Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2016-07-25 The Boeing Company: Amendment 39-18470; Docket No. FAA- 2015-2959; Directorate Identifier 2015-NM-008-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective May 18, 2016. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to The Boeing Company Model 787-8 airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin B787-81205-SB290015-00, Issue 002, dated November 25, 2014. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 29, Hydraulic Power. \n\n(e) Unsafe ConditionThis AD was prompted by reports indicating that the ram air turbine (RAT) assembly may fail to operate if deployed at low airspeeds. We are issuing this AD to prevent failure of the RAT assembly to operate at low air speeds. The volume fuse on the RAT assembly may be activated in-flight before the RAT is deployed. This may lead to improper pump hydraulic pressure offloading when the RAT is needed. Failure of the RAT to operate in an all engine out event would result in loss of control of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Replacement \n\n\n\tWithin 36 months after the effective date of this AD, replace the RAT pump and control module assembly or the RAT assembly, including an installation test and applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin B787-81205-SB290015-00, Issue 002, dated November 25, 2014. Do all applicable corrective actions before further flight. \n\n(h) Credit for Previous Actions \n\n\n\tThis paragraph provides credit for actions required by paragraph (g) of this AD, if those actions were performed before the effective date of this AD using Boeing Alert Service Bulletin B787-81205- SB290015-00, Issue 001, dated September 4, 2014, which is not incorporated by reference in this AD. \n\n(i) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (j)(1) of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair, modification, or alteration required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. To be approved, the repair method, modification deviation, or alteration deviation must meet the certification basis of the airplane and the approval must specifically refer to this AD. \n\t(4) For service information that contains steps that are labeled as Required for Compliance (RC), the provisions of paragraphs (i)(4)(i) and (i)(4)(ii) of this AD apply. \n\t(i) The steps labeled as RC, including substeps under an RC step and any figures identified in an RC step, must be done to comply with the AD. An AMOC isrequired for any deviations to RC steps, including substeps and identified figures. \n\t(ii) Steps not labeled as RC may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC, provided the RC steps, including substeps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. \n\n(j) Related Information \n\n\n\t(1) For more information about this AD, contact Sean J. Schauer, Aerospace Engineer, Systems and Equipment Branch, ANM 130S, FAA, Seattle ACO, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6479; fax: 425-917-6590; email: sean.schauer@faa.gov. \n\t(2) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (k)(3) and (k)(4) of this AD. \n\n(k) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Boeing Alert Service Bulletin B787-81205-SB290015-00, Issue 002, dated November 25, 2014. \n\t(ii) Reserved. \n\t(3) For Boeing service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(4) You may view this service information at FAA, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of thismaterial at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.