AD 75-17-21

Active

Cabin Pressurization

Key Information
75-17-21
Active
August 19, 1975
Not specified
Unknown
39-2323
Applicability
["Aircraft"]
["Large Airplane"]
Textron Aviation Inc.
BH.125 Series 400A BH.125 Series 600A DH.125 Series 1A DH.125 Series 1A-522 DH.125 Series 1A/R-522 DH.125 Series 1A/S-522 DH.125 Series 3A DH.125 Series 3A/R DH.125 Series 3A/RA DH.125 Series 400A
Regulatory Text

75-17-21 HAWKER SIDDELEY AVIATION, LTD: Amendment 39-2323. Applies to DH-125 and BH-125 airplanes certificated in all categories.

Compliance required as indicated.

To prevent possible rapid loss of cabin pressurization, accomplish the following:

Within 50 hours time in service after the effective date of this AD, unless already accomplished, inspect all Hellerman type cabin pressure seal bungs for displacement and rework as necessary in accordance with the following:

(a) Locate all Hellerman type cabin pressure seal bungs for the particular aircraft being inspected.

NOTE: Refer to the relevant aircraft wiring diagram manual (2 volumes) and to the maintenance practices in the Maintenance Manual, Chapter 24-00 (all series pre-600) and Chapter 24-01 (series 600). Pressure bung installations may be of the normal or reverse type assembly as defined in the Maintenance Manual reference noted in paragraph (c) of this AD. The total number may vary from one airplane toanother depending on the electrical equipment installed.

(b) Gain access to the bungs in accordance with the procedures in the Maintenance Manual, Chapters 24 and 25.

(c) Inspect the bungs (both normal and reverse assemblies) for displacement and reinspect and/or rework as necessary in accordance with the instructions contained in Part B of temporary revision dated April 1, 1975, to HSA Maintenance Manual, Chapter 24-00 (all series except 600) and Chapter 24-01 (series 600), or the appropriate sections of the referenced chapters if the temporary revision has been incorporated into the HSA Maintenance Manual, or an FAA-approved equivalent.

(d) Where pressure bung(s) have been removed for rework, upon re-installation of the pressure bung(s) conduct a cabin leak rate check in accordance with the appropriate provisions of chapter 21 of the HSA Maintenance Manual prior to further flight to ensure the integrity of the pressure cabin.

This amendment becomes effective August 19, 1975.

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
This information is not available.
--- - Part 39
FAA Documents