Adoption of the Amendment
Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. The FAA amends Sec. 39.13 by removing airworthiness directive (AD) 2005-02-03, Amendment 39-13948 (70 FR 3867, January 27, 2005), and adding the following new AD:
2011-07-02 Pratt & Whitney: Amendment 39-16639. Docket No. FAA-2010- 0452; Directorate Identifier 98-ANE-80-AD.
Effective Date
(a) This airworthiness directive (AD) is effective April 28, 2011.
Affected ADs
(b) This AD supersedes AD 2005-02-03, Amendment 39-13948.
Applicability
(c) This AD applies to Pratt & Whitney (PW) JT8D-209, -217, - 217A, -217C, and -219 series turbofan engines. These engines are installed on, but not limited to, Boeing 727 series andMcDonnell Douglas MD-80 series airplanes.
Unsafe Condition
(d) This AD results from nine reports of failure of Tinidur material LPT-to-exhaust case bolts, as a result of blade failure, since AD 2005-02-03 became effective. We are issuing this AD to prevent turbine blade failures that could result in uncontained engine debris and damage to the airplane.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.
[[Page 16528]]
Requirements of AD 2005-02-03
Initial Torque Inspection for JT8D-209, -217, and -217A Engines
(f) For JT8D-209, -217, and -217A engines, perform the initial torque inspection of 3rd and 4th stage LPT blades for shroud notch wear. Use the procedures described in Accomplishment Instructions, Part 1, Paragraphs 1 through 3, of PW Alert Service Bulletin (ASB) No. JT8D A6224, Revision 6, dated May 3, 2007, at the applicable threshold in the following Table 1:
Table 1--Initial Torque Inspection Threshold for JT8D-209, -217, and -217A Engines ----------------------------------------------------------------------------------------------------------------
Hours time-in-service (TIS) as of March 3,
Blade type 2005 (the effective date of AD 2005-02-03) Inspection threshold ---------------------------------------------------------------------------------------------------------------- (1) New pre-Service Bulletin (SB) No. Any number................................ Within 6,000 hours TIS.
5867 (small notch) 3rd stage turbine
blades. (2) Refurbished pre-SB No. 5867 (i) Fewer than 3,000...................... Within 4,000 hours TIS.
(small notch) 3rd stage turbine
blades.
(ii) 3,000 or more........................ Within 6,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. (3) New post-SB No. 5867 (large Any number................................ Within 10,000 hours TIS.
notch) 3rd stage turbine blades. (4) Refurbished post-SB No. 5867 (i) Fewer than 6,000...................... Within 7,000 hours TIS.
(large notch) 3rd stage turbine
blades.
(ii) 6,000 or more........................ Within 8,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. (5) New pre-SB No. 6029 (small notch) Any number................................ Within 6,000 hours TIS.
4th stage turbine blades. (6) Refurbished pre-SB No. 6029 (i) Fewer than 3,000...................... Within 4,000 hours TIS.
(small notch) 4th stage turbine
blades.
(ii) 3,000 or more........................ Within 6,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. (7) New post-SB No. 6029 or new post- Any number................................ Within 10,000 hours TIS.
SB No. 6308 (large notch) 4th stage
turbine blades. (8) Refurbished post-SB No. 6029 or (i) Fewer than 6,000...................... Within 7,000 hours TIS.
refurbished post-SB No. 6308 (large
notch) 4th stage turbine blades.
