Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD) 2012-23-09, Amendment 39-17265 (77 FR 73270, December 10, 2012), and adding the following new AD: \n\n2017-16-08 Embraer S.A.: Amendment 39-18985; Docket No. FAA-2014- 0008; Product Identifier 2013-NM-076-AD. \n\n((Page 42023)) \n\n(a) Effective Date \n\n\n\tThis AD is effective October 11, 2017. \n\n(b) Affected ADs \n\n\n\tThis AD replaces 2012-23-09, Amendment 39-17265 (77 FR 73270, December 10, 2012) (''AD 2012-23-09''). \n\n(c) Applicability \n\n\n\tThis AD applies to Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 ECJ, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes; certificated in any category; serial numbers 19000002, 19000004, 19000006 through 19000213 inclusive, 19000215 through 19000276 inclusive, 19000278 through 19000466 inclusive, 19000468 through 19000525 inclusive, and 19000527 through 19000696 inclusive. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Codes 27, Flight controls; 28, Fuel; 52, Doors; 53, Fuselage; 54, Nacelles/pylons; 55, Stabilizers; 57, Wings; 71, Powerplant; and 78, Exhaust. \n\n(e) Reason \n\n\n\tThis AD was prompted by a determination that more restrictive airworthiness limitations are necessary. We are issuing this AD to detect and correct fatigue cracking of structural components and to prevent failure of certain system components; these conditions could result in reduced structural integrity and system reliability of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Retained Revision of theMaintenance Program, With No Changes \n\n\n\tFor Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW, ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes: This paragraph restates the actions required by paragraph (h) of AD 2012- 23-09, with no changes. Within 90 days after January 14, 2013 (the effective date of AD 2012-23-09), revise the maintenance program to incorporate the tasks specified in Part 2--Airworthiness Limitation Inspections (ALI)--Structures, of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010; and EMBRAER Temporary Revision (TR) 5-1, dated February 11, 2011, to Part 2-- Airworthiness Limitation Inspections (ALI)--Structures, of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010; with the thresholds and intervals stated in these documents. The initial compliance times for thetasks are stated in the ''Implementation Plan'' section of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010. \n\n(h) Retained No Alternative Actions or Intervals, With New Exception \n\n\n\tThis paragraph restates the actions required by paragraph (i) of AD 2012-23-09, with a new exception. After accomplishing the revision required by paragraph (g) of this AD, no alternative actions (e.g., inspections) or intervals, may be used, unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD, and except as required by paragraph (i) of this AD. \n\n(i) New Requirements of This AD: Revision of the Maintenance or Inspection Program \n\n\n\t(1) For Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW, ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes: Within 90 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the tasks specified in Part 2--Airworthiness Limitation Inspections-- Structures, of Appendix A--Airworthiness Limitations (AL), of the EMBRAER 190/195 Maintenance Review Board Report, MRB-1928, Revision 9, dated August 14, 2015 (''MRB-1928, Revision 9''); EMBRAER MRB--TR 9-1, dated October 27, 2015, to Part 2--Airworthiness Limitation Inspections--Structures, and Part 4--Life Limited Items, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; and EMBRAER MRB--TR 9-3, dated October 27, 2015, to Part 2-- Airworthiness Limitation Inspections--Structures, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; with the thresholds and intervals stated in these documents. The initial compliance times for the tasks are at the later of the times specified in paragraphs (i)(1)(i) and (i)(1)(ii) of this AD. Doing the revision required by this paragraph terminates therevision required by paragraph (g) of this AD. \n\t(i) Within the applicable times specified in MRB-1928, Revision 9; EMBRAER MRB--TR 9-1, dated October 27, 2015, to Part 2-- Airworthiness Limitation Inspections--Structures, and Part 4--Life Limited Items, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; and EMBRAER MRB--TR 9-3, dated October 27, 2015, to Part 2--Airworthiness Limitation Inspections--Structures, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9. Where tasks are listed in both MRB-1928, Revision 9, and a temporary revision, the compliance times in the temporary revision take precedence. \n\t(ii) Within 90 days or 600 flight cycles after the effective date of this AD, whichever occurs later. \n\t(2) For Model ERJ 190-100 ECJ airplanes: Within 90 