Adoption of the Amendment
Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0 1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
[[Page 16557]]
Sec. 39.13 [Amended]
0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD):
2015-06-06 BAE Systems (Operations) Limited: Amendment 39-18124. Docket No. FAA-2014-0619; Directorate Identifier 2014-NM-029-AD.
(a) Effective Date
This AD becomes effective May 4, 2015.
(b) Affected ADs
None.
(c) Applicability
This AD applies to BAE Systems (Operations) Limited Model 4101 airplanes, certificated in any category, all serial numbers.
(d) Subject
Air Transport Association (ATA) of America Code 24, Electrical Power.
(e) Reason
This AD was prompted by a report of the failure, due to overheat, of a bracket on which the earth post (EP) for the generator and propeller de-ice systems is located. We are issuing this AD to detect and correct an overheat failure of the EPs for the generator and propeller de-ice system and possible degradation of the wing front spar cap and/or web, which could affect the structural integrity of the wing.
(f) Compliance
Comply with this AD within the compliance times specified, unless already done.
(g) Inspection of the Earth Posts and Attachment Structure and Corrective Action
Within 6 months after the effective date of this AD: Do a general visual inspection on both engines of the structure around EP2 and EP4; the brackets on which the EPs are mounted; the attachment of the nacelle horizontal support for damage, and lateral movement of the EPs; in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. If any lateral movement of the EP or any other damage is detected, before further flight, repair using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the European Aviation Safety Agency (EASA); or BAE Systems (Operations) Limited's EASA Design Organization Approval (DOA).
(h) Inspection of the Earth Cables and Corrective Action
Within 6 months after the effective date of this AD: Do a general visual inspection of the earth cables of the generator and propeller de-ice system for arcing damage and signs that the cable insulation or terminal tags have been overheated, and do all applicable corrective actions; in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all applicable corrective actions before further flight.
(i) Torque Check of the Earth Post Stiff Nuts
Within 6 months after the effective date ofthis AD: Do a torque check of the EP2 and EP4 stiff nuts, and adjust the torque load as applicable, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24- 043, Revision 3, dated June 16, 2014.
(j) Resistance Measurement of the EP2 and EP4 Earth Bolts
Within 6 months after the effective date of this AD: Measure the resistance of the EP2 and EP4 earth bolts using a high-current millivolts-drop test, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all applicable corrective actions before further flight.
(k) No Reporting Required
Although BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014, specifies to submit information to the manufacturer, this AD does not require that this information be submitted.
(l) Credit for Previous Actions
This paragraph provides credit for actions required by paragraphs (g), (h), (i), and (j) of this AD, if those actions were performed before the effective date of this AD using a service bulletin specified in paragraph (l)(1), (l)(2), or (l)(3) of this AD, which are not incorporated by reference in this AD.
(1) BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, dated September 27, 2011.
(2) BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 1, dated January 16, 2012.
(3) BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 2, dated August 21, 2013.
(m) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the International Branch, send it to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-1175; fax 425-227-1149. Information may be emailed to: 9-ANM-116-AMOC-REQUESTS@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. The AMOC approval letter must specifically reference this AD.
(2) Contacting the Manufacturer: For any requirement in this AD to obtain corrective actions from a manufacturer, the action must be accomplished using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the European Aviation Safety Agency (EASA); or BAE Systems (Operations) Limited's EASA Design Organization Approval (DOA). If approved by the DOA, the approval must include the DOA-authorized signature.
(n) Related Information
(1) Refer to Mandatory Continuing Airworthiness Information (MCAI) European Aviation Safety Agency Airworthiness Directive 2014- 0006, dated January 7, 2014, for related information. This MCAI may be found in the AD docket on the Internet at http://www.regulations.gov/#!documentDetail;D=FAA-2014-0619-0002.
(2) Service information identified in this AD that is not incorporated by reference is available at the addresses specified in paragraphs (o)(3) and (o)(4) of this AD.
(o) Material Incorporated by Reference
(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do the actions required by this AD, unless this AD specifies otherwise.
(i) BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014.
(ii) Reserved.
(3) For service information identified in this AD, contact BAE Systems (Operations) Limited, Customer Information Department, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email RApublications@baesystems.com; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm.
(4) You may view this service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221.
(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.