Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2016-09-13 The Boeing Company: Amendment 39-18511; Docket No. FAA- 2015-0246; Directorate Identifier 2014-NM-187-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective June 13, 2016. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\t(1) This AD applies to The Boeing Company Model 737-300, -400, and -500 series airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014. \n\t(2) Installation of Supplemental Type Certificate (STC) ST01219SE (http://rgl.faa.gov/Regulatory_and_Guidance_Library/ rgstc.nsf/0/ebd1cec7b301293e86257cb30045557a/$FILE/ST01219SE.pdf) does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST01219SE is installed, a ''change in product'' alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 53: Fuselage. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by reports of fatigue cracking found at the left-side and right-side upper frames, at station 360 between stringer 13 and stringer 14. We are issuing this AD to detect and correct fatigue cracking of the upper frame, which can grow in size and result in a severed frame, leading to rapid decompression and consequent reduced structural integrity of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Repetitive Inspections forCracking \n\n\n\tExcept as required by paragraphs (i)(2) and (i)(3) of this AD: At the applicable times specified in table 1 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, do a medium frequency eddy current (MFEC) inspection for cracking on the left-side and right-side of the upper frame at station 360 between stringer 13 and stringer 14, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014. If no cracking is found, repeat the inspections at the applicable times specified in table 1 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014. Accomplishment of the actions specified in paragraph (j) of this AD terminates the repetitive inspections required by this paragraph at the modified area only. The initial and repetitive inspections required by this paragraph may be terminated in the area under repairs installed prior to the effective date of this AD, provided they meet the requirements of paragraph (g)(1) or (g)(2) of this AD. \n\t(1) Repairs were installed to eliminate previously found cracking and were \n\n((Page 27992)) \n\napproved by the Boeing Organization Designation Authorization (ODA) with an FAA Form 8100-9. \n\t(2) Repairs were installed for damage other than cracking that have been re-evaluated and approved by the Boeing ODA with an FAA Form 8100-9 that includes an alternative method of compliance (AMOC) statement to paragraph (h) of this AD. \n\n(h) Repair \n\n\n\tIf any cracking is found during any inspection required by paragraph (g) of this AD: Before further flight, repair the cracking including doing an open hole high frequency eddy current (HFEC) inspection for cracking of the holes, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, except as required by paragraph (i)(1) of this AD. Repair ofany crack terminates the initial and repetitive inspection requirements of paragraph (g) of this AD for the repaired area only. If any cracking is found during any inspection required by this paragraph, before further flight, repair using a method approved in accordance with the procedures specified in paragraph (l) of this AD. \n\n(i) Exceptions to Service Information Specifications \n\n\n\t(1) Where Part 3 and Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, specifies contacting Boeing for repair instructions: Before further flight, repair using a method approved in accordance with the procedures specified in paragraph (l) of this AD. \n\t(2) Where Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, specifies a compliance time ''after the original issue date of this service bulletin,'' this AD requires compliance within the specified time after the effective date of this AD. \n\t(3) Where the Condition column oftable 1 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, specifies a reference point ''on the original issue date of this service bulletin,'' for this AD the corresponding reference point is on the effective date of this AD. \n\n(j) Optional Preventive Modification \n\n\n\tModification of an inspection area specified in paragraph (g) of this AD, including open hole and surface HFEC inspections for cracking of the area to be modified, in accordance with Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, except as required by paragraph (i)(1) of this AD, terminates the repetitive inspections required by paragraph (g) of this AD at the modified location only. \n\n(k) Post-Repair and Post-Modification Inspections \n\n\n\tTables 4 and 5 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, specify post-modification airworthinesslimitation inspections in compliance to 14 CFR 25.571(a)(3) at the modified locations, which support compliance with 14 CFR 121.1109(c)(2) or 129.109(b)(2). As airworthiness limitations, these inspections are required by maintenance and operational rules. It is therefore unnecessary to mandate them in this AD. Deviations from these inspections require FAA approval, but do not require an alternative method of compliance. \n\n(l) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Los Angeles Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (m) of this AD. Information may be emailed to: 9-ANM-LAACO-AMOC-REQUESTS@faa.gov.(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD if it is approved by Boeing Commercial Airplanes ODA that has been authorized by the Manager, Los Angeles ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\t(4) Except as required by paragraph (i)(1) of this AD: Where Part 2, Part 3, and Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014, contains steps that are labeled as RC, the provisions of paragraphs (l)(4)(i) and (l)(4)(ii) of this AD apply. \n\t(i) The steps labeled as RC, including substeps under an RC step and any figures identified in an RC step, must be done to comply with the AD. An AMOC is required for any deviations to RC steps, including substeps and identified figures. \n\t(ii) Steps not labeled as RC may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC, provided the RC steps, including substeps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. \n\n(m) Related Information \n\n\n\tFor more information about this AD, contact Galib Abumeri, Aerospace Engineer, Airframe Branch, ANM-120L, FAA, Los Angeles Aircraft Certification Office (ACO), 3960 Paramount Boulevard, Lakewood, California 90712-4137; phone: 562-627-5324; fax: 562-627- 5210; email: galib.abumeri@faa.gov. \n\n(n) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Boeing Alert Service Bulletin 737-53A1339, dated August 12, 2014. \n\t(ii) Reserved. \n\t(3) For Boeing service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(4) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.