97-16-05 GULFSTREAM AEROSPACE CORPORATION: Amendment 39-10096. Docket 97-NM-18-AD. Supersedes AD 67-04-01, Amendment 39-1234.
Applicability: All Model G-159 (G-I) airplanes, certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been otherwise modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d)(1) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To detect and prevent corrosion in the lower skins of the wing center section, which could reduce the integrity of the wing-to-fuselage fitting and consequently could lead to separation of the wing from the airplane, accomplish the following:
(a) For all airplanes: Within 4 weeks after July 3, 1971 (the effective date of AD 67-04-01, amendment 39-1234), remove the bottom wing center fairings having part numbers (P/N) 159W10400-121 and 159W10401-121, or use an FAA-approved equivalent method, to perform a visual inspection to detect corrosion of the wing planks under these fairings.
NOTE 2: Paragraph (a) of this AD merely restates the actions previously required by AD 67-04-01, amendment 39-1234. As allowed by the phrase, "unless accomplished previously," if those requirements of AD 67-04-01 have already been accomplished, this AD does not require that those actions be repeated.
NOTE 3: Care must be exercised when removing the fairings, since the attaching rivets go into the pressure vessel. Use caution not to enlarge rivet holes when removing rivets. When reinstalling the fairings, an adequate type fastener and sealant must be used.
NOTE 4: Grumman Service Newsletter, Volume 166, dated August-September 1966, pertains to this subject.
(b) For airplanes on which a protective paint system has not been installed in accordance with Grumman Gulfstream I Aircraft Service Change No. 190, dated June 28, 1971: Accomplish paragraphs (b)(1) and (b)(2) of this AD. As of the effective date of this AD, the inspections required by this paragraph shall be accomplished in accordance with Grumman Gulfstream I Aircraft Service Change No. 190, dated June 28, 1971.
NOTE 5: The repeated inspection referred to in this paragraph is the same inspection previously required by AD 67-04-01. Paragraph (b)(1) of this AD merely restates the requirement of AD 67-04-01 to repeat the inspection at intervals of 6 months. Paragraph (b)(2) permits the reinspection interval to be extended to 18 months once the specified protective paint system is installed.
(1) As a result of the inspection required by paragraph (a) of this AD:
(i) If no corrosion is detected, repeat the inspection thereafter at intervals not to exceed 6 months (26 weeks) until the actions specified in paragraph (b)(2) of this AD are accomplished.
(ii) If any corrosion is detected, prior to further flight, either repair the corroded part with an FAA-approved repair; or replace the corroded part with a new or serviceable part of the same part number; or replace the corroded part with a part approved by the FAA. Thereafter, continue to perform the inspection at intervals not to exceed 6 months (26 weeks) until paragraph (b)(2) of this AD is accomplished.
(2) Within 12 months after the effective date of this AD, install the protective paint system in accordance with Grumman Gulfstream I Aircraft Service ChangeNo. 190, dated June 28, 1971. After installation, continue to perform the inspection required by this paragraph at intervals not to exceed 18 months.
(c) For airplanes on which a protective paint system has been installed previously in accordance with Grumman Gulfstream I Aircraft Service Change No. 190, dated June 28, 1971: Accomplish paragraphs (c)(1) and (c)(2) of this AD. As of the effective date of this AD, the inspections required by this paragraph shall be accomplished in accordance with Grumman Gulfstream I Aircraft Service Change No. 190, dated June 28, 1971.
NOTE 6: The repeated inspection referred to in this paragraph is the same inspection previously required by AD 67-04-01. Paragraph (c)(1) of this AD merely restates the requirement of AD 67-04-01 to repeat the inspection at intervals of 12 months. Paragraph (c)(2) permits the reinspection interval to be extended to 18 months.
(1) As a result of the inspection required by paragraph (a) of this AD:(i) If no corrosion is detected, repeat the inspection thereafter at intervals not to exceed 12 months until paragraph (c)(2) of this AD is accomplished.
(ii) If any corrosion is detected, prior to further flight, either repair the corroded part with an FAA-approved repair; or replace the corroded part with a new or serviceable part of the same part number; or replace the corroded part with a part approved by the FAA. Thereafter, continue to perform the inspection at intervals not to exceed 12 months until paragraph (c)(2) of this AD is accomplished.
(2) Within 18 months since the last inspection accomplished in accordance with paragraph (c)(1) of this AD (i.e., the last inspection accomplished in accordance with AD 67-04- 01), repeat the inspection specified in paragraph (c)(1) of this AD.
(i) If no corrosion is detected, repeat the inspection thereafter at intervals not to exceed 18 months.
(ii) If any corrosion is detected, prior to further flight, repair in accordance with the service change. After repair, continue to perform the inspection at intervals not to exceed 18 months.
(d) (1) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Atlanta Aircraft Certification Office (ACO), FAA, Small Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Atlanta ACO.
(2) Alternative methods of compliance, approved previously in accordance with AD 67-04-01, amendment 39-1234, are approved as alternative methods of compliance with this AD.
NOTE 7: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Atlanta ACO.
(e) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
(f) The actions shall be done in accordance with Grumman Gulfstream I Aircraft Service Change No. 190, dated June 28, 1971. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Gulfstream Aerospace Corporation, Technical Operations Department, P.O. Box 2206, M/S D-10, Savannah, Georgia 31402-2206. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Atlanta Aircraft Certification Office, Small Airplane Directorate, Campus Building, 1701 Columbia Avenue, Suite 2-160, College Park, Georgia; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(g) This amendment becomes effective on September 5, 1997.