We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products. That NPRM published in the Federal Register on March 2, 2012 (77 FR 12755). That NPRM proposed to require dimensional inspections of 3rd stage vanes and the rear turbine case. That NPRM also proposed to require inspection of 4th stage vanes at the next LPT overhaul and removal of vanes with non-conforming airfoil fillet radii and vanes with more than one strip and recoat repair. That NPRM also proposed to require disassembly and reassembly of the 2nd stage HPT rotor and 3rd stage LPT rotor at the next HPT and LPT overhauls.
Comments
We gave the public the opportunity to participate in developing this AD. The following presents the comments received on the proposal and the FAA's response to each comment.
Agreement With the Proposed AD
Two commenters, Boeing and FedEx, agreed with the intent of the proposed AD.
Request To Change Compliance Time for the 4th Stage Vanes
One commenter, China Cargo Airlines, requested that we change the inspection compliance time for the LPT 4th stage vanes from ``next LPT overhaul'' to ``next engine overhaul.'' The commenter stated that LPT overhauls are typically performed every other shop visit, which could be in six-to-eight years. The commenter thought that the risk of having a 4th stage vane failure during that time was too high.
We do not agree. We determined that performing the inspections at the next LPT overhaul after the effective date of the AD provides an acceptable level of safety, and that we do not need to reduce the interval. We did not change the AD.
Request for Credit for Prior Compliance
FedEx requested that a statement be included authorizing credit for prior compliance as they have already been performing the requirements of the proposed AD.
We do not agree. Paragraph (e) of the proposedAD already allows credit for prior compliance. That paragraph states to comply with the AD within the compliance times specified, unless already done. We did not change the AD.
Request To Reference Pratt & Whitney Special Instruction No. 17F-09
One commenter, Martinair Holland, requested that we add a reference to Pratt & Whitney Special Instruction No. 17F-09 as an alternate method of compliance (AMOC) for paragraph (e)(1)(iii). The commenter stated that they have been checking the 3rd stage vanes for adequate engagement using that Special Instruction.
We do not agree. The AD requires dimensional inspections that are not included in Special Instruction No. 17F-09. Also, we do not include AMOCs in the requirements of an AD. You may, however, seek an AMOC using the procedures specified in the AD. We did not add that Special Instruction reference to the AD.
Request To Add Service Bulletins as Alternate Methods of Compliance
Martinair Holland, United Airlines, andOnur Air, requested that we add references to Pratt & Whitney Service Bulletins (SBs) PW4ENG 72- 798, PW4ENG 72-804, and PW4G-100-72-221, as alternate methods of compliance to paragraph (e)(1)(v). The commenters stated that they have been inspecting the LPT 4th stage vanes using these SBs.
We do not agree. Paragraph (e) of the proposed AD states to comply with the AD within the compliance times specified, unless already done. If you have already done the proposed actions, then no further action is required to comply with paragraph (e)(1)(v). Also, as noted above, we do not include AMOCs in the requirements of an AD. We did not change the AD.
Request To Include the Part Numbers (P/Ns) of the LPT 4th Stage Vanes
Pratt & Whitney requested that we include the P/Ns of the LPT 4th stage vanes that are subject to the one-time strip and recoat requirement. The commenter stated that it is possible that future designs of LPT 4th stage vanes would not be restricted to a single strip and recoat requirement.
We agree. We listed the P/Ns of the affected LPT 4th stage vanes in the AD.
Request To Define the Word ``Guidance''
United Airlines requested that we define the word ``guidance'' which we used in paragraph (g) of the proposed AD, or, that we revise the wording to specifically detail the inspection/build procedure to be used. The commenter states that using the term ``guidance'' does not denote a specific requirement and only suggests a general direction to be followed.
We agree. Use of the word ``guidance'' in this AD may have caused confusion. We deleted the ``guidance'' paragraphs listed under Related Information from the AD.
Request To Update Guidance Service Information
Pratt & Whitney and United Parcel Service Co. (UPS) requested that we add the words ``or later'' after the service information date references in paragraph (g) of the proposed AD. They also requested that we clarify that the referenced service information could be updated, and compliance to that updated service information would be acceptable. One of the commenters was concerned that service information listed as guidance would be controlled in the same way as service information that is incorporated by reference in the AD.
We do not agree. We do not know how documents will be revised in the future. This AD, however, was revised to remove references to related service information, and therefore the comment no longer applies. We did not change the AD.
Request To Remove the Term ``Overhaul''
United Airlines and UPS requested that we remove the term ``overhaul,'' such as ``LPT overhaul'' and ``HPT overhaul'' from the proposed AD compliance, as the term ``overhaul'' is not industry standard and therefore subjective. The commenters suggested a few alternatives to use instead of the term ``overhaul.''
We partially agree. We do not agree that the term ``overhaul'' should be removed, but we do agree that it should be defined. We addeda definition paragraph which states that, for the purpose of this AD, an overhaul is when all disks in the rotor are removed from the engine and the blades are removed.
Request To Clarify Approved Methods of Compliance
UPS requested that we clarify that the service information listed under Related Information are approved methods of compliance to the proposed AD. They further stated that, as-written, it is not clear that they are approved methods of compliance.
