The Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive: \n\n2021-11-07 General Electric Company: Amendment 39-21569; Docket No. FAA-2020-0850; Project Identifier AD-2020-00288-E. \n\n(a) Effective Date \n\n\n\tThis airworthiness directive (AD) is effective July 30, 2021. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to: \n\t(1) General Electric Company (GE) GEnx-1B64, GEnx-1B64/P1, GEnx- 1B64/P2, GEnx-1B67, GEnx-1B67/P1, GEnx-1B67/P2, GEnx-1B70, GEnx- 1B70/75/P1, GEnx-1B70/75/P2, GEnx-1B70/P1, GEnx-1B70/P2, GEnx-1B70C/ P1, GEnx-1B70C/P2, GEnx-1B74/75/P1, GEnx-1B74/75/P2, GEnx-1B76/P2, GEnx-1B76A/P2 model turbofan engines with stages 6-10 compressor rotor spools in the high-pressure compressor (HPC) assembly with the following part numbers (P/N) installed: \n\t(i) P/N 2357M30G01, P/N 2357M30G02, P/N 2439M35G01, P/N 2439M35G02, or P/N 2445M40G02, all serial numbers (S/Ns); \n\t(ii) P/N 2610M90G01 with the S/Ns listed in paragraph 4., APPENDIX--A, Table 1 of the GE GEnx-1B Service Bulletin (SB) 72-0472 R02, dated November 5, 2020 (GEnx-1B SB 72-0472); and \n\t(iii) P/N 2628M56G01 with the S/Ns listed in paragraph 4., APPENDIX--A, Table 2 or Table 3 of GEnx-1B SB 72-0472. \n\t(2) GEnx-2B67, GEnx-2B67/P, GEnx-2B67B model turbofan engines with the following stages 6-10 compressor rotor spools P/Ns installed: \n\t(i) P/N 2357M30G02, P/N 2439M35G02, or P/N 2445M40G02, all S/Ns; \n\t(ii) P/N 2340M36G01 with S/Ns listed in paragraph 4., APPENDIX-- A, Table 1 of GE GEnx-2B SB 72-0415 R02, dated November 5, 2020 (GEnx-2B SB 72-0415); and \n\t(iii) P/N 2628M56G01 with S/Ns listed in paragraph 4., APPENDIX--A, Table 2 or Table 3 of GEnx-2B SB 72-0415. \n\n(d) Subject \n\n\n\tJoint Aircraft System Component (JASC) Code 7230, Turbine Engine Compressor Section. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by a finding during an inspection that two stages 6-10 compressor rotor spools were damaged at similar locations. In addition, the manufacturer reported that certain stages 6-10 compressor rotor spool webs did not undergo a required fluorescent penetrant inspection (FPI) during production. The FAA is issuing this AD to prevent failure of the compressor rotor spool. The unsafe condition, if not addressed, could result in uncontained release of debris, damage to the engine, and damage to the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Required Actions \n\n\n\t(1) For all affected GEnx-1B and GEnx-2B model turbofan engines, before exceeding the compliance time in Table 1 to paragraph (g)(1) of this AD,perform a borescope inspection (BSI) or eddy current inspection (ECI) of the stage 6, stage 7, and stage 8 webs, web transitions, and bore faces of the stages 6-10 compressor rotor spool in accordance with the Accomplishment Instructions, paragraph 3, of GEnx-1B SB 72-0472 (for GEnx-1B models) or the Accomplishment Instructions, paragraph 3, of GEnx-2B SB 72-0415 (for GEnx-2B models). \n\n\n\tTable 1 to Paragraph (g)(1) ------------------------------------------------------------------------ Cycles Since New (CSN) accumulated \n\ton the stages 6-10 compressor Compliance time \n\trotor spool ------------------------------------------------------------------------ Less than 6,400 CSN............... Next engine shop visit or before the \n\tstages 6-10 compressor rotor spool \n\taccumulates 6,500 CSN, whichever \n\toccurs first after the effective \n\tdate of this AD. 6,400 CSN or greater.............. Within 100 flight cycles after the \n\teffective date of this AD. ------------------------------------------------------------------------ \n\n\n\t(i) For GEnx-1B model turbofan engines, except those identified in paragraph 4, APPENDIX--A, Table 3 of SB 72-0472, if, before the effective date of this AD, the engines have undergone inspections of the aft web of stage 6, stage 7, and stage 8 of the stages 6-10 compressor rotor spool using both GE GEnx-1B SB 72-0448 R00, dated July 29, 2019, and GE GEnx-1B SB 72-0460 R00, dated October 30, 2019, regardless of the CSN accumulated on the stages 6-10 compressor rotor spool, perform the inspection required by paragraph (g)(1) of this AD no later than the next engine shop visit after the effective date of this AD. \n\t(ii) For GEnx-2B model turbofan engines, except those identified in paragraph 4., APPENDIX--A, Table 3 of SB 72-0415, if, before the effective date of this AD, the engines have undergone inspections of the aft web of stage 6, stage 7, and stage 8 of the stages 6-10 compressor rotor spool using both GE GEnx-2B SB 72-385 R02, dated July 29, 2019, and GE GEnx-2B SB 72-0398 R00, dated October 30, 2019, regardless of the CSN accumulated on the stages 6-10 compressor rotor spool, perform the inspection required by paragraph (g)(1) of this AD no later than the next engine shop visit after the effective date of this AD. \n\t(2) For all affected GEnx-1B and GEnx-2B model turbofan engines, during the inspections required by paragraph (g)(1) of this AD, if a rejectable indication is found, before further flight, remove the stages 6-10 compressor rotor spool from service and replace it with a part eligible for installation. \n\n(h) Definitions \n\n\n\t(1) For the purpose of this AD, an ''engine shop visit'' is the induction of an engine into the shop for maintenance involving the separation of pairs of major mating engine flanges, except that the separation of engine flanges solely for the purposes of transportation of the engine without subsequent engine maintenance does not constitute an engine shop visit. \n\t(2) For the purpose of this AD, a rejectable indication is: \n\t(i) A BSI indication that does not meet the BSI serviceable or repairable limits referenced in the Accomplishment Instructions, paragraph 3.A.