Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2014-05-22 The Boeing Company: Amendment 39-17795; Docket No. FAA- 2013-0977; Directorate Identifier 2013-NM-190-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective April 15, 2014. \n\n(b) Affected ADs \n\n\n\tNone. \n\n(c) Applicability \n\n\n\tThis AD applies to all The Boeing Company Model 717-200 airplanes, certificated in any category. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 53, Fuselage. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by multiple reports of cracking in the overwing frames. We are issuing this AD to detect and correct such cracking, which could result in a severed frame and might increase the loading of adjacent frames, resulting in damage to the adjacent structure and consequent loss of structural integrity of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Inspections and Corrective Actions \n\n\n\tAt the applicable time specified in paragraph (g)(1) or (g)(2) of this AD, do a general visual inspection and a high frequency eddy current (HFEC) inspection for cracking of the left-side and right- side overwing frames at station 737, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013, except as required by paragraph (h)(3) of this AD. Do all applicable corrective actions before further flight. Except as required by paragraph (h)(2) of this AD, repeat the inspections thereafter at the applicabletime specified in paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013. \n\t(1) For Group 1, Configuration 1 airplanes identified in Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013: At the time specified in table 1 of paragraph 1.E., ''Compliance,'' of Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013, except as provided by paragraph (h)(1) of this AD. \n\t(2) For Group 1, Configuration 2 airplanes identified in Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013: At the applicable time specified in paragraph (g)(2)(i) or (g)(2)(ii) of this AD. \n\t(i) For airplanes on which the overwing frame has not been replaced: Within 9,300 flight cycles after the inspections specified in Boeing Multi Operator Message (MOM) MOM-MOM-13-0375-01B, dated May 9, 2013, were accomplished. \n\t(ii) For airplanes on which the overwing frame has been replaced: Within 12,000 flight cycles after replacing the frame. \n\n(h) Exceptions to Service Information Specifications \n\n\n\t(1) Where Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013, specifies a compliance time ''after the original issue date of this service bulletin,'' this AD requires compliance within the specified compliance time after the effective date of this AD. \n\t(2) Where Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013, specifies to contact Boeing for the compliance time of an inspection repetitive interval, this AD requires a compliance time approved by the FAA in accordance with the procedures specified in paragraph (j) of this AD. \n\t(3) Where Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013, specifies to contact Boeing for repair instructions, this AD requires repair before further flight using a method approved in accordance with the procedures specified in paragraph (j) of this AD. \n\n(i) Credit for Previous Actions \n\n\n\tThis paragraph provides credit for only the initial general visual inspection, HFEC inspection, and frame replacement required by paragraph (g) of this AD, if those actions were performed before the effective date of this AD using Boeing Multi Operator Message MOM-MOM-13-0375-01B, dated May 9, 2013, which is not incorporated by reference in this AD. \n\n(j) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Los Angeles Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (k) of this AD. Information may be emailed to: 9-ANM-LAACO-AMOC-REQUESTS@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Los Angeles ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane and 14 CFR 25.571, Amendment 45, and the approval must specifically refer to this AD. \n\t(4) If the service information contains steps that are labeled as RC (Required for Compliance), those steps must be done to comply with this AD; any steps that are not labeled as RC are recommended. Those steps that are not labeled as RC may be deviated from, done as part of other actions, or done using accepted methods different from those identified in the specified service information without obtaining approval of an AMOC, provided the stepslabeled as RC can be done and the airplane can be put back in a serviceable condition. Any substitutions or changes to steps labeled as RC require approval of an AMOC. \n\n(k) Related Information \n\n\n\t(1) For more information about this AD, contact: Eric Schrieber, Aerospace Engineer, Airframe Branch, ANM-120L, Los Angeles ACO, FAA, 3960 Paramount Boulevard, Lakewood, CA 90712-4137; phone: 562-627- 5348; fax: 562-627-5210; email: eric.schrieber@faa.gov. \n\t(2) Service information identified in this AD that is not incorporated by reference may be obtained at the addresses specified in paragraphs (l)(3) and (l)(4) of this AD. \n\n(l) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise.((Page 13533)) \n\n\n\t(i) Boeing Alert Service Bulletin 717-53A0036, dated August 12, 2013. \n\t(ii) Reserved. \n\t(3) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, 3855 Lakewood Boulevard, MC D800-0019, Long Beach, CA 90846-0001; telephone 206-544-5000, extension 2; fax 206-766-5683; Internet https://www.myboeingfleet.com. \n\t(4) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.