96-05-02 FOKKER: Amendment 39-9527. Docket 94-NM-122-AD.
Applicability: Model F28 Mark 0100 series airplanes; as listed in Fokker Service Bulletin SBF100-24-029, dated June 28, 1993; certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent a short in the electrical wiring of the auxiliary power unit (APU) and a potential fire hazard, accomplish the following:
(a) Within 250 flight hours after the effective date of this AD, accomplish paragraphs (a)(1) and (a)(2) of this AD.
(1) Modify Nordskog Galley Model 1-871, in accordance with paragraphs 2.A., 2.B., and 2.C. of the Accomplishment Instructions of Fokker Service Bulletin SBF100-24-029, dated June 28, 1993.
(2) Perform an inspection to detect damage of and to determine the adequacy of clearance of the generator wires, having part numbers (P/N) AJC0001A, AJ0001B, and AJC0001C, of the auxiliary power unit (APU), in accordance with Fokker Service Bulletin SBF100-24-029, dated June 28, 1993.
(i) If no wires are found damaged and they adequately clear the adjacent structure (positive clearance), no further action is required by this paragraph.
(ii) If no wires are found damaged, but they do notadequately clear the adjacent structure, repeat the inspection thereafter at intervals not to exceed 250 flight hours.
(iii) If any wire is found damaged, prior to further flight, modify the Nordskog Galley Model 1-871 in accordance with paragraph (b) of this AD, and repair or replace the damaged wire in accordance with the service bulletin. However, the modification and repair/replacement actions may be postponed for a maximum of 10 days after detection of the damage, provided that the APU generator is rendered inoperative in accordance with the Master Minimum Equipment List (MMEL), and that modification and repair/replacement actions are accomplished prior to reactivation of the APU generator.
(b) At the next removal of the Nordskog Galley Model 1-871, or within 9,000 flight hours after the effective date of this AD, whichever occurs first, modify the Nordskog Galley in accordance with Fokker Service Bulletin SBF100-24-029 (reference Nordskog Engineering Change Order 43589 Attachment), dated June 28, 1993. Accomplishment of this modification constitutes terminating action for the repetitive inspection requirements of this AD.
(c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.
NOTE 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.
(d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
(e) The actions shall be done in accordance with Fokker Service Bulletin SBF100-24-029, dated June 28, 1993, including Nordskog Engineering Change Order 43589 Attachment. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Fokker Aircraft USA, Inc., 1199 North Fairfax Street, Alexandria, Virginia 22314. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(f) This amendment becomes effective on April 3, 1996.