(1)(a)2, of GEnx-1B SB 72-0472, or paragraph 3.A.(1)(a)2 of GEnx-2B SB 72-0415, and the affected part has not undergone a subsequent ECI; or \n\t(ii) A BSI indication that does not meet the BSI serviceable or repairable limits referenced in the Accomplishment Instructions, paragraph 3.A.(1)(a)2, of GEnx-1B SB 72-0472, or paragraph 3.A.(1)(a)2 of GEnx-2B SB 72-0415, and the affected part has undergone a subsequent ECI in which the indication did not meet the ECI serviceable or repairable limits referenced in the \n\n((Page 33498)) \n\nAccomplishment Instructions, paragraph 3.A.(1)(b) of GEnx-1B SB 72- 0472, or paragraph 3.A.(1)(b) of GEnx-2B SB 72-0415; or \n\t(iii) An ECI indication that does not meet the serviceable or repairable limits referenced in the Accomplishment Instructions, paragraph 3.A.(1)(b) of GEnx-1B SB 72-0472, or paragraph 3.A.(1)(b) of GEnx-2B SB 72-0415. \n\n(i) Credit for Previous Actions \n\n\n\t(1) For affected GEnx-1B model turbofan engines, you may take credit for the BSI or ECI required by paragraph (g)(1) of this AD, if you performed an ECI of the stages 6-10 compressor rotor spool webs, web transitions, and bore faces before the effective date of this AD using Subtask 72-31-45-160-002 of TASK 72-31-45-200-807 in GE GEnx-1B Engine Manual 05-21-00, Life Limits 001 Mandatory Inspections, Rev. 31, dated January 31, 2020, or earlier, and no rejectable indications were found. \n\t(2) For affected GEnx-2B model turbofan engines, you may take credit for the BSI or ECI required by paragraph (g)(1) of this AD, if you performed and ECI of the stages 6-10 compressor rotor spool webs, web transitions, and bore faces before the effective date of this AD using Subtask 72-31-45-160-002 of TASK 72-31-45-200-801 in GE GEnx-2B Engine Manual 05-21-00, Life Limits 001 Mandatory Inspections, Rev. 24, dated January 31, 2020, or earlier, and no rejectable indications were found. \n\t(3) For affected GEnx-1B model turbofan engines, you may take credit for the BSI or ECI required by paragraph (g)(1) of this AD, if you performed that inspection before the effective date of this AD using GE GEnx-1B Service Bulletin (SB) 72-0472 R00, dated April 24, 2020, or GE GEnx-1B SB 72-0472 R01, dated July 24, 2020, and no rejectable indications were found. \n\t(4) For affected GEnx-2B model turbofan engines, you may take credit for the BSI or ECI required by paragraph (g)(1) of this AD, if you performed that inspection before the effective date of this AD using GE GEnx-2B SB 72-0415 R00, dated April 24, 2020, or GE GEnx-2B SB 72-0415 R01, dated July 24, 2020, and no rejectable indications were found. \n\n(j) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, ECO Branch, FAA, has the authority to approve AMOCs for this AD, if requested usingthe procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the certification office, send it to the attention of the person identified in Related Information. You may email your request to: ANE-AD-AMOC@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\n(k) Related Information \n\n\n\tFor more information about this AD, contact Mehdi Lamnyi, Aviation Safety Engineer, ECO Branch, FAA, 1200 District Avenue, Burlington, MA 01803; phone: (781) 238-7743; fax: (781) 238-7199; email: Mehdi.Lamnyi@faa.gov. \n\n(l) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) GE GEnx-1B Service Bulletin (SB) 72-0472 R02, dated November 5, 2020. \n\t(ii) GE GEnx-2B SB 72-0415 R02, dated November 5, 2020. \n\t(3) For General Electric Company service information identified in this AD, contact General Electric Company, 1 Neumann Way, Cincinnati, OH 45215; phone: (513) 552-3272; email: aviation.fleetsupport@ae.ge.com; website: www.ge.com. \n\t(4) You may view this service information at FAA, Airworthiness Products Section, Operational Safety Branch, 1200 District Avenue, Burlington, MA 01803. For information on the availability of this material at the FAA, call (781) 238-7759. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, email: fedreg.legal@nara.gov, or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html. \n\n\n\tIssued on May 19, 2021. Gaetano A. Sciortino, Deputy Director for Strategic Initiatives, Compliance & Airworthiness Division, Aircraft Certification Service. (FR Doc. 2021-13424 Filed 6-24-21; 8:45 am) BILLING CODE 4910-13-P