AD 47-10-19

Active

Cabin Heater Fuel Solenoid Valve

Key Information
47-10-19
Active
Not specified
Not specified
Unknown
N/A
Applicability
["Aircraft"]
["Large Airplane"]
Lockheed Aircraft Corporation
49-46
Regulatory Text

47-10-19 LOCKHEED: (Was Mandatory Note 21 of AD-763-3.) Applies to All Model 49 Serials Up to and Including 2088, Except as Noted.

Compliance required not later than 100 hours of operation after June 10, 1947.

(a) In each cabin heater installation, relocate and waterproof the fuel solenoid valve and replace and reroute the fuel pump bypass line.

(LAC Service Bulletin 49/SB-73 covers this same subject.)

(b) In zone 2 of each nacelle, install heat protective shield between propeller feathering line and cowl diaphragm. Applies to all serials up to and including 2082.

(LAC Service Bulletin 49/SB-150 covers this same subject.)

(c) In each outboard nacelle main junction box, replace existing mounting nuts (tinnerman) and PK screws with AN 366 nuts and NAS 221 screws.

(LAC Service Bulletin 49/SB-152 covers this same subject.)

(d) Drill one 1/4-inch drain hole on lower center line of spinner fairing lower panel assembly for each engine.

(LAC Service Instruction 49/SI-95 covers this same subject.)

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
This information is not available.
--- - Part 39
FAA Documents