AD 2014-11-01

Active

Electrical Power

Key Information
2014-11-01
Active
July 08, 2014
May 15, 2014
FAA-2013-0368
39-17851
Applicability
["Aircraft"]
["Large Airplane"]
The Boeing Company
777-200 Series 777-300 Series
Summary

We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 777-200 and -300 series airplanes. This AD was prompted by reports of smoke or flames in the passenger cabin of various transport category airplanes related to the wiring for the passenger cabin in-flight entertainment (IFE) system, cabin lighting, and passenger seats. This AD requires installing wiring and making changes to certain electrical load management system (ELMS) panels and other concurrent requirements to ensure the flightcrew is able to turn off electrical power to the IFE systems and other non-essential electrical systems through one or two switches in the flight deck in the event of smoke or flames. In the event of smoke or flames in the airplane flight deck or passenger cabin, the flightcrew's inability to turn off electrical power to the IFE system and other non-essential electrical systems could result in the inability to control smoke or flames in the airplane flight deckor passenger cabin during a non- normal or emergency situation, and consequent loss of control of the airplane.

Action Required

Final rule.

Regulatory Text

Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2014-11-01 The Boeing Company: Amendment 39-17851; Docket No. FAA- 2013-0368; Directorate Identifier 2012-NM-058-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective July 8, 2014. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to The Boeing Company Model 777-200 and -300 series airplanes, certificated in any category, as identified in Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 24, Electrical Power. \n\n((Page 31854)) \n\n(e)Unsafe Condition \n\n\n\tThis AD was prompted by reports of smoke or flames in the passenger cabin of various transport category airplanes related to the wiring for the passenger cabin in-flight entertainment (IFE) system, cabin lighting, and passenger seats. We are issuing this AD to ensure the flightcrew is able to turn off electrical power to the IFE systems and other non-essential electrical systems through one or two switches in the flight deck in the event of smoke or flames. In the event of smoke or flames in the airplane flight deck or passenger cabin, the flightcrew's inability to turn off electrical power to the IFE system and other non-essential electrical systems could result in the inability to control smoke or flames in the airplane flight deck or passenger cabin during a non-normal or emergency situation, and consequent loss of control of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Installation \n\n\n\tWithin 60 months after the effective date of this AD, install certain wiring and make changes to certain electrical load management system (ELMS) panels; as identified in, and in accordance with, the Accomplishment Instructions of Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014. Where the installation or change specifies installing a label, an operator's equivalent procedure to indelibly mark the applicable service bulletin number on the panel may be used. \n\n\n\tNote 1 to paragraph (g) of this AD: Additional guidance on procedures for indelibly marking the ELMS panel can be found in Boeing Process Specification BAC5307. \n\n(h) Concurrent Requirements \n\n\n\t(1) For airplanes identified in Boeing Service Bulletin 777-23- 0142, dated November 25, 2003: Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, change the hardware and software for the cabin services system, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-23-0142, dated November 25, 2003. \n\t(2) For all airplanes: Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, change the operational software (OPS) of the cabin management system, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-23-0175, Revision 2, dated October 12, 2006. \n\t(3) For Group 1, Configurations 1, 3, and 4 airplanes, identified in Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012: Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, install certain new electrical power control panels, as identified in, and in accordance with, the Accomplishment Instructions of Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012. \n\t(4) For Group 1, Configuration 2 airplanes, identified in Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012: Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, inspect the electrical power control panel for a certain part number and change the part number, as applicable; as identified in, and in accordance with, the Accomplishment Instructions of Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012. \n\t(5) For all airplanes: Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, change the ELMS OPS and configuration database software (OPC) at the data loader, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-24-0087, Revision 2, dated August 16, 2007; or Boeing Service Bulletin 777-28A0039, Revision 2, dated September 20, 2010. \n\n(i) Credit for Previous Actions \n\n\n\t(1) This paragraph provides credit for the actions required by paragraph (g) of this AD, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 777-24-0075, dated August 21, 2003; or Revision 1,dated December 11, 2003, provided that Smiths Service Bulletin 5000ELM-24-379 identified on pages 8 and 19 of Boeing Service Bulletin 777-24-0075, Revision 1, dated December 11, 2003, is not used. These documents are not incorporated by reference in this AD. \n\t(2) This paragraph provides credit for the actions required by paragraph (g) of this AD, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 777-24-0075, Revision 2, dated October 5, 2006; or Revision 3, dated August 26, 2010. These documents are not incorporated by reference in this AD. \n\t(3) This paragraph provides credit for the actions required by paragraph (h)(2) of this AD, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 777-23- 0175, dated July 11, 2002; or Revision 1, dated July 17, 2003; provided that overhead electronics unit hardware, part number 285W0029-5, is not installed. These documents are not incorporated by reference in this AD. \n\t(4) This paragraph provides credit for the actions required by paragraphs (h)(3) and (h)(4) of this AD, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 777-24-0074, dated June 27, 2002; Revision 1, dated October 5, 2006; Revision 2, dated May 20, 2010; or Revision 3, dated February 20, 2012; provided all applicable concurrent requirements identified in Section 1.B. of Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012, have been done prior to or concurrently with that revision; and provided that any additional work identified by the phrase ''More work is necessary'' in section 1.D. of Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012, is accomplished before the effective date of this AD. These documents are not incorporated by reference in this AD. \n\t(5) This paragraph provides credit for the actions required by paragraph (h)(5) of this AD, if those actions were performed before the effective date of this AD using Boeing Service Bulletin 777-24- 0087, dated July 24, 2003, or Revision 1, dated December 18, 2003; or Boeing Service Bulletin 777-28A0039, dated June 13, 2008, or Revision 1, dated January 8, 2009. These documents are not incorporated by reference in this AD. \n\n(j) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in the Related Information section of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane and the approval must specifically refer to this AD. \n\n(k) Related Information \n\n\n\t(1) For more information about this AD, contact Ray Mei, Aerospace Engineer, Systems and Equipment Branch, ANM-130S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6467; fax: 425-917-6590; email: raymont.mei@faa.gov. \n\t(2) For service information identified in this AD that is not incorporated by reference in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. You may view this referenced service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\n(l) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Boeing Service Bulletin 777-23-0142, dated November 25, 2003. \n\t(ii) Boeing Service Bulletin 777-23-0175, Revision 2, dated October 12, 2006. \n\t(iii) Boeing Service Bulletin 777-24-0074, Revision 4, dated September 13, 2012. \n\n((Page 31855)) \n\n\n\t(iv) Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014. \n\t(v) Boeing Service Bulletin 777-24-0087, Revision 2, dated August 16, 2007. \n\t(vi) Boeing Service Bulletin 777-28A0039, Revision 2, dated September 20, 2010. \n\t(3) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544- 5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(4) You may view this referenced service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

