SEP89
536596/3
1
MAR93
536596/4
2
JUN94
536596/5
0
SEP89
536598/1, 2
0
SEP89
536598/3, 4
1
MAR93
536598/5
2
JUN94
536598/6-9
0
SEP89
536599/1
0
SEP89
536599/2
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
536599/3-6
2
JUN94
536599/7
2
JUN94
536651/1, 2
0
SEP89
536651/3, 4
1
MAR93
536651/5
2
JUN94
536652/1-3
0
SEP89
536652/4
1
MAR93
536652/5
2
JUN94
536652/6
0
SEP89
536704/1, 2
0
SEP89
536704/3
1
MAR93
536704/4
2
JUN94
536704/5
0
SEP89
546001/1
0
SEP89
546001/2, 3
1
MAR93
546001/4
2
JUN94
546001/5-10
1
MAR93
536014/1
0
SEP89
536014/2, 3
1
MAR93
536014/4
2
JUN94
536014/5-7
0
SEP89
556002/1
0
SEP89
556002/2, 3
1
MAR93
556002/4
2
JUN94
556002/5-7
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
556003/1-4
0
SEP89
556003/5, 6
1
MAR93
556003/7
2
JUN94
556003/8-10
1
MAR93
556004/1, 2
0
SEP89
556004/3
1
MAR93
556004/4
2
JUN94
576004/1
0
SEP89
576004/2
1
MAR93
576004/3
2
JUN94
576004/4-6
0
SEP89
576007/1
0
SEP89
576007/2
1
MAR93
576007/3
2
JUN94
576007/4-6
0
SEP89
576009/1
0
SEP89
576009/2
1
MAR93
576009/3
2
JUN94
576009/4-6
0
SEP89
576011/1
0
SEP89
576011/2
1
MAR93
576011/3
2
JUN94
576011/4-6
0
SEP89
576013/1-3
0
SEP89
576013/4
1
MAR93
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
576013/5-8
2
JUN94
576013/9
2
JUN94
576017/1
0
SEP89
576017/2
1
MAR93
576017/3
2
JUN94
576017/4
0
SEP89
576021/1
0
SEP89
576021/2
1
MAR93
576021/3
2
JUN94
576021/4-6
0
SEP89
576029/1, 2
0
SEP89
576029/3
1
MAR93
576029/4
2
JUN94
576029/5-7
0
SEP89
576031/1
0
SEP89
576031/2
1
MAR93
576031/3
2
JUN94
576031/4-6
0
SEP89
576035/1
0
SEP89
576035/2
1
MAR93
576035/3
2
JUN94
576035/4-6
0
SEP89
576037/1
0
SEP89
576037/2
1
MAR93
576037/3-6
2
JUN94
Page Number
Revision Level
Shown on Page
Date
Shown on Page
Section 9
576037/7
2
JUN94
576041/1-4
0
SEP89
576041/5, 6
2
JUN94
576047/1
0
SEP89
576047/2-6
2
JUN94
576051/1
0
SEP89
576051/2
1
MAR93
576051/3
2
JUN94
576051/4-6
0
SEP89
576062/1, 2
1
MAR93
576062/3-5
2
JUN94
576063/1-5
2
JUN94
576064/1-6
2
JUN94
576065/1-7
2
JUN94
576067/1-3
2
JUN94
576068/1-3
2
JUN94
576070/1-7
2
JUN94
This incorporation by reference of Airbus Industrie SSID, dated September 1989, was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51, as of March 9, 1993 (58 FR 6703, February 2,1993). The incorporation by reference of Airbus Industrie A300 SSID, Revision 2, dated June 1994, is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(p) This amendment becomes effective on August 9, 1996.