Adoption of the Amendment \n\n\n\tAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR Part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n0 1. The authority citation for part 39 continues to read as follows: \n\n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\n\n\nSec. 39.13 (Amended) \n\n\n\n0 2. The FAA amends Sec. 39.13 by removing Airworthiness Directive (AD) 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007), and adding the following new AD: \n\n2013-24-15 The Boeing Company: Amendment 39-17692; Docket No. FAA- 2012-1069; Directorate Identifier 2012-NM-044-AD. \n\n(a) Effective Date \n\n\n\tThis AD is effective January 8, 2014. \n\n(b) Affected ADs \n\n\n\tThis AD supersedes AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). \n\n(c) Applicability \n\n\n\t(1) This AD applies to all The Boeing Company Model 727, 727C, 727-100, 727-100C, 727-200, and 727-200F series airplanes, certificated in any category. \n\t(2)This AD requires revisions to certain operator maintenance documents to include new actions (e.g., inspections) and/or Critical Design Configuration Control Limitations (CDCCLs). Compliance with these actions and/or CDCCLs is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by this AD, the operator may not be able to accomplish the actions described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (p) of this AD. The request should include a description of changes to the required actions that will ensure the continued operational safety of the airplane. \n\n(d) Subject \n\n\n\tAir Transport Association (ATA) of America Code 28, Fuel. \n\n(e) Unsafe Condition \n\n\n\tThis AD was prompted by a report of damage found to the sleeve, jacket, and insulation on an electrical wire during a repetitive inspection. We are issuing this AD to prevent chafing of the fuel boost pump electrical wiring and leakage of fuel into the conduit, and to prevent electrical arcing between the wiring and the surrounding conduit, which could result in arc-through of the conduit, and consequent fire or explosion of the fuel tank. \n\n(f) Compliance \n\n\n\tComply with this AD within the compliance times specified, unless already done. \n\n((Page 72793)) \n\n(g) Retained Compliance Times \n\n\n\tThis paragraph restates the requirements of paragraphs (f), (g), and (h) of AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). \n\t(1) For airplanes with 50,000 or more total flight hours as of June 28, 1999 (the effective date of AD 99-12-52, Amendment 39-11199 (64 FR 33394, June 23, 1999)): Within 20 days after June 28, 1999, accomplish the requirements of paragraph (h) of this AD. \n\t(2) For airplanes with less than 50,000 total flight hours, but more than 30,000 total flight hours, as of June 28, 1999 (the effective date of AD 99-12-52, Amendment 39-11199 (64 FR 33394, June 23, 1999)): Within 30 days after June 28, 1999, accomplish the requirements of paragraph (h) of this AD. \n\t(3) For airplanes with 30,000 total flight hours or less as of June 28, 1999 (the effective date of AD 99-12-52, Amendment 39-11199 (64 FR 33394, June 23, 1999)): Within 90 days after June 28, 1999, accomplish the requirements of paragraph (h) of this AD. \n\n(h) Retained Detailed Inspection, Corrective Action, and Installation \n\n\n\tThis paragraph restates the requirements of paragraph (i) of AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). \n\t(1) Perform a detailed inspection of the in-tank fuel boost pump wire bundles, and applicable corrective actions; and, except as provided by paragraph (i) of this AD, install sleeving over the wire bundles; in accordance with Boeing Alert Service Bulletin 727- 28A0126, dated May 24, 1999; Boeing Service Bulletin 727-28A0126, Revision 1, dated May 18, 2000; or Boeing Alert Service Bulletin 727-28A0132, dated February 22, 2007. \n\t(2) For the purposes of this AD, a detailed inspection is: An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required. \n\n(i) Retained Installation: Possible Deferral \n\n\n\tThis paragraph restates the optional actions of paragraph (j) of AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). Installation of sleeving over the wire bundles, as required by paragraph (h) of this AD, may be deferred if, within 18 months or 6,000 flight hours, whichever occurs first, after accomplishment of the inspection and applicable corrective actions required by paragraph (h) of this AD, the following actions are accomplished: Perform a detailed inspection of the in-tank fuel boost pump wire bundles, and applicable corrective actions; and install sleeving over the wire bundles; in accordance with Boeing Alert Service Bulletin 727-28A0126, dated May 24, 1999; Boeing Service Bulletin 727-28A0126, Revision 1, dated May 18, 2000; or Boeing Alert Service Bulletin 727-28A0132, dated February 22, 2007. \n\n(j) Retained Repetitive Inspections and Corrective Actions \n\n\n\tThis paragraph restates the requirements of paragraph (k) of AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). Repeat the detailed inspection and applicable corrective actions required by paragraphs (h) and (i) of this AD, as applicable, at intervals not to exceed 30,000 flight hours, until the initial inspection, applicable corrective actions, and engine fuel suction feed operational test required by paragraph (k) of this AD have been done. \n\n(k) Retained Inspection, Test, and Related Investigative and Corrective ActionsThis paragraph restates the requirements of paragraph (l) of AD 2007-11-08, Amendment 39-15065 (72 FR 28594, May 22, 2007). For all airplanes: Within 120 days after June 6, 2007 (the effective date of AD 2007-11-08), or 5,000 flight hours after the last inspection or corrective action done before June 6, 2007, as required by paragraph (h), (i), or (j), as applicable, of this AD, whichever occurs later, do a detailed inspection for damage of the sleeve and electrical wire of the fuel boost pump, and do an engine fuel suction feed operational test; and, before further flight, do related investigative and corrective actions, as applicable; by doing all