(ii) 6,000 or more........................ Within 8,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. ----------------------------------------------------------------------------------------------------------------
Repetitive Torque Inspections for JT8D-209, -217, and -217A Engines
(g) For JT8D-209, -217, and -217A engines, perform repetitive torque inspections of 3rd and 4th stage LPT blades for shroud notch wear. Use the procedures described in Accomplishment Instructions, Part 1, Paragraph 1 of PW ASB No. JT8D A6224, Revision 6, dated May 3, 2007, at the applicable intervals in the following Table 2 and Table 3:
Table 2--3rd Stage Repetitive Torque Inspection Intervals for JT8D-209, -217, and -217A Engines ----------------------------------------------------------------------------------------------------------------
Inspection torque readings Number of readings Disposition ---------------------------------------------------------------------------------------------------------------- Greater than or equal to 15 LB-IN All....................................... Repeat torque inspection
(1.695 N.m). within 1,000 hours TIS since
last inspection. Less than 15 LB-IN (1.695 N.m) but One or more............................... Repeat torque inspection
greater than or equal to 10 LB-IN within 500 hours TIS since
(1.130 N.m). last inspection. Less than 10 LB-IN (1.130 N.m) but One to three.............................. Repeat torque inspection
greater than orequal to 5 LB-IN within 125 hours TIS since
(0.565 N.m). last inspection. Less than 10 LB-IN (1.130 N.m) but Four or more.............................. Remove engine from service
greater than or equal to 5 LB-IN within 20 hours TIS since
(0.565 N.m). last inspection. Less than 5 LB-IN (0.565 N.m)........ One or more............................... Remove engine from service
within 20 hours TIS since
last inspection. ----------------------------------------------------------------------------------------------------------------
Table 3--4th Stage Repetitive Torque Inspection Intervals for JT8D-209, -217, and -217A Engines ----------------------------------------------------------------------------------------------------------------
Inspection torque readings Number of readings Disposition ---------------------------------------------------------------------------------------------------------------- Greater than or equal to 15 LB-IN All....................................... Repeat torque inspection
(1.695 N.m). within 1,000 hours TIS since
last inspection. Less than 15 LB-IN (1.695 N.m) but One or more............................... Repeat torque inspection
greater than or equal to 10 LB-IN within 500 hours TIS since
(1.130 N.m). last inspection. Less than 10 LB-IN (1.130 N.m) but One to six................................ Repeat torque inspection
greater than or equal to 5 LB-IN within 125hours TIS since
(0.565 N.m). last inspection. Less than 10 LB-IN (1.130 N.m) but Seven or more............................. Remove engine from service
greater than or equal to 5 LB-IN within 20 hours TIS since
(0.565 N.m). last inspection. Less than 5 LB-IN (0.565 N.m)........ One or more............................... Remove engine from service
within 20 hours TIS since
last inspection. ----------------------------------------------------------------------------------------------------------------
[[Page 16529]]
(h) Subsequent repeat inspection intervals must not exceed the previous inspection interval.
JT8D-209, -217, and -217A Engines Removed From Service
(i) JT8D-209, -217, and -217A engines removed from service may be returned to service after a detailed inspection and repair or replacement of all blades of the failed stage, that exceed Engine Manual limits, is done. Information on repairing or replacing turbine blades can be found in Sections 72-53-12 through 72-53-13 of the JT8D-200 Engine Manual, Part No. 773128.
Initial Inspection for JT8D-217C and -219 Engines
(j) For JT8D-217C and -219 engines, perform the initial torque inspection of 4th stage LPT blades for shroud notch wear. Use the procedures described in Accomplishment Instructions, Part 2, Paragraphs 1 through 3 of PW ASB No. JT8D A6224, Revision 6, dated May 3, 2007, at the applicable threshold in the following Table 4:
Table 4--Initial Torque Inspection Threshold for JT8D-217C and -219 Engines ----------------------------------------------------------------------------------------------------------------
Blade type TIS as of March 3, 2005 Inspection threshold ---------------------------------------------------------------------------------------------------------------- (1) New pre-SB No. 6090 (small notch) Any number................................ Within 5,000 hours TIS.
4th stage turbine blades. (2) Refurbished pre-SB No. 6090 (i) Fewer than 3,000...................... Within 4,000 hours TIS.
(small notch) 4th stage turbine
blades.
(ii) 3,000 or more........................ Within 5,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. (3) New post-SB No. 6090, new post-SB Any number................................ Within 10,000 hours TIS.
No. 6402, or new post-SB No. 6412
(large notch) 4th stage turbine
blades. (4) Refurbished "As-Cast'' post-SB Any number................................ Within 7,000 hours TIS.
No. 6090, post-SB No. 6402, or post-
SB No. 6412 (large notch) 4th stage
turbine blades. (5) Refurbished "Modified'' post-SB (i) Fewer than 3,000...................... Within 4,000 hours TIS.
No. 6090, post-SB No. 6402, or post-
SB No. 6412 (large notch) 4th stage
turbine blades.