Supplementary Information

Discussion \n\n\n\tWe issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain The Boeing Company Model 777-200 and -300 series airplanes. The NPRM was prompted by reports of smoke or flames in the passenger cabin of various transport category airplanes related to the wiring for the passenger cabin IFE system, cabin lighting, and passenger seats. The NPRM published in the Federal Register on May 10, 2013 (78 FR 27310). The NPRM proposed to require installing wiring and making changes to certain ELMS panels and other concurrent requirements. We are issuing this AD to ensure the flightcrew is able to turn off electrical power to the IFE systems and other non-essential electrical systems through one or two switches in the flight deck in the event of smoke or flames. In the event of smoke or flames in the airplane flight deck or passenger cabin, the flightcrew's inability to turn off electrical power tothe IFE system and other non-essential electrical systems could result in the inability to control smoke or flames in the airplane flight deck or passenger cabin during a non-normal or emergency situation, and consequent loss of control of the airplane. \n\nComments \n\n\n\tWe gave the public the opportunity to participate in developing this AD. The following presents the comments received on the proposal (78 FR 27310, May 10, 2013) and the FAA's response to each comment. United Airlines and Air Line Pilots Association International (ALPA) supported the NPRM. \n\nRequest To Include Additional Work-Hours in Costs of Compliance \n\n\n\tAmerican Airlines (AA) requested that we add 200 work-hours to the total labor costs specified in the Costs of Compliance section of the NPRM (78 FR 27310, May 10, 2013). AA stated that the costs of compliance specified in the NPRM include the work-hours specified in Boeing Service Bulletin 777-24-0075, Revision 3, dated August 26, 2010, but those work-hoursdo not take into account the work-hours for making changes to certain ELMS panels specified in the concurrent service bulletins. \n\tWe acknowledge that we underestimated the work-hours for completing the installation of wiring and changing the ELMS panel wiring in the NPRM (78 FR 27310, May 10, 2013). We have added 200 work-hours to the Costs of Compliance of this final rule to account for the work-hours for making changes to certain ELMS panels. \n\nRequest To Allow Use of Later Revisions of ELMS Service Information \n\n\n\tAA requested that we allow use of later revisions of certain ELMS service information instead of Boeing Service Bulletin 777-24-0075, Revision 3, dated August 26, 2010. AA stated that revised ELMS service information has been released since publication of Boeing Service Bulletin 777-24-0075, Revision 3, dated August 26, 2010. \n\tWe do not agree. Allowing a reference to ''a later revision'' of a specific service document violates Office of the Federal Register policies for approving materials incorporated by reference. \n\tHowever, we have reviewed Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014, which contains the appropriate service information. Operators may request approval of an alternative method of compliance (AMOC) under the provisions of paragraph (j) of this final rule to use later revisions of the ELMS service information. We have revised paragraph (g) of this AD to refer to Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014, as the appropriate source of service information. We have given credit for Boeing Service Bulletin 777-24-0075, Revision 3, dated August 26, 2010, in paragraph (i)(2) of this AD. \n\nRequest To Use Equivalent Procedure \n\n\n\tAA requested that we allow the use of an operator's equivalent procedure to mark the applicable service bulletin number on the panel, rather than using the labels in the General Electric (GE) kits as specified. AA stated that Boeing Service Bulletin 777-24-0075, Revision 3, dated August 26, 2010, specifies installing a label of the service bulletin number on the ELMS power panels. AA stated that the labels that are in the GE kits have a shelf life that expires prior to the compliance time of 60 months. \n\tWe agree that an operator's equivalent procedure may safely and effectively be used to indelibly mark the applicable service bulletin number on the panels in place of the labels. We have revised paragraph (g) of this final rule accordingly. We have also added Note 1 to paragraph (g) of this AD to specify that additional guidance on indelibly marking the panel can be found in Boeing Process Specification BAC5307. \n\nRequest To Allow Various Modifications to Repair Kits \n\n\n\tJapan Air Lines (JAL) requested that we allow certain modifications of the repair kits, which JAL has proposed to Boeing and Smiths Aerospace Actuation Systems to address problems with the Smiths Aerospace Actuation Systems repair kits. JAL stated that problems with the repair kits include a certain electrical wire being too short, omission of certain other wires, inclusion of unshielded wires rather than shielded wires, inability to install a certain relay bracket, and inclusion of an incorrect relay part number. \n\tWe disagree with the request to allow modifications of repair kits in this final rule. Boeing Service Bulletin 777-24-0075, Revision 4, dated January 8, 2014, is the latest service