applicable actions in and in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 727-28A0132, dated February 22, 2007. Repeat the detailed inspection and engine fuel suction feed operational test thereafter at intervals not to exceed 15,000 flight cycles. Accomplishment of the initial inspection, applicable corrective actions, and engine fuel suction feed operational test of this paragraph terminates the requirements of paragraphs (h), (i), and (j) of this AD. \n\n(l) New Installation \n\n\n\tWithin 60 months after the effective date of this AD: Install new shielded wire bundles in convoluted liners in the wing and center fuel tank conduits and do all applicable related investigative and corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 727- 28A0133, dated October 5, 2011. Related investigative and corrective actions must be done before further flight. Doing the actions specified in paragraphs (l) and (m) of this AD terminates the requirements of paragraphs (g), (h), (i), (j), and (k) of this AD. \n\n(m) New Concurrent Requirement \n\n\n\tBefore or concurrently with accomplishing the requirements of paragraph (l) of this AD, replace the fuel quantity indicating system (FQIS) wire bundles and do a low frequency eddy current inspectionfor cracking, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 727-28-0131, dated August 18, 2010. If any cracking is found during the inspection, before further flight, repair using a method approved in accordance with the procedures specified in paragraph (p) of this AD. \n\n(n) New Maintenance Program Revision \n\n\n\t(1) Within 60 days after the effective date of this AD: Revise the maintenance program to incorporate Airworthiness Limitation Instruction (ALI) Task 28-AWL-18, ''Fuel Quantity Indicating System (FQIS)--Out-Tank Wiring Lightning Shield to Ground Termination''; and CDCCL Task 28-AWL-19, ''Fuel Quantity Indicating System (FQIS)-- Out-Tank Wiring Lightning Shield to Ground Termination,'' of Section D., ''Airworthiness Limitations--Fuel Systems,'' of Boeing 727-100/ 200 Airworthiness Limitations (AWLs), D6-8766-AWL, Revision August 2010. The initial compliance time for the inspections is within 120 months after accomplishing the actions required by paragraph (m) of this AD. \n\t(2) Within 60 days after the effective date of this AD: Revise the maintenance program to incorporate Airworthiness Limitation Instruction (ALI) Task 28-AWL-20, ''Fuel Boost Pump Wires in Conduit Installation--In Fuel Tank''; and CDCCL Task 28-AWL-21, ''Fuel Boost Pump Wires in Conduit Installation--In Fuel Tank,'' of Section D., ''Airworthiness Limitations--Fuel Systems,'' of Boeing 727-100/200 Airworthiness Limitations (AWLs), D6-8766-AWL, Revision August 2010. The initial compliance time for the inspections is within 72 months after accomplishing the actions required by paragraph (l) of this AD. \n\n(o) No Alternative Actions, Intervals, and/or CDCCLs \n\n\n\tAfter accomplishing the revisions required by paragraphs (n)(1) and (n)(2) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used unless the actions, intervals, and/or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (p) of this AD. \n\n(p) Alternative Methods of Compliance (AMOCs) \n\n\n\t(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the ACO, send it to the attention of the person identified in paragraph (q) of this AD. Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. \n\t(2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD if it is approved by the Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\t(4) AMOCs approved previously for AD 2007-11-08, Amendment 39- 15065 (72 FR 28594, May 22, 2007), are approved as AMOCs for the corresponding provisions of this AD. \n\n((Page 72794)) \n\n(q) Related Information \n\n\n\tFor more information about this AD, contact Rebel Nichols, Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6509; fax: 425-917-6590; email: rebel.nichols@faa.gov. \n\n(r) Material Incorporated by Reference \n\n\n\t(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the service information listed in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51. \n\t(2) You must use this service information as applicable to do the actions required by this AD, unless the AD specifies otherwise. \n\t(3) The following service information was approved for IBR on January 8, 2014. \n\t(i) Boeing Alert Service Bulletin 727-28A0133, dated October 5, 2011. \n\t(ii) Boeing Service Bulletin 727-28-0131, dated August 18, 2010. \n\t(iii) Boeing 727-100/200 Airworthiness Limitations (AWLs), D6- 8766-AWL, Revision August 2010: \n\t(A) Airworthiness Limitation Instruction (ALI) Task 28-AWL-18, ''Fuel Quantity Indicating System (FQIS)--Out-Tank Wiring Lightning Shield to Ground Termination,'' of Section D., ''Airworthiness Limitations--Fuel Systems.'' \n\t(B) Critical Design Configuration Control Limitations (CDCCL) Task 28-AWL-19, ''Fuel Quantity Indicating System (FQIS)--Out-Tank Wiring Lightning Shield to Ground Termination,'' of Section D., ''Airworthiness Limitations--Fuel Systems.'' \n\t(C) ALI Task 28-AWL-20, ''Fuel Boost Pump Wires in Conduit Installation--In Fuel Tank,'' of Section D., ''Airworthiness Limitations--Fuel Systems.'' \n\t(D) CDCCL Task 28-AWL-21, ''Fuel Boost Pump Wires in Conduit Installation--In Fuel Tank,'' of Section D., ''Airworthiness Limitations--Fuel Systems.'' \n\t(4) The following service information was approved for IBR on June 6, 2007 (72 FR 28594, May 22, 2007). \n\t(i) Boeing Alert Service Bulletin 727-28A0126, dated May 24, 1999. \n\t(ii) Boeing Alert Service Bulletin 727-28A0132, dated February 22, 2007. \n\t(iii) Boeing Service Bulletin 727-28A0126, Revision 1, dated May 18, 2000. \n\t(5) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544- 5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. \n\t(6) You may view this service information at FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For information on the availability of this material atthe FAA, call 425-227-1221. \n\t(7) You may view this service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.