Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n0 2. The FAA amends Sec. 39.13 by adding the following new airworthiness directive (AD): \n\n2013-25-05 The Boeing Company: Amendment 39-17701; Docket No. FAA- 2013-0421; Directorate Identifier 2013-NM-003-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective January 31, 2014. \n\n(b) Affected ADs \n\n\n\tCertain requirements of this AD terminate certain requirements of AD 2011-12-09, Amendment 39-16716 (76 FR 33988, June 10, 2011). \n\n(c) Applicability \n\n\n\tThis AD applies to The Boeing Company Model 737-300, -400, and - 500 series airplanes; certificated in any category; identified as Groups 5, 6, 7, and 9 in Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012. \n\n(d) Subject \n\n\n\tJoint Aircraft System Component (JASC)/Air Transport Association (ATA) of America Code 2822, Fuel boost pump. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent damage to the fuel pumps caused by electrical arcing that could introduce an ignition source in the fuel tank, which, in combination with flammable fuel vapors, could result in a fuel tank explosion and consequent loss of the airplane. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n(g) Installation of Ground Studs and Bonding Jumper and Fuel Boost Pump Relays Replacement \n\n\n\tFor airplanes in Groups 5, 6, 7, and 9, Configuration 1, as identified in Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012 (airplanes on which Boeing Alert Service Bulletin 737-28A1212 was not done): Within60 months after the effective date of this AD, install ground studs and a bonding jumper, replace fuel boost pump relays, and do certain bonding resistance measurements, in accordance with Part 1 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737- 28A1212, Revision 2, dated October 18, 2012. Doing the actions required by this paragraph terminates the requirements of paragraph (g) of AD 2011-12-09, Amendment 39-16716 (76 FR 33988, June 10, 2011), for airplanes in Groups 5, 6, 7, and 9, Configuration 1 only, provided that the requirements of paragraph (g) of this AD are done at the time given in AD 2011-12-09. \n\n(h) Ground Studs and Bonding Jumper Installation and GFI Relay Position Change \n\n\n\tFor airplanes in Groups 5, 6, 7, and 9, Configuration 2, as identified in Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012 (airplanes on which Boeing Alert Service Bulletin 737-28A1212, dated July 23, 2009 was done): Within 60 months after theeffective date of this AD, install ground studs and a bonding jumper, change the GFI relay position, and do certain bonding resistance measurements, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737- 28A1212, Revision 2, dated October 18, 2012. Doing the actions required by this paragraph terminates the requirements of paragraph (h) of AD 2011-12-09, Amendment 39-16716 (76 FR 33988, \n\n((Page 78703)) \n\nJune 10, 2011), for airplanes in Groups 5, 6, 7, and 9, Configuration 2 only, provided that the requirements of paragraph (h) of this AD are done at the time given in AD 2011-12-09. \n\n(i) Ground Fault Interrupt (GFI) Relay Position Change \n\n\n\tFor airplanes in Groups 5, 6, 7, and 9, Configuration 3, as identified in Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012 (certain airplanes on which Boeing Alert Service Bulletin 737-28A1212, Revision 1, dated August 27, 2010 was done): Within 60 months after theeffective date of this AD, change the GFI relay position and do certain bonding resistance measurements, in accordance with Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012. \n\n(j) Maintenance Program Revision \n\n\n\tConcurrently with accomplishing the actions required by paragraph (g), (h), or (i) of this AD, or within 30 days after the effective date of this AD, whichever occurs later: Revise the maintenance program by incorporating Airworthiness Limitation 28- AWL-22 of Boeing 737-100/200/200C/300/400/500 AWL and Certification Maintenance Requirements (CMRs), Document D6-38278-CMR, Revision August 2012. The initial compliance time for the actions specified in AWL 28-AWL-22 of Boeing 737-100/200/200C/300/400/500 AWL and Certification Maintenance Requirements (CMRs), Document D6-38278- CMR, Revision August 2012, is within 1 year after accomplishing the installation required by paragraph (g), (h), or (i) of thisAD, or within 1 year after the effective date of this AD, whichever occurs later. \n\n(k) No Alternative Actions, Intervals, and/or Critical Design Configuration Control Limitations (CDCCLs) \n\n\n\tAfter accomplishing the revision required by paragraph (j) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (l) of this AD. \n\n(l) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (m) of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\n(m) Related Information \n\n\n\tFor more information about this AD, contact Georgios Roussos, Aerospace Engineer, Systems and Equipment Branch, ANM-130S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6482; fax: 425-917-6590; email: georgios.roussos@faa.gov. \n\n(n) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(i) Boeing Alert Service Bulletin 737-28A1212, Revision 2, dated October 18, 2012. \n\t(ii) Airworthiness Limitation 28-AWL-22 of Boeing 737-100/200/ 200C/300/400/500 AWL and Certification Maintenance Requirements (CMRs), Document D6-38278-CMR, Revision August 2012. Page 1.0-33, where Airworthiness Limitation 28-AWL-22 is listed, is dated May 2009. \n\t(3) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544- 5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(4) You may view this service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material at the FAA, call 425-227-1221. \n\t(5) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this materialat NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.