information available for compliance with the actions specified in paragraph (g) of this final rule. We do not consider it appropriate to include various provisions in an AD applicable only to individual airplanes or to a single operator's configuration or use of an airplane. However, any person may request approval of an alternative method of compliance (AMOC) under the provisions of paragraph (j) of this final rule. No change has been made to this final rule in this regard. \n\nRequests To Add Alternative ELMS Software \n\n\n\tBoeing requested thatwe add alternative ELMS software to the NPRM (78 FR 27310, May 10, 2013). Boeing and JAL pointed out that new ELMS software is required in order to be compliant with the requirements of AD 2011-09-15, Amendment 39-16677 (76 FR 24345, May 2, 2011). Boeing and JAL stated that AD 2011-09-15 requires, among other actions, installing new ELMS software. Note 2 of AD 2011-09-15 specifies that Boeing Service Bulletin 777-28A0039, Revision 2, dated September 20, 2010, is an additional source of guidance for installing the new ELMS software. Boeing and JAL stated that, if ELMS software is required to be installed in accordance with Boeing Service Bulletin 777-24-0087, Revision 2, dated August 16, 2007, as proposed in the NPRM, a conflict with the requirements of AD 2011-09-15 will be created. \n\tWe agree to allow the option of installing ELMS software using Boeing Service Bulletin 777-28A0039, dated June 13, 2008; Revision 1, dated January 8, 2009; or Revision 2, dated September 20, 2010. We have revised paragraph \n\n((Page 31853)) \n\n(h)(5) of this final rule to add a reference to Boeing Service Bulletin 777-28A0039, Revision 2, dated September 20, 2010. We have also revised paragraph (i)(5) of this final rule to provide credit for ELMS software installations done before the effective date of this AD using Boeing Service Bulletin 777-28A0039, dated June 13, 2008; or Revision 1, dated January 8, 2009. \n\nConclusion \n\n\n\tWe reviewed the relevant data, considered the comments received, and determined that air safety and the public interest require adopting this AD with the changes described previously and minor editorial changes. We have determined that these minor changes: \n\tAre consistent with the intent that was proposed in the NPRM (78 FR 27310, May 10, 2013) for correcting the unsafe condition; and \n\tDo not add any additional burden upon the public than was already proposed in the NPRM (78 FR 27310, May 10, 2013). \n\tWe also determined that these changes will not increase the economic burden on any operator or increase the scope of this AD. \n\nCosts of Compliance \n\n\n\tWe estimate that this AD affects 59 airplanes of U.S. registry. \n\tWe estimate the following costs to comply with this AD: \n\n\n\tEstimated Costs ---------------------------------------------------------------------------------------------------------------- \n\tCost per Cost on U.S. \n\tAction Labor cost Parts cost product operators ---------------------------------------------------------------------------------------------------------------- Wiring changes...................... 236 work-hours x $85 per $2,503 $22,563 $1,331,217 \n\thour = $20,060. Concurrent ELMS software 3 work-hours x $85 per 0 255 15,045 \n\tinstallation (Boeing Service hour = $255. \n\tBulletin 777-24-0087, Revision 2, \n\tdated August 16, 2007; or 777- \n\t28A0039, Revision2, dated \n\tSeptember 20, 2010). Concurrent operational program 4 work-hours x $85 per 0 340 20,060 \n\tsoftware change (Boeing Service hour = $340. \n\tBulletin 777-23-0175, Revision 2, \n\tdated October 12, 2006). Concurrent power isolation switch 5 work-hours x $85 per 751 1,176 69,384 \n\tinstallation (Boeing Service hour = $425. \n\tBulletin 777-24-0074, Revision 4, \n\tdated September 13, 2012). Concurrent cabin services system 10 work-hours x $85 per 119,959 120,809 0 \n\thardware and software change (No hour = $850. \n\taffected U.S. operators; Boeing \n\tService Bulletin 777-23-0142, dated \n\tNovember 25, 2003). ---------------------------------------------------------------------------------------------------------------- \n\nAuthority for This Rulemaking \n\n\n\tTitle 49 of the United States Code specifies the FAA's authority to issue rules onaviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority. \n\tWe are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: ''General requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action. \n\nRegulatory Findings \n\n\n\tThis AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. \n\tFor the reasons discussed above, I certify that this AD: \n\t(1) Is not a ''significant regulatory action'' under Executive Order 12866, \n\t(2) Is not a ''significant rule'' under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979), \n\t(3) Will not affect intrastate aviation in Alaska, and \n\t(4) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. \n\nList of Subjects in 14 CFR Part 39 \n\n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
Contact Information

Ray Mei, Aerospace Engineer, Systems and Equipment Branch, ANM-130S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917- 6467; fax: 425-917-6590; email: raymont.mei@faa.gov.

References
(Federal Register Volume 79, Number 106 (Tuesday, June 3, 2014))
--- - Part 39
(Pages 31851-31855)
FAA Documents