Adoption of the Amendment
Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0 1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0 2. The FAA amends Sec. 39.13 by adding the following new AD:
2012-12-13 BAE Systems (Operations) Limited: Amendment 39-17093. Docket No. FAA-2012-0106; Directorate Identifier 2011-NM-150-AD.
(a) Effective Date
This airworthiness directive (AD) becomes effective July 30, 2012.
(b) Affected ADs
None.
(c) Applicability
This AD applies to BAE Systems (Operations) Limited Model BAe 146-100A, -200A, and -300A airplanes, and Model Avro 146-RJ70A, 146- RJ85A, and 146-RJ100A airplanes; certificated in any category; all serial numbers, on which modification HCM30480A, HCM30480B, HCM30480C, HCM30480D, HCM30480E, or HCM30480F are embodied.
(d) Subject
Air Transport Association (ATA) of America Code 26: Fire Protection.
(e) Reason
This AD was prompted by reports of baggage bay fire bottles that can be misassembled such that two squib electrical connectors can be cross-connected. We are issuing this AD to detect and correct excessive wiring loom length and improper connection of the squib connecters, which in conjunction with a fire in one of the baggage bays, could result in the fire extinguishing agent being discharged into a wrong compartment and consequent damage to the airplane.
(f) Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
(g) Inspection/Modification
Within 3 months after the effective date of this AD, do the actions specified in paragraphs (g)(1), (g)(2), (g)(3), (g)(4), (g)(5), and (g)(6) of this AD.
(1) Do a general visual inspection of baggage bay fire bottle WB8 having part number (P/N) 473997-1 for correct connection of the squib connectors identified in paragraphs (g)(1)(i) and (g)(1)(ii) of this AD, in accordance with paragraph 2.C.(3) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011. If any items are found improperly connected, before further flight, reconnect the squib connectors properly, in accordance with paragraph 2.C.(3) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(i) Squib connector WB8P1 (S1446-004A) and cartridge P/N 446307.
(ii) Squib connector WB8P2 (S1446-004D) and squib P/N 446290.
(2) Do a general visual inspection of the length of the wiring loom at the squib connector WB8P2 for excessive length that could cause the connector to become cross-connected with squib connector WB8P1, in accordance with paragraph 2.C.(4) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011. If excessive length is found, before further flight, modify the loom, in accordance with paragraph 2.C.(4) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(3) Do a general visual inspection of baggage bay fire bottle WB7 having P/N 473996-1 for correct connection of squib connectors identified in paragraphs (g)(3)(i) and (g)(3)(ii) of this AD, in accordance with paragraph 2.C.(5) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011. If any items are found improperly connected, before further flight, reconnect the squib connectors properly, in accordance with paragraph 2.C.(5) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(i) Squib connector WB7P1 (S1446-004A) and cartridge P/N 446307.
(ii) Squib connector WB7P2 (S1446-004D) and squib P/N 446290.
(4) Modify the wiring loom to squib connector WB7P2, in accordance with paragraphs 2.C.(6)(a) and 2.C.(6)(c) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(5) Modify the wiring loom to squib connector WB7P1, in accordance with paragraph 2.C.(6)(b) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(6) Install modification HCM36250B, in accordance with paragraph 2.C.(7) of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077- 36250A.B, Revision 4, dated January 7, 2011.
Note 1 to paragraph (g) of this AD: Guidance for test and close- up procedures can be found in paragraphs 2.D. and 2.E. of the Accomplishment Instructions of BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(h) Credit for Previous Actions
This paragraph provides credit for installing the modification HCM36250A required by paragraphs (g)(1), (g)(2), (g)(3), (g)(4), and (g)(5) of this AD, if those actions were performed before the effective date of this AD using the service information specified in paragraphs (h)(1) through (h)(4) of this AD.
(1) BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A, dated September 4, 2009.
(2) BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A, Revision 1, dated September 11, 2009.
(3) BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 2, dated October 14, 2010.
(4) BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 3, dated November 23, 2010.
(i) Other FAA AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19.
[[Page 37777]]
In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the International Branch, send it to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA 1601 Lind Avenue SW., Renton, Washington 98057-3356; telephone (425) 227-1175; fax (425) 227-1149. Information may be emailed to: 9-ANM-116-AMOC-REQUESTS@faa.gov.Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/ certificate holding district office. The AMOC approval letter must specifically reference this AD.
(2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service.
(j) Related Information
Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2011-0065, dated April 7, 2011; and BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077- 36250A.B, Revision 4, dated January 7, 2011; for related information.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register approved the incorporation by reference (IBR) of the following service information under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use the following service information to do the actions required by this AD, unless the AD specifies otherwise.
(i) BAE Systems (Operations) Limited Modification Service Bulletin SB.26-077-36250A.B, Revision 4, dated January 7, 2011.
(3) For BAE Systems (Operations) Limited service information identified in this AD, contact BAE Systems (Operations) Limited, Customer Information Department, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email RApublications@baesystems.com; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm.
(4) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington. For information on the availability of this material atthe FAA, call 425-227-1221.
(5) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at an NARA facility, call 202-741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.