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the tasks specified in Part 1, Certification Maintenance Requirements, Part 2, Airworthiness Limitation Inspections--Structures, Part 3, Fuel System Limitation Items, and Part 4, Life Limited Items, of Appendix A, Airworthiness Limitation, of the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14, 2014; EMBRAER MPG--TR 4- 2, dated February 13, 2015; and EMBRAER MPG--TR 4-3, dated October 30, 2015; with the thresholds and intervals stated in these documents. The initial compliance times for the tasks are at the later of the times specified in paragraphs (i)(2)(i) and (i)(2)(ii) of this AD. \n\t(i) Within the applicable times specified in Part 1, Certification Maintenance Requirements, Part 2, Airworthiness Limitation Inspections--Structures, Part 3, Fuel System Limitation Items, and Part 4, Life Limited Items, of Appendix A, Airworthiness Limitation (AL), of the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14, 2014; EMBRAER MPG--TR 4-2, dated February 13, 2015; and EMBRAERMPG--TR 4-3, dated October 30, 2015. Where tasks are listed in both MPG-2928, Revision 4, and a temporary revision, the compliance times in the temporary revision take precedence. \n\t(ii) Within 90 days or 600 flight cycles after the effective date of this AD, whichever occurs later. \n\n(j) No Alternative Actions, Intervals, and/or Critical Design Configuration Control Limitations (CDCCLs) \n\n\n\tAfter accomplishment of the revision required by paragraph (i) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used unless the actions, intervals, and/or CDCCLs are approved as an AMOC in accordance with the procedures specified in paragraph (k)(1) of this AD. \n\n(k) Other FAA AD Provisions \n\n\n\tThe following provisions also apply to this AD: \n\t(1) Alternative Methods of Compliance (AMOCs): The Manager, International Section, Transport Standards Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the International Section, send it to the attention of the person identified in paragraph (l)(2) of this AD. Information may be emailed to: 9-ANM-116-AMOC-REQUESTS@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(2) Contacting the Manufacturer: As of the effective date of this AD, for any requirement in this AD to obtain corrective actions from a manufacturer, the action must be accomplished using a method approved by the Manager, International Section, Transport Standards Branch, FAA; or the Ag(ecirc)ncia Nacional de Avia(ccedil)(atilde)o Civil (ANAC); or ANAC's authorized Designee. If approved by the ANAC Designee, the approval must include the Designee's authorized signature. \n\n(l) Related Information \n\n\n\t(1) Refer to Mandatory Continuing Airworthiness Information (MCAI) Brazilian \n\n((Page 42024)) \n\nAD 2016-04-01, effective April 4, 2016, for related information. This MCAI may be found in the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA- 2014-0008. \n\t(2) For more information about this AD, contact Ana Martinez Hueto, Aerospace Engineer, International Section, Transport Standards Branch, FAA, 1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-1622; fax 425-227-1320. \n\n(m) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless this AD specifies otherwise. \n\t(3) The following service information was approved for IBR on October 11, 2017. \n\t(i) Appendix A, Airworthiness Limitations (AL), of the EMBRAER ERJ 190/195 Maintenance Review Board Report, MRB-1928, Revision 9, dated August 14, 2015. \n\t(ii) Appendix A, Airworthiness Limitations (AL), of the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14, 2014. \n\t(iii) EMBRAER MPG--Temporary Revision 4-2, dated February 13, 2015. \n\t(iv) EMBRAER MPG--Temporary Revision 4-3, dated October 30, 2015. \n\t(v) EMBRAER MRB--Temporary Revision 9-1, dated October 27, 2015. \n\t(vi) EMBRAER MRB--Temporary Revision 9-3, dated October 27, 2015. \n\t(4) The following service information was approved for IBR on January 14, 2013 (77 FR 73270, December 10, 2012). \n\t(i) EMBRAER Temporary Revision (TR) 5-1, dated February 11, 2011, to Part 2--Airworthiness Limitation Inspections (ALI)-- Structures, of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010. \n\t(ii) Appendix A, Airworthiness Limitation (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010. \n\t(5) For service information identified in this AD, contact Embraer S.A., Technical Publications Section (PC 060), Av. Brigadeiro Faria Lima, 2170--Putim--12227-901 S(atilde)o Jose dos Campos--SP--BRASIL; telephone +55 12 3927-5852 or +55 12 3309-0732; fax +55 12 3927-7546; email distrib@embraer.com.br; Internet http://www.flyembraer.com. \n\t(6) You may view this service information at the FAA, Transport Standards Branch, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(7) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.