Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2016-07-03 The Boeing Company: Amendment 39-18448 ; Docket No. FAA- 2015-3983; Directorate Identifier 2015-NM-141-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective May 5, 2016. \n\n(b) Affected ADs \n\n\n\tThis AD affects AD 2005-20-29, Amendment 39-14326 (70 FR 59246, October 12, 2005). \n\n(c) Applicability \n\n\n\tThis AD applies to The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-300, 747SR, and 747SP series airplanes; certificated in any category; as identified in Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 53, Fuselage. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by an evaluation by the design approval holder (DAH) indicating that the upper chords of the upper deck floor beams are subject to widespread fatigue damage (WFD). We are issuing this AD to detect and correct fatigue cracking of the upper chords of the upper deck floor beams. Undetected cracking could result in large deflection or deformation of the upper deck floor beams, resulting in damage to wire bundles and control cables for the flight control system, and reduced controllability of the airplane. Multiple adjacent severed floor beams could result in rapid decompression of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Repetitive Inspections of the Upper Chords of the Upper Deck Floor Beams \n\n\n\tAt the applicable times specified in Tables 1 through 7 of paragraph1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012, except as required by paragraph (l)(1) of this AD: Do the inspections specified in paragraphs (g)(1) and (g)(2) of this AD, and do all applicable related investigative and corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747- 53A2452, Revision 1, dated July 16, 2012, except as required by paragraph (l)(2) of this AD. Repeat the inspections specified in paragraphs (g)(1) and (g)(2) of this AD thereafter at the applicable \n\n((Page 18459)) \n\ntimes specified in Tables 1 through 7 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. Do all applicable related investigative and corrective actions before further flight. Doing the inspections required by paragraphs (g)(1) and (g)(2) of this AD terminates the inspections required by paragraphs (m) and (n) of AD 2005-20-29, Amendment 39-14326 (70 FR 59246, October 12, 2005). \n\t(1) Do an open hole or surface high frequency eddy current (HFEC) inspection, as applicable, for cracks at the fastener holes of the floor panel attachment in the applicable areas and stations identified in Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. \n\t(2) Do a surface HFEC inspection for cracks in the upper and lower chords of the upper deck floor beams at permanent fastener locations in the applicable areas and stations identified in Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. \n\n(h) Terminating Modification and Repair for the Inspection Specified in Paragraph (g)(1) of This AD \n\n\n\tA fastener hole modification or a fastener hole repair in Area 1 or Area 2 as described in Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012, terminates the inspection of the fastener holes of the floor panel attachment required by paragraph (g)(1) of this AD forthe repaired or modified area only, provided the modification and repair, including related investigative and corrective actions, are done in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012, except as required by paragraph (l)(2) of this AD. \n\n(i) Post Modification/Repair Repetitive Inspections \n\n\n\t(1) For airplanes on which any fastener hole modification or any fastener hole repair was done as specified in Boeing Alert Service Bulletin 747-53A2452: Except as required by paragraph (i)(2) of this AD, at the applicable times specified in Tables 8 and 9 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012, or within 1,000 flight cycles after the effective date of this AD, whichever occurs later, do an open hole or surface HFEC inspection, as applicable, for cracks in the repaired and modified areas, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. If any cracking is found, before further flight, repair using a method approved in accordance with the procedures specified in paragraph (o) of this AD. Repeat the applicable inspections thereafter at the times specified in Tables 8 and 9 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. Doing an inspection required by this paragraph terminates the inspections required by paragraph (p) of AD 2005-20-29, Amendment 39-14326 (70 FR 59246, October 12, 2005). \n\t(2) For any repair #10 or repair #13 done as specified in Boeing Alert Service Bulletin 747-53A2452: Before further flight, do post- repair inspections using a method approved in accordance with the procedures specified in paragraph (o) of this AD. \n\n(j) Replacement of the Upper Chords of the Upper Deck Floor Beams (Includes Pre-Replacement Inspections) \n\n\n\tReplace the upper chords ofthe upper deck floor beams by doing the actions required by