AD 55-05-01

Active

Pitch Control Link

Key Information
55-05-01
Active
Not specified
Not specified
Unknown
N/A
Applicability
["Aircraft"]
["Rotorcraft"]
Scotts-Bell 47 Inc
47B 47B3 47D 47D1 47G
Regulatory Text

55-05-01 BELL: Applies to All Models 47B, 47B3, 47D, 47D1, 47G Helicopters.

Compliance required at the expiration of 50 flying hours total time. Twenty-five additional flying hours may be acceptable provided the inspection called for in Bell's Mandatory Service Bulletin No. 97, Revision A, is complied with.

In order to prevent seizing, binding or brinelling of pitch control link bearings in the tail rotor pitch control links, P/N 47-641-032-1, it is necessary that these links be replaced with a newly designed tail rotor control link, P/N 47-641-070-1. This new control link incorporates a spherical type bearing in place of the self-aligning ball type bearing.

(Bell Mandatory Service Bulletin No. 97, Revision "A" dated December 3, 1954, covers this same subject and outlines the details for the installation.)

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
This information is not available.
--- - Part 39
FAA Documents