We agree that the AD should be clarified. We revised the AD by
[[Page 60290]]
removing references to related service information.
Request To Duplicate the Strip and Recoat Requirements
United Airlines requested that we duplicate the strip and recoat requirements and make them part of Inspection/Check-01 or Inspection/ Check-03 of the PW4000 Engine Cleaning Inspection and Repair (CIR) Manual. The commenter stated that the strip and recoat limits are currently located in repair-14 of the PW4000 CIR Manual, but repair-14 is not always required to return a vane cluster to service. The commenter stated that the strip and recoat requirements need to be part of the normal inspection process.
We do not agree. The AD mandates that the inspection be performed once, at the next LPT overhaul. That inspection will purge the fleet of LPT 4th stage vanes that have had more than one strip and recoat repair. After that inspection, LPT 4th stage vanes are not allowed to have more than one strip and recoat repair, as specified in the installation prohibition paragraph (f). Revising the engine manuals to relocate the inspection requirements is unnecessary. We did not change the AD.
Request To Remove Reference to 4th Stage Vanes With an Unknown Number of Strip and Recoat Repairs
United Airlines stated that there is no way to identify vanes with an unknown number of strip and recoat repairs. The commenter stated that if there were no markings on the vane, it would indicate that no strip and recoat repairs were performed. This could lead to scrapping vanes that could otherwise be repaired and returned to service.
We agree. We changed the AD to eliminate the reference to LPT 4th stage vanes with an unknown number of strip and recoat repairs.
Request To Make the CIR Inspections More Specific
United Airlines requested that in proposed AD paragraph (e)(1)(iv) we make the CIR inspections more specific for the LPT case dimensions. The commenter stated that there are different ways to perform the measurements and it is not clear whether the dimension to measure is based on an average or an individual diametric dimension.
We do not agree. A specific measurement technique is not defined because multiple measurement techniques exist that are acceptable. The only diametric dimensional inspection required by the AD is index 24, which would be acceptable to measure based on an average dimension. We did not change the AD.
Request To Change ``Ensure AdequateEngagement''
United Airlines requested that in proposed AD paragraphs (e)(1)(iii) and (e)(1)(iv), we change ``ensure adequate engagement'' to ``dimensionally inspect the applicable LPT case slot serviceable dimensions and 3rd stage vane serviceable dimensions per the appropriate CIR.'' The commenter also requested that we list the specific dimensions to inspect by index number. The commenter stated that no mechanic can deduce what an adequate engagement is because it is not specific enough.
We agree. We changed paragraph (e)(1)(iii) to ``dimensionally examine index 13 through index 34 of the LPT 3rd stage vane cluster assembly.'' We also changed paragraph (e)(1)(iv) to ``dimensionally examine index 23 and index 24 of the vane engagement slots on the rear turbine case, where the 3rd stage vane is installed.'' We also listed the specific dimensions to inspect by index number, and included the supporting figures in this AD.
Request To Eliminate Paragraphs
United Airlines requested that we eliminate paragraphs (e)(1)(ii) through (e)(1)(iv) and (e)(2). The commenter stated that these paragraphs are related to procedures that are in the engine manual that operators are already performing. If they are left in the AD, they will add a significant burden in the amount of time and paperwork required to manage and verify compliance to the AD.
We do not agree. The actions in the paragraphs the commenter wants eliminated from the AD represent changes to the manuals that were specifically incorporated to address 3rd and 4th stage vane failures. Although air carriers operating under 14 Code of Federal Regulations (CFR) Part 121 are likely using the most current versions of the engine manuals, not all operators, for example, part 91 operators, may be required to incorporate the latest versions of the engine manuals. Therefore, we must maintain these requirements in the AD to ensure that all operators comply to resolve the unsafe condition. We did not change the AD.
Revision to Cost of Compliance
In reviewing the cost of compliance estimate made in the NPRM (77 FR 12755, March 2, 2012), we determined that we were unable to substantiate our prorated cost estimate for limiting the number of strip and recoat repairs since we do not know how many vanes are operating with more than one strip and recoat repair. We, therefore, removed the estimate of the useful part life expectancy and only included the replacement parts cost. The total cost estimate changed from $32,147,170 to $9,214,170.
Conclusion
We reviewed the relevant data, considered the comments received, and determined that air safety and the public interest require adopting the AD with the changes described previously. We have determined that these changes:
Are consistent with the intent that was proposed in the NPRM (77 FR 12755, March 2, 2012) for correcting the unsafe condition; and
Do not add any additional burden upon the public than was already proposedin the NPRM (77 FR 12755, March 2, 2012).
We also determined that these changes will not increase the economic burden on any operator or increase the scope of the AD.
Costs of Compliance
We estimate that this AD affects 807 engines installed on airplanes of U.S. registry. We estimate that it will take 2 work-hours per engine to perform the LPT 3rd stage vane cluster assembly and rear turbine case inspections. The average labor rate is $85 per work-hour. We expect that about 1,870 LPT 4th stage vane cluster assemblies will be found with the non-conforming casting identification. Replacement parts cost about $4,854. Based on these figures, we estimate the cost of the AD on U.S. operators to be $9,214,170.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: ``General requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on
[[Page 60291]]
products identified in this rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.