paragraphs (j)(1) and (j)(2) of this AD at the times specified in those paragraphs. Accomplishing the replacement required by this paragraph terminates the inspections required by paragraphs (g) and (i) of this AD. \n\t(1) Before the accumulation of 30,000 total flight cycles, or within 3,000 flight cycles after the effective date of this AD, whichever occurs later, do an open hole HFEC inspection for cracks at certain fastener locations in the floor beam webs and side of body frames, and do a detailed inspection for cracks of any removed part that will be re-installed, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012, except as required by paragraph (l)(2) of this AD. Do all applicable corrective actions before further flight. \n\t(2) Before further flight after accomplishing the inspections required by paragraph (j)(1)of this AD, install new upper chords of the upper deck floor beams and reinforcing straps or angles, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012, except as required by paragraph (l)(2) of this AD. \n\n(k) Post-Replacement Repetitive Inspections \n\n\n\tFor airplanes on which any replacement required by paragraph (j) or (k)(2)(ii) of this AD is done: At the applicable times specified in Tables 2 through 4 in paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012, do HFEC inspections for cracks at the permanent fastener holes and the upper chords of the upper deck floor beams, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747- 53A2452, Revision 1, dated July 16, 2012. \n\t(1) If any cracking is found during any inspection required by the introductory text of paragraph (k) or paragraph (k)(2)(i) of this AD, before further flight, repair using a method approved in accordance with the procedures specified in paragraph (o) of this AD. \n\t(2) If no cracking is found during any inspection required by the introductory text of paragraph (k) or paragraph (k)(2)(i) of this AD, do the actions required by paragraphs (k)(2)(i) and (k)(2)(ii) of this AD. \n\t(i) Repeat the inspections specified in paragraph (k) of this AD thereafter at the applicable times specified in Tables 8 and 9 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. \n\t(ii) Within 10,000 flight cycles after accomplishing the initial HFEC inspections required by the introductory text of paragraph (k) of this AD, replace the upper chords of the upper deck floor beams by doing the actions specified in paragraphs (j)(1) and (j)(2) of this AD. \n\n(l) Exceptions to Service Information \n\n\n\t(1) Where Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012, specifies a compliance time ''after the Revision 1 date of this service bulletin,'' this AD requires compliance within the specified compliance time after the effective date of this AD. \n\t(2) Where Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012; or Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012; specifies to contact Boeing for appropriate action: Before further flight, repair using a method approved in accordance with the procedures specified in paragraph (o) of this AD. \n\n(m) Credit for Previous Actions \n\n\n\tThis paragraph provides credit for the actions required by paragraphs (g), (h), and (i) of this AD, if those actions were performed before the effective date of this AD using Boeing Alert Service Bulletin 747-53A2452, dated April 3, 2003. For the actions required by paragraphs (g), (h), and (i) of this AD that are not identified in Boeing Alert Service Bulletin 747-53A2452, dated April 3, 2003, those actions must still be done. Boeing Alert Service Bulletin 747-53A2452, dated April 3, 2003, is incorporated by reference in AD 2005-20-29, Amendment 39-14326 (70 FR 59246, October 12, 2005). \n\n(n) Special Flight Permit \n\n\n\tSpecial flight permits, as described in Section 21.197 and Section 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199), are not allowed. \n\n(o) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (p) of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair, modification, or alteration required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. To be approved, the repair method, modification deviation, or alteration deviation must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\n((Page 18460)) \n\n(p) Related Information \n\n\n\t(1) For more information about this AD, contact Nathan Weigand, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6428; fax: 425-917-6590; email: nathan.p.weigand@faa.gov. \n\t(2) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (q)(3) and (q)(4) of this AD. \n\n(q) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Boeing Alert Service Bulletin 747-53A2452, Revision 1, dated July 16, 2012. \n\t(ii) Boeing Alert Service Bulletin 747-53A2852, dated June 22, 2012. \n\t(3) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544- 5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(4) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind AvenueSW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.