96-10-10 JETSTREAM: Amendment 39-9617. Docket 95-NM-95-AD.
Applicability: Model 4101 airplanes; equipped with handrail assembly, Part No. 6020203 Issue C, with Modification No. JM41179 (reference Jetstream Alert Service Bulletin J41-A52-009); certificated in any category.
NOTE 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been otherwise modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent failure of the entrance door handrail assembly, which subsequently could result in injury to passengers, flightcrew, or groundcrew, accomplish the following:
(a) Within 50 landings after the effective date of this AD, conduct a detailed visual inspection of the handrail assembly at the main entrance door to detect loose or missing rivets, abnormal movement between the handrail pivot-tube and the spigot that attaches to the bearing assembly, and cracks on the handrail pivot-tube, in accordance with Jetstream Alert Service Bulletin J41-A52-036, dated June 13, 1994.
(b) If no cracks or other discrepancies are detected during the inspection required by paragraph (a) of this AD, repeat the inspection thereafter at intervals not to exceed 300 hours time-in-service.
(c) If evidence of any loose or missing rivet is revealed, or if abnormal movement between the handrail pivot-tube and the spigot that attaches to the bearing assembly is detected, as a result of any of the inspections required by this AD, prior to further flight, accomplish the procedures specified in paragraph 2.B.(4) of Jetstream Alert Service Bulletin J41-A52-036, dated June 13, 1994. Thereafter, repeat the inspection required by paragraph (a) of this AD at intervals not to exceed 300 hours time-in-service.
(d) If evidence of cracking is revealed as a result of any of the inspections required by this AD, prior to further flight, accomplish the requirements of either paragraph (d)(1), (d)(2), or (d)(3) of this AD:
(1) Install a new handrail assembly, Part No. 6020203 Issue C standard, as specified in paragraph 2.B.(5)(d) of Jetstream Alert Service Bulletin J41-A52-036, dated June 13, 1994. After installation, repeat the inspection required by paragraph (a) of this AD at intervals not to exceed 300 hours time-in-service. Or
(2) Install the interim reinforcement of the handrail assembly (Customer Option Kit. No. Jk42619) in accordance with Jetstream Service Bulletin J41-52-041-42619, dated June 13, 1994. Such installation constitutes terminating action for the inspections required by this AD. Or
NOTE 2: Jetstream Service Bulletin J41-52-041-42619 refers to Flight Refuelling Service Bulletin 6020303-52-1 for additional installation information.
(3) Install the structural improvements of the door and door support, and the completely redesigned door handrail assembly, in accordance with Jetstream Service Bulletin J41-52-025, dated February 11, 1994. Such installation constitutes terminating action for the inspections required by this AD.
NOTE 3: Jetstream Service Bulletin J41-52-025 refers to Flight Refuelling Service Bulletin 6020303-52-2 for additional installation information.
(e) Terminating action for the inspections required by this AD consists of installation of the item(s) specified in either paragraph (e)(1) or (e)(2) of this AD:
(1) Installation of the interim reinforcement of the handrail assembly (Customer Option Kit. No. Jk42619) in accordance with Jetstream Service Bulletin J41-52-041-42619, dated June 13, 1994. Or
(2) Installation of the structural improvements of the door and door support, and the completely redesigned door handrail assembly, in accordance with Jetstream Service Bulletin J41-52-025, dated February 11, 1994.
(f) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Standardization Branch, ANM-113, FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Standardization Branch, ANM-113.
NOTE 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Standardization Branch, ANM-113.
(g) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
(h) The inspections shall be done in accordance with Jetstream Alert Service Bulletin J41-A52-036, dated June 13, 1994. The interim reinforcement of the handrail assembly shall be done in accordance with Jetstream Service Bulletin J41-52-041-42619, dated June 13, 1994. The installation of the structural improvements of the door and door support, and the completely redesigned door handrail assembly, shall be done in accordance with Jetstream Service Bulletin J41-52-025, dated February 11, 1994. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Jetstream Aircraft, Inc., P.O. Box 16029, Dulles International Airport, Washington, DC 20041-6029. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
(i) This amendment becomes effective on June 18, 1996.