(ii) 3,000 or more........................ Within 7,000 hours TIS, or
within 1,000 hours TIS from
March 3, 2005, whichever
occurs first. ----------------------------------------------------------------------------------------------------------------
Repetitive Torque Inspections for JT8D-217C and -219 Engines
(k) For JT8D-217C and -219 engines, perform repetitive torque inspections of 4th stage LPT blades for shroud notch wear. Use the procedures described in Accomplishment Instructions, Part 2, Paragraph 1 of PW ASB No. JT8D A6224, Revision 6, dated May 3, 2007, at the applicable intervals in the following Table 5:
Table 5--Repetitive Torque Inspection Intervals for JT8D-217C and -219 Engines ----------------------------------------------------------------------------------------------------------------
Inspection torque readingsNumber of readings Disposition ---------------------------------------------------------------------------------------------------------------- Greater than or equal to 15 LB-IN All....................................... Repeat torque inspection
(1.695 N.m). within 1,000 hours TIS since
last inspection. Less than 15 LB-IN (1.695 N.m) but One or more............................... Repeat torque inspection
greater than or equal to 10 LB-IN within 500 hours TIS since
(1.130 N.m). last inspection. Less than 10 LB-IN (1.130 N.m) but One to six................................ Repeat torque inspection
greater than or equal to 5 LB-IN within 125 hours TIS since
(0.565 N.m).last inspection. Less than 10 LB-IN (1.130 N.m) but Seven or more............................. Remove engine from service
greater than or equal to 5 LB-IN within 20 hours TIS since
(0.565 N.m). last inspection. Less than 5 LB-IN (0.565 N.m)........ One or more............................... Remove engine from service
within 20 hours TIS since
last inspection. ----------------------------------------------------------------------------------------------------------------
(l) Subsequent repeat inspection intervals must not exceed the previous inspection interval.
JT8D-217C and -219 Engines Removed From Service
(m) JT8D-217C and -219 engines removed from service may be returned to service after a detailed inspection and repair or replacement of all blades of the failed stage, that exceed EngineManual limits, is done. Information on repairing or replacing turbine blades can be found in Sections 72-53-12 through 72-53-13 of the JT8D-200 Engine Manual, Part No. 773128.
Other Criteria for All Engine Models Listed in This AD
(n) Whenever a refurbished or used blade is intermixed with new blades in a rotor, use the lowest initial inspection threshold that is applicable.
(o) The initial torque inspection or the repetitive inspection intervals for a particular stage may not be reset, unless the blades for that stage are refurbished or replaced.
(p) Whenever a used (service run) blade is reinstalled in a rotor, the previous used time should be subtracted from the initial torque inspection threshold.
What This AD Changes
LPT-to-Exhaust Case Bolts and Nuts Replacement, and Crushable Sleeve Spacer Installation
(q) At next accessibility to the LPT-to-Exhaust Case bolts and nuts, do the following:
(1) Replace the bolts with part number (P/N) MS9557-26 bolts; and
(2) Replace the nuts with P/N 375095 nuts or P/N 490270 nuts; and
(3) Install crushable sleeve spacers, P/N 822903, under the head of the bolts.
(r) Guidance on replacing the bolts and nuts and installing the crushable sleeve spacers can be found in PW ASB No. JT8D A6494, Revision 1, dated January 26, 2010.
Previous Credit
(s) Initial inspections performed before the effective date of this AD using PW ASB No. JT8D A6224, Revision 5, dated June 11, 2004, or Revision 6, dated May 3, 2007, satisfy the initial inspection requirements of this AD.
[[Page 16530]]
Definitions
(t) For the purpose of this AD, "refurbished'' is defined as restoration of the shrouds and/or blade re-twist per the JT8D-200 Engine Manual, Part No. 773128, or per an operator's approved manual system.
(u) For the purpose of this AD, "As-Cast'' refers to blades that were machined from new castings, and "Modified'' refers to blades that were derived from the pre-SB No. 6090configuration.
(v) For the purpose of this AD, "accessibility to the LPT-to- exhaust case bolts'' refers to when the inner turbine fan ducts are removed.
Alternative Methods of Compliance
(w) The Manager, Engine Certification Office, has the authority to approve alternative methods of compliance (AMOCs) for this AD if requested using the procedures found in 14 CFR 39.19. AMOCs approved for the initial and repetitive inspection requirements of AD 2005- 02-03 are approved as AMOCs for this AD.
Related Information
(x) For information about this AD, contact Ian Dargin, Aerospace Engineer, Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park; Burlington, MA 01803; phone: 781-238-7178; fax: 781-238-7199; e-mail: ian.dargin@faa.gov.
Material Incorporated by Reference
(y) You must use Pratt & Whitney Alert Service Bulletin No. JT8D A6224, Revision 6, dated May 3, 2007, to perform the torque inspections required bythis AD.
(1) The Director of the Federal Register approved the incorporation by reference of this service bulletin in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.
(2) For service information identified in this AD, contact Pratt & Whitney, 400 Main St., East Hartford, CT 06108; phone: 860-565- 8770, fax: 860-565-4503, for a copy of this service information.
(3) You may review copies of the service information at the FAA, New England Region, 12 New England Executive Park, Burlington, MA. For information on the availability of this material at the FAA, call 781-238-7125.
(4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at an NARA facility, call 202-741-6030, or go to http://www.archives.gov/federal_register/code_of _federal_regulations/ ibr_locations.html.