99-21-21 AIRBUS INDUSTRIE: Amendment 39-11366. Docket 99-NM-08-AD.
Applicability: Model A310-300 and A300-600R series airplanes, except those airplanes on which Airbus Modification 10003 (reference Airbus Service Bulletin A310-28-2058, Revision 2, dated February 22, 1995, or A300-28-6035, Revision 03, dated August 5, 1999) has been accomplished; certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been otherwise modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (e) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent fuel leakage from the seal of the water scavenge pumps, which, if not corrected, could result in leakage of fuel into fuselage areas not designed for fuel, and consequent potential for fuel to be in contact with a fuel ignition source, accomplish the following:
Model A310-300 Series Airplanes: Modification
(a) For Model A310-300 series airplanes on which a water scavenge pump has been installed prior to the effective date of this AD, in accordance with Airbus Modification 8679 (reference Airbus Service Bulletin A310-28-2049, dated February 6, 1992; Revision 1, dated June 17, 1992; Revision 2, dated June 3, 1994; or Revision 3, dated April 5, 1996): Within 18 months after the effective date of this AD, install a new cover assembly, associated new drain and vent pipework, and a new electrical harness, in accordance with Airbus Service Bulletin A310- 28-2058, Revision 2, dated February 22, 1995.
(b) For Model A310-300 series airplanes on which a water scavenge pump is installed after the effective date of this AD, in accordance with Airbus Modification 8679 (reference Airbus Service Bulletin A310-28-2049, dated February 6, 1992; Revision 1, dated June 17, 1992; Revision 2, dated June 3, 1994; or Revision 3, dated April 5, 1996): The actions required by paragraph (a) of this AD must be accomplished simultaneously with Airbus Modification 8679.
Model A300-600R Series Airplanes: Modification
(c) For Model A300-600R series airplanes on which a water scavenge pump has been installed prior to the effective date of this AD, in accordance with Airbus Modification 8679 (reference Airbus Service Bulletin A300-28-6028, dated February 6, 1992; Revision 1, dated June 5, 1992; Revision 2, dated October 14, 1993; Revision 3, dated April 5, 1996; or Revision 4, dated April 3, 1997): Within 18 months after the effective date of this AD, install a new cover assembly, associated new drain and vent pipework, and a new electrical harness, in accordance with Airbus Service A300-28-6035, Revision 03, dated August 5, 1999.
NOTE 2: Installation of a new cover assembly, associated new drain and vent pipework, and a new electrical harness in accordance with Airbus Service Bulletin A300-28-6035, Revision 1, dated December 4, 1992, or Revision 2, dated March 17, 1993, is considered acceptable for compliance with the requirements specified in paragraph (c) of this AD.
(d) For Model A300-600R series airplanes on which a water scavenge pump is installed after the effective date of this AD, in accordance with Airbus Modification 8679 (reference Airbus Service Bulletin A300-28-6028, dated February 6, 1992; Revision 1, dated June 5, 1992; Revision 2, dated October 14, 1993; Revision 3, dated April 5, 1996; or Revision 4, dated April 3, 1997): The actions required by paragraph (c) of this AD must be accomplished simultaneously with Airbus Modification 8679.
Alternative Methods of Compliance
(e) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, International Branch, ANM-116, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, International Branch, ANM-116.
NOTE 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the International Branch, ANM-116.
Special Flight Permits
(f) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this ADcan be accomplished.
Incorporation by Reference
(g) The actions shall be done in accordance with Airbus Service Bulletin A310 -28-2058, Revision 2, dated February 22, 1995; and Airbus Service A300-28-6035, Revision 03, dated August 5, 1999; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
NOTE 4: The subject of this AD is addressed in French airworthiness directive 98-354-256(B), dated September 9, 1998.
(h) This amendment becomes effective on November 17, 1999.