AD 63-15-02

Active

Bolt Attaching Flap Jack to Wing

Key Information
63-15-02
Active
August 22, 1963
Not specified
Unknown
N/A
Applicability
["Aircraft"]
["Small/Large Airplane"]
de Havilland Aircraft Co., Ltd., The
D.H.114 Heron Series 2A D.H.114 Heron Series 2DA D.H.114 Heron Series 2X
Action Required

Final Rule

Regulatory Text

63-15-02 DE HAVILLAND: Amdt. 588 Part 507 Federal Register July 23, 1963. Applies to All Model DH 114 Aircraft.

Compliance required within 200 hours' time in service after the effective date of this AD.

Because of instances of fatigue failure of the bolt, P/N 4W.1121, which attaches the flap jack attachment shackle to the wing, replace the bolt with a new special bolt P/N 14W.5835 in accordance with a de Havilland Heron Modification No. 1498.

(de Havilland TNS Series Heron (114) No. C.F.7 Issue 1 dated December 31, 1962, and de Havilland Modification News Sheet No. Heron 1498 dated January 1, 1963, cover this subject.)

This directive effective August 22, 1963.

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
References
Federal Register: July 23, 1963
--- - Part 39
FAA Documents