The Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive: \n\n2021-05-08 Safran Helicopter Engines, S.A. (Type Certificate previously held by Turbomeca, S.A.): Amendment 39-21451; Docket No. FAA-2020-1118; Project Identifier MCAI-2020-00516-E. \n\n(a) Effective Date \n\n\n\tThis airworthiness directive (AD) is effective April 15, 2021. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to all Safran Helicopter Engines, S.A. (Type Certificate previously held by Turbomeca, S.A.) Arriel 2C, 2C1, 2S1, and 2S2 model turboshaft engines. \n\n(d) Subject \n\n\n\tJoint Aircraft System Component (JASC) Code 7712, Engine BMEP/ Torque Indicating. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by investigations by the manufacturer following level 1 failures in flight (minor anomalies) and level 2 failures on the ground (minor failures), where cracks were found on the soldered joints of torque conformation boxes. The FAA is issuing this AD to prevent failure of the torque conformation box. The unsafe condition, if not addressed, could result in failure of the engine, in-flight shutdown, and loss of the helicopter. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Required Actions \n\n\n\t(1) For engines with the torque conformation box in pre- modification TU 34 configuration, installed on Arriel 2C and 2C1 model turboshaft engines; pre-modification TU 34 or post- modification TU 188 configuration, installed on Arriel 2S1 model turboshaft engines; or post-modification TU 188 configuration, installed on Arriel 2S2 model turboshaft engines: \n\t(i) Within 600 engine hours (EHs) or 180 days after the effective date of this AD, whichever occurs first, perform an initial inspection of the resistance values of the torque conformation box. \n\n\n\tNote 1 to paragraph (g)(1)(i): You may delay the initial inspection by up to 60 EHs to align with other scheduled maintenance tasks. \n\n\n\t(ii) Thereafter, perform repetitive inspections of the resistance values of the torque conformation box before exceeding 600 EHs since the last inspection of the resistance values of the torque conformation box. \n\t(2) Use the Accomplishment Instructions, paragraph 2.3.2 or 4.3.2, of Safran Helicopter Engines Mandatory Service Bulletin No. 292 72 2868, Version A, dated December 2018, to perform the inspections of the resistance values of the torque conformation box required by paragraph (g)(1) of this AD. \n\t(3) If, during any inspection required by paragraph (g)(1) of this AD, a non-conforming resistance value is found, before further flight, remove the torque conformation box from service and replace it with a part eligible for installation. \n\n(h) Definition \n\n\n\tFor the purpose of this AD, a ''part eligible for installation'' is a zero hour torque conformation box or a torque conformation box that has been inspected as required by paragraph (g)(1) of this AD. \n\n(i) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, ECO Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the certification office, send it to the attention of the person identified in Related Information. You may email your request to: ANE-AD-AMOC@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager ofthe local flight standards district office/certificate holding district office. \n\n(j) Related Information \n\n\n\t(1) For more information about this AD, contact Wego Wang, Aviation Safety Engineer, ECO Branch, FAA, 1200 District Avenue, Burlington, MA 01803; phone: (781) 238-7134; fax: (781) 238-7199; email: wego.wang@faa.gov. \n\t(2) Refer to European Union Aviation Safety Agency (EASA) AD 2019-0110, dated May 21, 2019, for more information. You may examine the EASA AD in the AD docket at https://www.regulations.gov by searching for and locating Docket No. FAA-2020-1118. \n\n(k) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Safran Helicopter Engines Mandatory Service Bulletin No. 292 72 2868, Version A, dated December 2018. \n\t(ii) (Reserved) \n\t(3) For Safran Helicopter Engines service information identified in this AD, contact Safran Helicopter Engines, S.A., Avenue du 1er Mai, Tarnos, France; phone: +33 (0) 5 59 74 45 11. \n\t(4) You may view this service information at FAA, Airworthiness Products Section, Operational Safety Branch, 1200 District Avenue, Burlington, MA 01803. For information on the availability of this material at the FAA, call (781) 238-7759. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, email: fedreg.legal@nara.gov, or go to: https://www.archives.gov/federal-register/cfr/ibr-locations.html. \n\n\n\tIssued on February 19, 2021. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. (FR Doc. 2021-05046 Filed 3-10-21; 8:45 am) BILLING CODE 4910-13-P