Adoption of the Amendment
Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0 1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0 2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD) 2014-20-01, Amendment 39-17974 (79 FR 59640, October 3, 2014), and adding the following new AD:
2016-10-10 Bombardier, Inc.: Amendment 39-18521. Docket No. FAA- 2015-3634; Directorate Identifier 2014-NM-203-AD.
(a) Effective Date
This AD becomes effective June 23, 2016.
(b) Affected ADs
This AD replaces AD 2014-20-01, Amendment 39-17974 (79 FR 59640, October 3, 2014) (``AD 2014-20-01'').
(c) Applicability
This AD applies to Bombardier, Inc. Model CL-600-2B16 (CL-601- 3A, CL-601-3R, and CL-604 Variants) airplanes, certificated in any category, serial numbers 5906, 5910, 5912, 5917, 5919 through 5932 inclusive, 5934, 5935, 5939, 5940, 5942, and 5948.
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
(e) Reason
This AD was prompted by a report of fuel leaks in the auxiliary power unit (APU) fuel boost pump canister connector cavity and in the right-hand landing lights compartment from the APU fuel boost pump electrical conduit connection, and by a determination that terminating action for the repetitive inspections is necessary. We are issuing this AD to detect and correct fuel leaks in the right- hand landing lights compartment, which, in combination with the heat generated by the taxi lights and landing lights on the ground reaching the auto-ignition temperature of the fuel, could result in ignition of any fuel or fumes present in the right-hand landing lights compartment.
(f) Compliance
Comply with this AD within the compliance times specified, unless already done.(g) Retained Repetitive Inspections for Fuel Leaks, With No Changes
This paragraph restates the requirements of paragraph (g) of AD 2014-20-01, with no changes. Within 25 flight hours after October 20, 2014 (the effective date of AD 2014-20-01): Do a general visual inspection for any fuel leak in the right-hand landing lights compartment, and do all applicable related investigative and corrective actions, in accordance with Part A of the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014, except as required by paragraph (h) of this AD. Do all applicable related investigative and corrective actions before further flight. Repeat the inspection thereafter at intervals not to exceed 8 flight hours until the replacement specified in paragraph (j) of this AD has been accomplished.
(h) Retained Corrective Action for Fuel Leak Found During Related Investigative Actions, With No Changes
This paragraph restates the requirements of paragraph (h) of AD 2014-20-01, with no changes. If any fuel leak is found during the related investigative actions required by paragraph (g) of this AD: Before further flight, do the terminating action specified in paragraph (j) of this AD, or do corrective actions using a method approved by the Manager, New York Aircraft Certification Office (ACO), ANE-170, FAA; or Transport Canada Civil Aviation (TCCA); or Bombardier, Inc.'s TCCA Design Approval Organization (DAO). If approved by the DAO, the approval must include the DAO-authorized signature.
(i) Retained Inspection of Connector Wiring With No Changes
This paragraph restates the requirements of paragraph (j) of AD 2014-20-01, with no changes. For airplanes having new connectors installed, as specified in Part B of the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, dated April 21, 2014: Within 6 months or 150 flight hours after October 20, 2014 (the effective date of AD 2014-20-01), whichever occurs first, do a detailed inspection for damage (cuts) of the connector wiring, in accordance with Part B of the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014. If any damage (cuts) is found on the wires, before further flight, replace the wire with a new wire identified in kit 605K28-008A, in accordance with the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014.
(j) New Requirement: Terminating Action--Replacement of Connector
Within 6 months, or 150 flight hours, whichever occurs first, after the effective date of this AD, replace the connector of the fuel boost pump canister of the APU and do all applicable related investigative actions, in accordance with Part B of the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014. Accomplishing this replacement terminates the repetitiveactions required by paragraph (g) of this AD, provided that the following actions are done, as applicable.
(1) If any damage (cuts) is found on the wires, before further flight, replace the wire with a new wire identified in kit 605K28- 008A, in accordance with the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014.
(2) If any damage is found on an O-ring, before further flight, replace the O-ring with a new O-ring, in accordance with the Accomplishment Instructions of Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014.
(3) If any fuel leak is found, before further flight, do corrective actions using a method approved by the Manager, New York ACO, ANE-170, FAA; or TCCA; or Bombardier,
[[Page 31500]]
Inc.'s TCCA DAO. If approved by the DAO, the approval must include the DAO-authorized signature.
(k) Retained Credit for Previous Actions, With Revised Paragraph Reference
This paragraph restates paragraph (k) of AD 2014-20-01, with a revised paragraph reference. This paragraph provides credit for actions required by paragraph (j) of this AD, if those actions were performed before October 20, 2014 (the effective date of AD 2014-20- 01), using Bombardier Alert Service Bulletin A605-28-008, Revision 01, dated May 28, 2014, which is not incorporated by reference in this AD.
(l) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, New York ACO, ANE-170, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the ACO, send it to ATTN: Program Manager, Continuing Operational Safety, FAA, New York ACO, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516-228- 7300; fax 516-794-5531. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/ certificate holding district office. The AMOC approval letter must specifically reference this AD.
(2) Contacting the Manufacturer: As of the effective date of this AD, for any requirement in this AD to obtain corrective actions from a manufacturer, the action must be accomplished using a method approved by the Manager, New York ACO, ANE-170, FAA; or TCCA; or Bombardier, Inc.'s TCCA DAO. If approved by the DAO, the approval must include the DAO-authorized signature.
(m) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information (MCAI) Canadian Emergency Airworthiness Directive CF-2014-21, dated July 10, 2014, for related information. This MCAI may be found in the AD docket on the Internet at http://www.regulations.gov by searching for andlocating Docket No. FAA-2015-3634.
(2) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (n)(4) and (n)(5) of this AD.
(n) Material Incorporated by Reference
(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR on October 20, 2014 (79 FR 59640, October 3, 2014).
(i) Bombardier Alert Service Bulletin A605-28-008, Revision 02, dated July 9, 2014.
(ii) Reserved.
(4) For service information identified in this AD, contact Bombardier, Inc., 400 C[ocirc]te-Vertu Road West, Dorval, Qu[eacute]bec H4S 1Y9, Canada; telephone 514-855-5000; fax 514-855- 7401; email thd.crj@aero.bombardier.com.
(5) You may view this service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221.
(6) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.