AD 90-19-12

Active

Cargo Door Latch Bolts

Key Information
90-19-12
Active
October 01, 1990
Not specified
90-NM-170-AD
39-6735
Applicability
["Aircraft"]
["Large Airplane"]
The Boeing Company
DC-10-10 DC-10-10F DC-10-15 DC-10-30 DC-10-30F (KC-10A, KDC-10) DC-10-30F (KC-10A, KDC-10) DC-10-30F (KC-10A, KDC-10) DC-10-40 DC-10-40F
Regulatory Text

90-19-12 MCDONNELL DOUGLAS: Amendment 39-6735. Docket No. 90-NM-170-AD. \n\n\tApplicability: McDonnell Douglas Model DC-10 series airplanes, manufacturer's fuselage numbers 1 through 379, certificated in any category. \n\n\tCompliance: Required as indicated. To prevent inadvertent opening of a cargo door in flight, a condition which could result in loss of pressurization and control of the aircraft, accomplish the following: \n\n\tA.\tExcept as provided in paragraph B. of this AD, within 30 calendar days after the effective date of this AD, unless previously accomplished within the last 60 days, remove sealant in accordance with Figure 1, Step 2, and perform the torque test on the cargo door latch spool fitting attach bolts, in accordance with the Accomplishment Instructions for Group 1, Phase 1, of McDonnell Douglas DC-10 Service Bulletin 52-183, Revision 2, dated April 15, 1981 (hereafter referred to as the Service Bulletin). \n\n\tNOTE: The requirements of this AD are applicableto Model DC-10 series airplanes, manufacturers's fuselage numbers 1 through 379, regardless of the effectivity as specified in the McDonnell Douglas Service Bulletin. \n\n\t\t1.\tIf a bolt breaks, prior to further flight, replace it with a new bolt and seal in accordance with Figure 1 of the Service Bulletin. \n\n\t\t2.\tIf a bolt passes the torque test, prior to further flight, retorque the bolt and seal in accordance with the Accomplishment Instructions for Group 1, Phase 1, of the Service Bulletin. \n\n\tB.\tThe test required by paragraph A. of this AD is not required for Inconel bolts, part numbers RA21026-7, 77711-7, and 3D0031-7 (grip lengths as applicable per location as specified in Figure 1, sheets 3 and 4, of the Service Bulletin). \n\n\tC.\tSpecial flight permits may be issued in accordance with FAR 21.197 and 21.199 to operate airplanes unpressurized to a base for the accomplishment of the requirements of this AD. \n\n\tD.\tAn alternate means of compliance or adjustment of the compliance time, which provides an acceptable level of safety, may be used when approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. \n\n\tNOTE: The request should be submitted directly to the Manager, Los Angeles ACO, and a copy sent to the cognizant FAA Principal Inspector (PI). The PI will then forward comments or concurrence to the Los Angeles ACO. \n\n\tAll persons affected by this directive who have not already received the appropriate service information from the manufacturer may obtain copies upon request to McDonnell Douglas Corporation, P. O. Box 1771, Long Beach, California 90846-0001, Attention: Business Unit Manager, Technical Publications, C1-HDR (54-60). These documents may be examined at the FAA, Northwest Mountain Region, Transport Airplane Directorate, 1601 Lind Avenue S.W., Renton, Washington, or the Los Angeles Aircraft Certification Office, 3229 East Spring Street, Long Beach, California. \n\n\tThis amendment (39-6735, AD 90-19-12) becomes effective on October 1, 1990.

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
This information is not available.
--- - Part 39
FAA Documents